DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />

CHAPTER VI<br />

SCOPE OF WORK AND WORK SPECIFICATION<br />

(Open Trench & HDD)<br />

Specification of work <strong>for</strong> lay<strong>in</strong>g of OF <strong>Cable</strong> <strong>in</strong> PLB HDPE Pipe Coil<br />

underground duct along with its construction & associated <strong>works</strong>.<br />

Section A<br />

1) General: - In order to provide connectivity between telephone exchanges or<br />

otherwise OF <strong>Cable</strong> is required to be laid. The OF <strong>Cable</strong> is usually laid under<br />

ground but may be required to be laid aerially on telephone post especially <strong>in</strong> hilly<br />

area depend<strong>in</strong>g on site conditions.<br />

1.1) The OF <strong>Cable</strong> shall be laid <strong>in</strong> PLB pipe coil duct abbreviated as PLB Pipe<br />

hence<strong>for</strong>th. The PLB pipe shall be of 40 mm & 33 mm outer & <strong>in</strong>ner dia<br />

respectively.<br />

2) SCOPE OF WORK: - The work of lay<strong>in</strong>g of <strong>Optical</strong> <strong>Fibre</strong> <strong>Cable</strong> <strong>in</strong> PLB HDPE Pipe<br />

Coils underground duct along with its construction shall <strong>in</strong>volve follow<strong>in</strong>g activities.<br />

a. Mark<strong>in</strong>g of route on ground where PLB pipe is to be laid underground &<br />

obta<strong>in</strong><strong>in</strong>g permission from concerned authorities.<br />

b. Excavation of trench up to specified depth along National/ State Highways/<br />

other roads <strong>in</strong>clud<strong>in</strong>g those <strong>in</strong> city limits<br />

i. Lay<strong>in</strong>g of PLB pipe Coils (without or with PP rope as specified <strong>in</strong> tender<br />

<strong>in</strong><strong>for</strong>mation) coupled by HDPE sockets <strong>in</strong> excavated trenches.<br />

ii. The PLB pipe shall be sealed by end cap at every hand hole/ Jo<strong>in</strong>t<strong>in</strong>g<br />

Chamber<br />

iii. Fix<strong>in</strong>g of GI pipes/ troughs with clamps at bridges/ culverts and/ or<br />

concret<strong>in</strong>g or chamber<strong>in</strong>g of G.I. Pipes/ troughs, wherever necessary.<br />

iv. Provid<strong>in</strong>g of mechanical protection by D.W.C. Pipes/ GI pipes and/or<br />

concret<strong>in</strong>g/ chamber<strong>in</strong>g accord<strong>in</strong>g to construction specifications,<br />

wherever required.<br />

v. Back fill<strong>in</strong>g and dress<strong>in</strong>g of the excavated trenches.<br />

vi. Lay<strong>in</strong>g of PLB pipe duct through HDD mach<strong>in</strong>e <strong>in</strong> case excavation of<br />

trench is not possible/ wherever necessary.<br />

c. Mak<strong>in</strong>g hand holes/ Jo<strong>in</strong>t<strong>in</strong>g/ Man hole chambers en route.<br />

d. Blow<strong>in</strong>g of OF cable <strong>in</strong> PLB pipe duct.<br />

e. Pull<strong>in</strong>g of OF cable <strong>in</strong> PLB pipe duct with PP rope with proper tools &<br />

accessories.<br />

f. Splic<strong>in</strong>g/ Jo<strong>in</strong>t<strong>in</strong>g of OF cable.<br />

g. Lead<strong>in</strong>g <strong>in</strong> of OF <strong>Cable</strong> <strong>in</strong> the exchange premises.<br />

h. Supply, fix<strong>in</strong>g & pa<strong>in</strong>t<strong>in</strong>g of Route/ Jo<strong>in</strong>t <strong>in</strong>dicators.<br />

i. Documentation.<br />

51 Signature of Bidder with seal