DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />
j. Proof of EPF registration and evidence of EPF contribution (Last paid receipt<br />
not older than 2011) <strong>in</strong> respect of labours / employees employed by the<br />
contractor <strong>for</strong> the execution of <strong>works</strong>.<br />
k. Self attested Photo Copy of PAN Card of the firm/ proprietor.<br />
l. Latest Income Tax Return of the firm/ proprietor.<br />
Note:- The contractors/ bidders will be bound to produce the orig<strong>in</strong>al documents as mentioned<br />
above at the time of tender open<strong>in</strong>g.<br />
(II) F<strong>in</strong>ancial bid shall conta<strong>in</strong> percentage rate quoted Below/At par/Above the<br />
schedule of rates <strong>for</strong> Item Nos 1 to 18 given <strong>in</strong> the Quotation of rates (F<strong>in</strong>ancial<br />
Bid). If the documents <strong>in</strong> the Technical bid are not as per requirement then the<br />
f<strong>in</strong>ancial bid will not be opened.<br />
3.3 The tender document shall be available on sale up to 17.30 hours of 09/05/2012<br />
on all work<strong>in</strong>g days <strong>in</strong> the office of SDE (Tech) % DGM Mtce Kanpur.<br />
4. The last date and time of receipt of tender offer <strong>in</strong> the office of DET OFC-I, CTO<br />
Compound, The Mall, Kanpur-208001 is up to 13-00 hrs of 10 th May’2012 which<br />
will be opened at 14-00 hrs on the same day and same place.<br />
5. S<strong>in</strong>ce the work is of top priority and is, there<strong>for</strong>e, to be carried out <strong>in</strong><br />
stipulated time, only contractors hav<strong>in</strong>g sufficient resources to complete the<br />
work <strong>in</strong> time need to participate.<br />
Timely completion of work is the essence of the contract. There<strong>for</strong>e, no<br />
extension will be granted under normal circumstances.<br />
4 (four) weeks time has been provisioned <strong>for</strong> ROW/ permissions and<br />
organiz<strong>in</strong>g <strong>in</strong>itial setup to start the work.<br />
The duration of completion of work shall be worked out based on execution<br />
of work at 2 Km per week on an average over the period, if necessary, by<br />
provid<strong>in</strong>g additional manpower/mach<strong>in</strong>es. The prospective bidders who are<br />
not capable of deliver<strong>in</strong>g this much output on an average (averaged over<br />
four weeks) should not participate <strong>in</strong> the tender.<br />
6. <strong>Tender</strong> will not be accepted/received after expiry of due date and time. If it happens<br />
to be a holiday on any of the dates above, next work<strong>in</strong>g day will be applicable.<br />
7. It may be noted that if there is any discrepancy <strong>in</strong> NIT & <strong>Tender</strong> document, the<br />
terms and condition <strong>in</strong> the tender document will prevail.<br />
8. It will be the responsibility of the contractor to obta<strong>in</strong> ROW(Right of way)/<br />
Permission from the concerned Road/ Rail/ Forest/ Civic authorities etc, <strong>in</strong>clud<strong>in</strong>g<br />
permission <strong>for</strong> work<strong>in</strong>g <strong>for</strong>m Police/ District/ Civic authorities, as the trench<strong>in</strong>g rates<br />
have been suitably raised. For this, the contractor shall have to coord<strong>in</strong>ate with<br />
various authorities on behalf of BSNL. No separate rates will be applicable <strong>for</strong><br />
gett<strong>in</strong>g permission. However, the payment of ROW/ Permission charges <strong>for</strong><br />
8 Signature of Bidder with seal