Tender for Optical Fibre Cable Protection works in - Northern ...
Tender for Optical Fibre Cable Protection works in - Northern ...
Tender for Optical Fibre Cable Protection works in - Northern ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />
i. Full particulars of the labourers who met with accident.<br />
ii. Rate of wages.<br />
iii. Sex<br />
iv. Age<br />
v. Nature of accident and cause of accident.<br />
vi. Time and date of accident.<br />
vii. Date and time when admitted <strong>in</strong> hospital.<br />
viii. Date of discharge from the hospital.<br />
ix. Period of treatment and result of treatment.<br />
x. Percentage of loss of earn<strong>in</strong>g capacity and disability as<br />
assessed by medical officer.<br />
xi. Claim required to be paid under workmen’s compensation Act.<br />
xii. Date of payment of compensation.<br />
xiii. Amount paid with details of the person to whom the same was<br />
paid.<br />
xiv. Authority by whom the compensation was assessed.<br />
Remarks<br />
� The contractor shall ma<strong>in</strong>ta<strong>in</strong> a Register of F<strong>in</strong>es <strong>in</strong> the <strong>for</strong>m XII of the<br />
CL (R & A) Rules 1971 The contractor shall display <strong>in</strong> a good condition<br />
and <strong>in</strong> a conspicuous place of work the approved list of acts and<br />
omission <strong>for</strong> which f<strong>in</strong>es can be imposed.<br />
� The contractor shall ma<strong>in</strong>ta<strong>in</strong> a Register of Deductions <strong>for</strong> damage or<br />
loss <strong>in</strong> <strong>for</strong>m XX of the CL (R & A) Rules 1971.<br />
� The contractor shall ma<strong>in</strong>ta<strong>in</strong> a Register of advances <strong>in</strong> <strong>for</strong>m XXIII of the<br />
CL(R & A) Rules 1971.<br />
� The contractor shall ma<strong>in</strong>ta<strong>in</strong> a Register of overtime <strong>in</strong> <strong>for</strong>m XXIII of the<br />
CL (R & A) Rules 1971.<br />
e) Attendance card-cum wage slip<br />
i. The contractor shall issue an Attendance card cum wage slip to<br />
each workman employed by him.<br />
ii. The card shall be valid <strong>for</strong> each wage period.<br />
iii. The contractor shall mark the attendance of each workman on<br />
the card twice each day, once at the commencement of the day<br />
and aga<strong>in</strong> after the rest <strong>in</strong>terval, be<strong>for</strong>e he actually starts work.<br />
iv. The card shall rema<strong>in</strong> <strong>in</strong> possession of the worker dur<strong>in</strong>g the<br />
wage period under reference.<br />
v. The contractor shall complete the wage slip portion on the<br />
reverse of the card at least a day prior to the disbursement of<br />
wages <strong>in</strong> respect of the wage period under reference.<br />
vi. The contractor shall obta<strong>in</strong> the signature or thump impression of<br />
the worker on the wage slip at the time of disbursement of<br />
wages and reta<strong>in</strong> the card with him.<br />
f) Employment Card<br />
The contractor shall issue an Employment Card <strong>in</strong> the <strong>for</strong>m XIV of CL<br />
(R&A) central Rules 1971 to each worker with<strong>in</strong> three days of the<br />
employment of the worker.<br />
g) Service certificate<br />
41 Signature of Bidder with seal