2) SPECIAL CONDITIONS OF CONTRACT<br />
DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />
2.1) GENERAL:<br />
a. The work shall be accepted only after SDE Incharge of Acceptance<br />
Test<strong>in</strong>g accepts the work, as per prescribed schedule and work /material<br />
pass<strong>in</strong>g the test successfully.<br />
b. BSNL reserves the right to disqualify such bidders who have a record of not<br />
meet<strong>in</strong>g contractual obligations aga<strong>in</strong>st earlier contracts entered <strong>in</strong>to with<br />
the BSNL.<br />
c. BSNL reserves the right to blacklist a bidder <strong>for</strong> a suitable period <strong>in</strong> case he<br />
fails to honour his bid without sufficient grounds.<br />
d. Any clarification issued by BSNL, <strong>in</strong> response to query raised by<br />
prospective bidders shall <strong>for</strong>m an <strong>in</strong>tegral part of bid documents and it may<br />
amount to amendment of relevant clauses of the bid documents.<br />
e. <strong>Tender</strong> will be evaluated as a s<strong>in</strong>gle package of all the terms given <strong>in</strong> the<br />
price schedule.<br />
f. The work <strong>in</strong> each section may be spilt up between two or more contractors<br />
or accept any tender <strong>in</strong> part and not entirely if considered expedient by The<br />
DGMM Kanpur.<br />
g. All <strong>works</strong> to be executed under the contract, shall be executed under the<br />
direction and subject to the approval <strong>in</strong> all respects by the Divisional<br />
Eng<strong>in</strong>eer <strong>in</strong> – charge of work / site <strong>in</strong>charge who shall be entitled to direct at<br />
what po<strong>in</strong>t or po<strong>in</strong>ts and what manner they are to be commenced, and from<br />
time to time carried on.<br />
h. If the contractor shall desire an extension of time <strong>for</strong> completion of the work<br />
on the grounds of unavoidable h<strong>in</strong>drance <strong>in</strong> execution of work or on any<br />
other ground he shall apply <strong>in</strong> writ<strong>in</strong>g to the Divisional Eng<strong>in</strong>eer with<strong>in</strong> 3<br />
days of the date h<strong>in</strong>drance on account of which he desires such extension<br />
as a<strong>for</strong>esaid. In this regard the decision of DGMM shall be f<strong>in</strong>al.<br />
i. If at any time after the commencement of the work, BSNL feels that<br />
execution of whole or part of work, as specified <strong>in</strong> the tender is not required<br />
to be carried out, then the BSNL shall <strong>in</strong>timate to the contractor <strong>in</strong> writ<strong>in</strong>g of<br />
the fact who shall have no claim to payment of compensation whatsoever<br />
on account of any profit or advantage which he might have derived <strong>in</strong><br />
consequence of the full amount of the work not hav<strong>in</strong>g been carried out. He<br />
shall not have any claim <strong>for</strong> compensation by reason of alterations hav<strong>in</strong>g<br />
been made <strong>in</strong> the orig<strong>in</strong>al specifications, draw<strong>in</strong>gs, designs and <strong>in</strong>structions<br />
which shall <strong>in</strong>volve any curtailment of the work as orig<strong>in</strong>ally contemplated.<br />
This is <strong>in</strong> addition to normal limit of ± 25% value of the work.<br />
j. Whenever any claims aga<strong>in</strong>st the contractor <strong>for</strong> the payment of a sum of<br />
money arises under the contract, BSNL shall be entitled to recover such<br />
sum by appropriat<strong>in</strong>g <strong>in</strong> part or whole the security deposit of the contractor<br />
and to sell any Government promissory notes etc., <strong>for</strong>m<strong>in</strong>g the whole or part<br />
of such security or runn<strong>in</strong>g /f<strong>in</strong>al bill pend<strong>in</strong>g aga<strong>in</strong>st any contract with BSNL<br />
In the event of the security be<strong>in</strong>g <strong>in</strong>sufficient or if no security has been taken<br />
from the contractor, then the balance or the total sum recoverable as the<br />
case may be, shall be deducted from any sum then due or which at any<br />
time there after may become due to the contractor under this or any other<br />
contract with BSNL. Should this sum be not sufficient to cover the full<br />
33 Signature of Bidder with seal