DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />
After pull<strong>in</strong>g of the drum is completed, both ends of the HDPE/PLB pipe <strong>in</strong> each<br />
manhole should be sealed by hard rodent resistant rubber bush, to avoid entry of<br />
rodents/mud <strong>in</strong>to HDPE/PLB pipes.<br />
The Manholes are prepared by provid<strong>in</strong>g 65mm split HDPE/PLB pipe of 2.5 to 3m<br />
length and clos<strong>in</strong>g the split HDPE/PLB pipes by provid<strong>in</strong>g necessary clamps/<br />
adhesive tape as per the directions of Eng<strong>in</strong>eer-<strong>in</strong>- charge. Afterwards, the split/cut<br />
HDPE/PLB pipe are covered with 100 mm split RCC pipe of 2m length and seal<strong>in</strong>g<br />
the ends of RCC pipe with lean cement solution <strong>for</strong> protect<strong>in</strong>g bare cable <strong>in</strong> the<br />
manhole . After fix<strong>in</strong>g of HDPE/RCC Split Pipes necessary back<br />
fill<strong>in</strong>g/re<strong>in</strong>statement and dress<strong>in</strong>g of manholes should be carried out as referred<br />
under trench<strong>in</strong>g. The location of the pull<strong>in</strong>g manhole should be recorded <strong>for</strong><br />
preparation of documentation.<br />
5.3 Jo<strong>in</strong>t<strong>in</strong>g/ Splic<strong>in</strong>g :<br />
The OFC cable drums are usually of 2 km <strong>in</strong> length hence optical fibre jo<strong>in</strong>ts will be<br />
approx. at every 2 Kms. The 6/12/24 fibers are to be spliced at every 2 km & at<br />
both ends (Term<strong>in</strong>ations) <strong>in</strong> the equipment room as directed by the Eng<strong>in</strong>eer-<strong>in</strong>charge.<br />
The Infrastructure required <strong>for</strong> cable splic<strong>in</strong>g is<br />
Splic<strong>in</strong>g mach<strong>in</strong>e<br />
Air Conditioned Van<br />
OTDR<br />
<strong>Optical</strong> talk set<br />
Tool kit etc.<br />
Will be arranged by the bidder at his own cost and also any additional accessories.<br />
e.g. eng<strong>in</strong>e etc. required at site <strong>for</strong> splic<strong>in</strong>g will also be arranged by the bidder at<br />
his own cost.<br />
The optical fibre cable thus jo<strong>in</strong>ted end-to-end will be tested by an officer of A/T<br />
unit <strong>for</strong> splice losses and transmission parameters as specified by TCHQ and<br />
prevalent at that time. The OF cable should meet all the parameters, specified and<br />
no relaxation will be granted.<br />
It should also be ensured that dur<strong>in</strong>g jo<strong>in</strong>t<strong>in</strong>g no fibers are <strong>in</strong>terchanged or broken.<br />
The number of jo<strong>in</strong>ts should not be more than 10 % of the theoretical value<br />
calculated by the department.<br />
Note 1: The jo<strong>in</strong>t<strong>in</strong>g/splic<strong>in</strong>g of optical fibre cable is an optional item. The BSNL<br />
units which are equipped <strong>for</strong> this <strong>works</strong> should preferably carry out this<br />
work departmentally.<br />
6) Construction of Jo<strong>in</strong>t<strong>in</strong>g Chamber :<br />
The jo<strong>in</strong>t chambers are provided at every jo<strong>in</strong>t to keep the O.F.C. jo<strong>in</strong>t well<br />
protected and also to keep extra length of cable, which may be, required to attend<br />
the faults at a later date. Jo<strong>in</strong>t<strong>in</strong>g chambers are to be prepared normally at a<br />
distance of every 2 km. Actual location of jo<strong>in</strong>t<strong>in</strong>g chamber depends on length of<br />
cable drum and appropriateness of location <strong>for</strong> carry<strong>in</strong>g out jo<strong>in</strong>t<strong>in</strong>g work. The<br />
location is f<strong>in</strong>alized by Eng<strong>in</strong>eer-<strong>in</strong>-charge. The jo<strong>in</strong>t<strong>in</strong>g chambers are constructed<br />
either of brick masonry work at site & pre cast RCC slabs <strong>for</strong> covers or by way of<br />