11.07.2015 Views

F4E Annual Report 2010 - Fusion For Energy - Europa

F4E Annual Report 2010 - Fusion For Energy - Europa

F4E Annual Report 2010 - Fusion For Energy - Europa

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PA value total vs signed803.74081kIUA332.139kIUATotal: 1135.87981 kIUATotal PAs vs signed PAs• Completion of two grants for the ISS: one for theexperimental determination of liquid hydrogenholdup in the packing and another for assessingthe 2001 ISS Baseline.Wave Heating Systems• Several grants and ITAs in the area of EC powersupplies and sources have started.Neutral Beam Heating• Signature of the Procurement Arrangement forthe NB Test Facility;15 PAsTo be signedSigned• Award of the procurement contract for the NB ionsource power supplies.Diagnostics• Award of a contract for the manufacture of fulltungsten monoblock mock ups and prototypes;• Award of a contract for the manufacture of a CFCprototypical batch (SNECMA NB41).Remote Handling32 PAsTotal: 47 PAsFig. 4: Total value and number of Procurement Arrangements (PAs)signed between <strong>F4E</strong> and the ITER IO by the end of <strong>2010</strong>• Award of a grant for the continuation of DivertorRemote Handling design and test activities;• Placement or preparation of task orders insupport of the for the conceptual design of theTransfer Cask System;• Placement of task orders and contracts in supportof the design of the In-Vessel Viewing Systemconceptual design and R&D;• Placement of task order and award of a grant insupport of NB RH conceptual design.Cryoplant and Fuel Cycle Systems• Completion of a grants to upgrade the TIMO-2facility for testing the pre-production cryopumpunder ITER relevant conditions;• Completion of a contract for the pre-conceptualdesign of the large (200 m³) tritiated water holdingtanks of the WDS;• Production of first prototypes for the earliestdelivery (outer vessel discrete and continuousexternal Rogowski) magnetics sensors;• Award of a grant for development of steady-statemagnetic field sensors;• Award of a grant for the pre-conceptual designintegration of diagnostics in equatorial port plug1.Site, Buildings and Power Supplies• Signature of the Procurement Arrangement forthe buildings construction;• Award of the Tokamak Pit Excavation and GroundSupport Structure contract, followed by the startof the work;• Delivery of the PF Coil manufacturing buildingdetailed design and start of construction;• Delivery of the Preliminary Design of all the ITERbuildings, in accordance with the <strong>2010</strong> Baseline;• Award of several contracts including architecturaland engineering services for the buildings’ designand works supervision, global insurance and theanti-seismic bearings.Other Systems• Signature of two ITAs covering activities forradioactive waste management and radiologicaland environmental monitoring systems;• Implementation of grants in support to the ITERlicensing programme for the in-vessel dust andtritium inventory measurement.ANNUAL REPORT <strong>2010</strong> FUSION FOR ENERGY25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!