Site, Buildings and Power SuppliesSite and BuildingsIn May <strong>2010</strong>, ITER IO and <strong>F4E</strong> signed the PA onconstruction (PA 6.2.P2.EU.05), for a credit of about350 kIUA, the largest of its kind. The PA deals with<strong>F4E</strong> management of the construction worksite,the interaction between <strong>F4E</strong> and ITER IO duringconstruction, handover and follow-up. In July <strong>2010</strong>,after the site clearance and the levelling work wascompleted, ITER IO handed over the ITER platform to<strong>F4E</strong> and authorised <strong>F4E</strong> to start construction.In <strong>2010</strong>, several important contracts were awardedand related activities started:• The contract for the Design and Construction ofthe PF coils buildings contract (OPE-026) startedin January <strong>2010</strong>, and by August <strong>2010</strong>, after sixmonths of studies, the construction work startedfollowing the granting of the construction permit.By end-<strong>2010</strong> the earthworks and related sitepreparation work was close to finalisation;• The Tokamak pit excavation and support structurecontract (OPE-095) provides for excavationof the time-critical buildings, in advance withrespect of the final design date of the complex.The excavation work started in August and at theend of December the final rock profile was beingexecuted following the excavation of around 200000 m 3 of rock using blasting technologies;• The contract for the 493 Anti Seismic Bearingscontract (OPE-065) (bearings able to mitigateseismic effects on the Tokamak building) startedin July. This contract is on the critical path forthe nuclear buildings meaning that delays inthis contract delay the overall schedule forthe buildings. Prototype tests started and theproduction of the first bearings will start in NewYear 2011;• Architectural and Engineering Services contract(OPE-058), covering the preparation of thedetailed design of all the buildings (based on theFinal Functional Requirements), the tenderingsupport, and the work supervision;• After the contract signature in April, the ArchitectEngineer delivered the Preliminary Design of allthe ITER buildings in September which was laterreviewed by the Legal Inspection Services. Thisdesign takes into account the safety requirementsof the Preliminary Safety <strong>Report</strong>. In parallel, theArchitect Engineer started the Tender Design inorder to be able to launch the call for tenders forthe Tokamak building;Fig. 20: Architectural view of the ITER Building (courtesy of the Engage Consortium)36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!