- Page 2 and 3: FUSION FOR ENERGYAnnual ActivityRep
- Page 4: PAGE45Administrative Activities 49C
- Page 9 and 10: DR FRANK BRISCOE DIRECTOR OF FUSION
- Page 12 and 13: FUSION FOR ENERGYChapter 1Introduct
- Page 14: F4E Offices, BarcelonaANNUAL REPORT
- Page 18 and 19: Fig. 1: A cutaway view of the ITER
- Page 20: The inside of the JET fusion experi
- Page 23 and 24: CHAPTER 3ITERIn its role as the Eur
- Page 25 and 26: Fig. 2: Schedule Summary of the Mai
- Page 27 and 28: Technical Support Activities• Awa
- Page 29 and 30: • A contract for strand character
- Page 31 and 32: • Component design and analyses i
- Page 33 and 34: Fig. 12: Device used to determine t
- Page 35 and 36: Ion Cyclotron HeatingDevelopment of
- Page 37 and 38: Site, Buildings and Power SuppliesS
- Page 39 and 40: • Global Insurance contract (OPE-
- Page 41 and 42: Fig. 24: Stress analysis of the Vac
- Page 43 and 44: CHAPTER 3Broader ApproachEach of th
- Page 45 and 46: with JAEA together with the related
- Page 47 and 48: The final design of the removable B
- Page 50 and 51: FUSION FOR ENERGYChapter 4Administr
- Page 52 and 53: Geographical distribution of operat
- Page 54 and 55: CHAPTER 4Budget, Finance and Accoun
- Page 56 and 57:
CHAPTER 4Human ResourcesPersonnel P
- Page 58 and 59:
CHAPTER 4Control EnvironmentInterna
- Page 60 and 61:
Quality AuditsF4E has established a
- Page 62 and 63:
CHAPTER 4Information Technology,Inf
- Page 64 and 65:
From top to bottom:The group of jou
- Page 66:
CHAPTER 4Staff CommitteeThe Staff C
- Page 72 and 73:
The 18 th meeting of the Governing
- Page 74 and 75:
CHAPTER 5Executive CommitteeThe Exe
- Page 76 and 77:
CHAPTER 5Technical Advisory PanelTh
- Page 78 and 79:
LIST OF ACRONYMSA/EAASCATOBABAUABSM
- Page 80 and 81:
STACSTCSTPSWGTTAPTBMTFUS-DAVCVVWBSW
- Page 82 and 83:
ITER PROCUREMENT ARRANGEMENTSRefere
- Page 84 and 85:
Contract Reference Contract Title C
- Page 86 and 87:
Administrative Procurement Contract
- Page 88 and 89:
AgreementReferenceF4E-2010-GRT-045(
- Page 90 and 91:
iter task agreementsReferenceTitleC
- Page 92 and 93:
iter calls for nomination or expert
- Page 94 and 95:
status of efda contractsStatusContr
- Page 96 and 97:
isk managementThe risk management a
- Page 98 and 99:
Event Risk Assessment Matrix [Level
- Page 100 and 101:
composition of the governing boardC
- Page 102 and 103:
composition of the technical adviso
- Page 104 and 105:
organisational chart(on 31 December
- Page 106 and 107:
implementation of the 2010 budgetRe
- Page 108 and 109:
iter credit allocationDescription D
- Page 110 and 111:
Gender - all staffFemale36%Male64%n
- Page 112 and 113:
contract agents by function groupOf
- Page 114 and 115:
declaration of assuranceI, the unde
- Page 116 and 117:
analysis and assessment by the gove