Volume I: Investment Prospectus Rwanda Electricity Sector Access ...
Volume I: Investment Prospectus Rwanda Electricity Sector Access ...
Volume I: Investment Prospectus Rwanda Electricity Sector Access ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 4.4: Existing <strong>Electricity</strong> Network (left) and Potential Micro-hydro Sites (right)Notes: The potential micro-hydro sites shown are selected from the hydro atlas based on a potential installedcapacity of ≤ 1,000 kVASource: NUR CGIS and Ministry of Infrastructure / BTC “Hydropower Atlas”.The affordability of electricityOne of the major constraints on expanding access to electricity in <strong>Rwanda</strong> will be the limitedability of most households to pay for electricity. Figure 4.5 (below) shows the proportion ofhouseholds that have daily expenditure levels of less than US$1.25 per day. In most areas ofthe country, between 50 and 80 percent of households spend less than $1.25 per day. Thisrepresents a barrier to significantly expanding the use of electricity.Figure 4.5: Proportion of Population in <strong>Rwanda</strong> Living on Less than $1.25 per DaySource: EICV2 Survey20