Figure 4.16 (below) indicates the location of all health centres and their planned connectionstatus (grid or off-grid) and the location of prioritised micro-hydro sites supply by the end of2012. The number of health centres in <strong>Rwanda</strong> is assumed to grow at the same rate as thetotal population of the country. Under the access programme, all health centres will haveelectricity access by 2012. More than half of the health centres will have grid supply (53percent), while the remaining health centres (47 percent) will receive solar PV systems.Figure 4.16: Health Centre <strong>Access</strong> to <strong>Electricity</strong> by 201236