11.07.2015 Views

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 2.2: Comparative Data from Africa on GDP and <strong>Electricity</strong>Consumption 6Figure 3.1: Overview of Government Initiatives to Enhance the <strong>Electricity</strong><strong>Sector</strong> 8Figure 3.2: <strong>Electricity</strong> <strong>Sector</strong> Players in <strong>Rwanda</strong> 10Figure 4.1: Overview of Approach to Electrification Planning 15Figure 4.2: Administrative Boundaries (left) and Population Density(right) 18Figure 4.3: Location of Administrative Offices (left) and Health Centres(right) 19Figure 4.4: Existing <strong>Electricity</strong> Network (left) and Potential Micro-hydroSites (right) 20Figure 4.5: Proportion of Population in <strong>Rwanda</strong> Living on Less than $1.25per Day 20Figure 4.6: Areas within 5 kilometres of Existing <strong>Electricity</strong> DistributionNetwork 22Figure 4.7: Results of the Least Cost Technology Model 24Figure 4.8: Least Cost Grid Prioritisation for 2009 27Figure 4.9: Least Cost Grid Prioritisation for 2010 27Figure 4.10: Least Cost Grid Prioritisation for 2011 28Figure 4.11: Least Cost Grid Prioritisation for 2012 28Figure 4.12: Least Cost Grid Prioritisation for 2013 29Figure 4.13: Plan to Achieve 100 Percent Grid Coverage of Administrative<strong>Sector</strong>s 30Figure 4.14: Least Cost Grid Prioritisation to 2020 31Figure 4.15: Location of Prioritised Micro-hydro Sites 34Figure 4.16: Health Centre <strong>Access</strong> to <strong>Electricity</strong> by 2012 36Figure 4.17: School <strong>Access</strong> to <strong>Electricity</strong> by 2012 37Figure 4.18: Administrative Centre <strong>Access</strong> to <strong>Electricity</strong> by 2012 38Figure 4.19: Overall Electrification <strong>Access</strong> Programme to 2013 39Figure 5.1: Projected Costs pre kilometre of MV Line Compared to RecentProjects 44Figure 5.2: Overview of <strong>Sector</strong> Financial Flows 47Figure 5.3: Overview of Least-cost Generation Dispatch (2009-2013) 48Figure 5.4: Projected <strong>Electricity</strong> <strong>Sector</strong> Net Operating Cash Flows (2009–2013) 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!