11.07.2015 Views

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

Volume I: Investment Prospectus Rwanda Electricity Sector Access ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4.18 (below) indicates the location of all administrative offices and their connectionstatus (grid or off-grid) and the location of prioritised micro-hydro sites supply by the end of2012. Under the access programme, all administrative offices will have electricity access by2012. Most administrative offices will have 24-hour grid supply (55 percent), while theremaining administrative offices (45 percent) will receive solar PV systems.Figure 4.18: Administrative Centre <strong>Access</strong> to <strong>Electricity</strong> by 2012The installation of solar PV systems at social facilities that will not be connected to the gridby 2012 helps to ensure that the benefits of electricity will be accessible for all <strong>Rwanda</strong>ns.Due to the limits on the number of new household connections that are feasible, the solarPV programme will provide an important parallel to the main grid and micro-hydrocomponents that can connect a large number of households. By providing electricity toremote social facilities, citizens that do not have household access by 2012 will at least beable to unlock the benefits of improved health, education and civic services. As discussed inSection 7, the solar energy programme funded by members of the European Union is anotable example of early donor commitment to the access programme. <strong>Investment</strong>s thathave already received some funding have been taken into account in estimating theadditional funding required.4.6 Summary of the Technical Plan for the <strong>Access</strong> ProgrammeFigure 4.19 (below) combines the grid and off-grid elements of the access programme to2012 into a single geospatial plan.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!