11.07.2015 Views

drawings

drawings

drawings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CI = CERTIFIED INSTALLERGC=GENERAL CONTRACTORES=EQUIPMENT SUPPLIERWM=WAL-MARTQTY53124422111582633112642211122214112NODESCRIPTIONEQUIPMENT SCHEDULEMANUFACTURERMODEL NOINSTALLED BYFINAL CONNSUPPLIED BYAC000-ESCHNOTESGENERAL NOTES1NOTESALL TANKS AND PIPING TO BE INSTALLED AND PROPERLY TESTED IN ACCORDANCE WITH ALL APPLICABLE CODES AND MANUFACTURER REQUIREMENTS. REF SPECIFICATIONS.2 ALL PIPING AND FITTINGS TO BE SUPPLIED BY GENERAL CONTRACTOR AND INSTALLED BY CERTIFIED INSTALLER1 FURNISHED BY WAL-MART AND INSTALLED BY GENERAL CONTRACTOR PER MANUFACTURER'S SPECIFICATIONS2 GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE DELIVERY SCHEDULE REF SPECIFICATIONS3 STEEL MOUNTING PLATE FOR WASTE OIL PUMP BY LIFT MANUFACTURER4 NOT USED5 HOSES ROUTED THROUGH EMBEDDED PIPE SLEEVE. REF MECHANICAL6 TB900 SHALL BE PROVIDED WITH LIFTGENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE INSTALLATION SCHEDULE REF SPECIFICATIONS8 REF MECHANICAL FOR LOCATION9 REFER TO SPECIFICATIONSNOTE:VERIFY EQUIPMENT REQUIRED WITHEQUIPMENT SCHEDULE, ARCHITECTURAL ANDMEP DRAWINGS.EXISTING SUMP PUMPEXISTING LADDERCORE DRILL (2) 6"DIAMETER HOLES 6" APARTTHRU EXISTING SLAB THENCUT BETWEEN TO CREATEONE HOLE. RUN VENT PIPESTHRU SLAB THEN THRU ROOF12'-0"1. WALMART ENVIRONMENTAL MANAGEMENT ANDSUPPORT SHALL BE RESPONSIBLE FOR EMPTYING,HANDLING, REMOVAL AND DISPOSAL OF ALL AST TANKS2. GENERAL CONTRACTOR SHALL PROVIDEDISCONNECTION OF ALL EQUIPMENT, LINES, PIPES ANDRETAINING HARDWARE.3. GENERAL CONTRACTOR SHALL NOT PERFORM ANYWORK BEFORE TANK HAS BEEN EMPTIED.4. GENERAL CONTRACTOR SHALL COORDINATE ALL WORKWITH WALMART CONSTRUCTION MANAGER.5. WALMART CONSTRUCTION MANAGER SHALL CONTACTGREG ROWLAND OR PAT GUTHRIE WITH WALMARTENVIRONMENTAL MANAGEMENT AND SUPPORT FOR TANKREMOVAL COORDINATION (479-204-2108 OR 479-204-2501)1. ONLY REMOVE BULK WASTE, WINDSHIELD FLUID, SPECIALTY OIL AND DIY TANK IF SHOWN TO BE REMOVED. REF GENERAL NOTES1. REF A7 FOR SCHEDULE FINISH KEYSTIPULATION FOR REUSE710 West Roselawn DriveRogers, Arkansas 72756Phone: 479.636.3545Fax: 479.636.1209Architect of RecordBradley J. Phillips8"RELOCATE EXISTING 400 GALLON BULK OIL TANKREMOVE EYEWASHREF MEPRELOCATE EXISTING PLASTIC WINDSHIELD WASHER FLUID TANKEXISTING GEAR OIL,CHASSIS GREASEAND CONTAINMENTCORE DRILL (2) 6" DIAMETER HOLES6" APART THRU EXISTING SLAB THENSAWCUT BETWEEN TO CREATE ONEHOLE. RUN VENT PIPES THRU SLABTHEN THRU ROOFREF MEP AND 3,4,10-AC2RELOCATEEXISTING 400GALLON BULKOIL TANKCORE DRILL (2) 6" DIAMETER HOLES6" APART THRU EXISTING SLAB THENSAWCUT BETWEEN TO CREATE ONEHOLE. RUN VENT PIPES THRU SLABTHEN THRU ROOFREF MEP AND 3,4,10-AC28"UP11{}"1'-10{}"8"SERVICE PLATFORMLUBE PITEXISTING SHELVES TO REMAINSERVICE PLATFORMSTORE NO.GENERAL REMODELJOB NUMBER:RELOCATEEXISTING 800GALLON WASTEOIL TANKISSUE BLOCKENVIRONMENTAL CAGETIRE & BATTERY STORAGECHECKED BY:DRAWN BY:PROTO:188EXISTING SUMP PUMPREF 2,3-AC1 FOR PIT DEMOLITION AND PIT PLAN (BELOW)PROTO CYCLE:DOCUMENT DATE:11-19-1002-09-11EXISTING LADDERVENT PIPING THROUGH FLOOR ABOVEREF MEP AND 3,4,10-AC2RELOCATED 400GALLON BULKOIL TANK14'-2"NEW EYEWASHREF MEP ANDN1 FOR STRIPPINGREQUIREMENTS3"MINEXISTING VENDINGRELOCATED EXISTING PLASTIC WINDSHIELD WASHER FLUID TANKTLE SERVICEEXISTING GEAROIL, CHASSISGREASEAND CONTAINMENTVENT PIPING THROUGH FLOORABOVEREF MEP AND 3,4,10-AC211'-10"SERVICE PLATFORMEXISTING SHELVESSERVICE PLATFORMDNRELOCATED 400GALLON BULKOIL TANK2'-2"RELOCATED 800GALLON WASTEOIL TANK3"MINPRINTED: 8/4/2011 3:27 PM BY: Brenda Garrison LAST SAVED: 8/2/2011 11:46 AM BY: LukeSpurgeone:\2010xxx\2010-0452 ruston_la\4condoc\188 (general remodel-2)\arch\sheets\ac010.dwg3"MINNEW FILTER CRUSHER AND WASTE OIL RESERVOIR3"MINEQUALEQUALWASTE OIL PUMPRELOCATED EWC REF MEP2'-0"NEW EYEWASHREF MEPNOT FORCONSTRUCTIONSHEET:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!