11.07.2015 Views

drawings

drawings

drawings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15EXISTING DUCTDOWN TO PITREBALANCE TO2500 CFMAUTO CENTER NOTESSUMP PIT1. REFERENCE ARCHITECTURAL SHEETS FOREQUIPMENT SCHEDULE.3/4"15.473EXISTING CWEXISTING 3/4" COLDWATER AND AIR UPTHRU FLOORNEW AST VENT PIPE ROUTED UP THRU NEW CHASE CUT THRU SLAB. REF: 1-MAC1 FOR CONTINUATION.15.466(2) 1" ELECTRICAL CONDUITS, REFERENCE ELECTRICAL SHEETS.13'-0"AEXISTING BULKOIL PUMP15.48110W-3015.482TYPRELOCATED BULK OIL TANK15.461142. PROPERLY INSTALL UNISTRUT AND PIPEBRACKETS FOR ALL NEW AND RELOCATEDPIPING. EVERY UNISTRUT SHOULD BEINSTALLED 12 INCHES BEFORE AND AFTEREACH PIPE BEND, A MAXIMUM OF 10 FEETAPART FOR VERTICAL PIPING, AND FORANY PIPING BEING ADDED TO PIPECLUSTER. REFERENCE SPECIFICATIONSFOR MAXIMUM DISTANCE BETWEENUNISTRUT PIPING SUPPORTS FORHORIZONTAL PIPING.3. INSTALL VTR'S A MINIMUM OF 24" ANDFLUES A MINIMUM OF 36" FROM ROOFEDGE AND/OR PARAPET WALLS. INSTALLVTR'S, FLUES AND EXHAUST FANS AMINIMUM OF 10 FT FROM OUTSIDE AIRINTAKE OF ROOF TOP UNITS. INSTALLEXHAUST FANS AND ROOF TOP UNITS AMINIMUM OF 10 FT FROM ROOF EDGE OR AMINIMUM OF 60" FROM PARAPET WALLSTHAT ARE AT LEAST 42" HIGH.STIPULATION FOR REUSE1/2"4RELOCATEDEWC4EW11/2"3/4" TEPID WATERLINE ABOVE CEILINGTEPID%EYEWASH WATER RISER1/4"=1'-0"15.4023/4" TEPID WATER LINE ABOVE CEILING15.401133/4"TOILETEWCETRLAVETRT3/4"CW3/4"HWETMV2WCETRTLE RESTOOM%MECHANICAL/PLUMBING TLE PLAN1/4"=1'-0"WCOETRNEW WH2 ABOVE CEILINGFDETRROUTE NEW 3/4" HW AND CW TO NEW ETMV2NEW WH2ETMV2 TO SUPPLY TLESERVICE BAY ANDSERVICE PIT, MOUNT AT60" AFFREF 5/MAC1MAC2REF EMERGENCY THERMOSTATIC MIXING VALVE, (ETMV) MOUNTING ELEVATION (SIM)NEW AST VENT PIPE ROUTED UP THRU NEW CHASE CUT THRU SLAB. REF: 1-MAC1 FOR CONTINUATION.15.46615.464EXISTING CONTAINMENT PALLETEXISTING WINDSHIELDWASHER FLUID PUMPRELOCATED WINDSHIELDWASHER FLUID TANKEXISTINGCHASSIS GREASENEW 3/4" TEPIDWATER UPTHRU FLOOREXISTING BULKOIL PUMP15.464NEW 3/4" AIR(2) NEW AST VENT PIPES, ROUTED UP THRU NEW CHASE CUT THRU SLAB. REF: 1-MAC1 FOR CONTINUATION.3'-0"MINTHOSE BIBBETREXISTINGGEAR OILMAC2EW13/4" TEPID WATER LINEWMAC315.466TYPCGA5W-30GOEXISTING BULKOIL TANKSAFETY AREA TO BEMAINTAINED FREE AND CLEARFOR EYEWASH.REF: ARCH SHEETSMAC215.464MAC215'-10"A3"5W-3011"CGGOW10W-30EXISTING RACKS TO REMAIN15.464RELOCATED WASTEOIL TANKMAC2ANEW 3/4" AIRNEW 1" WASTE OIL LINE15.461MAC3MAC2TB925TB801TB801(25 GALLON USED OIL RESERVOIR), KIT INCLUDES TB816(UP FLOW VENT).15.46015.466TYP15.40115.40215.42215.46015.46115.46415.46615.46815.47315.48115.482PLUMBING KEYNOTESCONNECT TO NEAREST DOMESTIC COLDWATER PIPE OF EQUAL OR LARGERSIZE. VERIFY SIZE AND LOCATION ATSITE. PROVIDE SHUT-OFF VALVE INNEW PIPE AT POINT OF CONNECTION.CONNECT TO EXISTING HOT WATERPIPE OF EQUAL OR LARGER SIZE.VERIFY SIZE AND LOCATION AT SITE.PROVIDE SHUT-OFF VALVE IN NEWPIPE AT POINT OF CONNECTION.EXISTING PIPING TO REMAIN (VERIFYLOCATION IN FIELD).NEW 2" GALVANIZED STEEL VENTPIPING THROUGH ROOF. INSTALLUPFLOW VENT CAP. DO NOT MANIFOLDVENT WITH OTHER TANK VENTS ORPLUMBING VENTS.PROPERLY CAP AND REMOVE EXISTINGWASTE OR BULK OIL LINES NOT BEINGREUSED.PROVIDE A MINIMUM OF 3"INSPECTION SPACE BETWEEN ALLWALLS, COLUMNS, TANK AND RAILINGS.SLOPE VENT PIPING BACK TO TANK AT1/8" PER FOOT.ROUTE PIPING IN NEW CHASE DOWNTHROUGH FLOOR TO PIT AREA. REF.ARCHITECTURAL DRAWINGS FORLOCATION.SUPPORT NEW PIPING WITHINSTRUCTURE OR AS CLOSE TO BOTTOMOF STRUCTURE AS POSSIBLE.COORDINATE ROUTING WITH EXISTINGEQUIPMENT.SUPPORT PIPING ALONG WALL.COORDINATE ROUTING WITH EXISTINGEQUIPMENT.ALL WORK TO BE DONE BY CERTIFIEDINSTALLER. REFERENCE ARCH.SPECIFICATIONS.ISSUE BLOCKRUSTON, LOUISIANASTORE NO. 0023-201GENERAL REMODEL2010-0452JOB NUMBER:07-14-11 PLAN REV. #108-05-11 ADDENDUM #1EQUALEQUALNEW WASTEOIL PUMP1312ROUTE NEW PIPES AS HIGH AS POSSIBLE WITH HANGERS SUSPENDED ( PER SPECIFICATIONS) EVERY 4'-0" MINIMUM FROM PIT CEILING SUPPORT BEAMS. (DASHED LINES INDICATE ALTERNATE ROUTING OF PIPES THRU ALTERNATE FLOOR PENETRATION BETWEEN CATWALKS).NEW OIL FILTER CRUSHERTB925MAC213TB61012%TLE PIT PLUMBING PLAN1/4"=1'-0"RELOCATED DIY TANK, REF 10/MAC2CHECKED BY:DRAWN BY:JEEJMOTIRE & BATTERY STORAGEPROTO:PROTO CYCLE:DOCUMENT DATE:18811-19-1002-09-1115 141514EXISTING DUCTDOWN TO PITEXISTING 3/4" COLD WATERDOWNTHRU FLOORYCO ETRFPWH ETRCUSTOMER SERVICECO ETRFD ETRAFD ETRFD ETRFD ETR400CFMETR15.4661/2"15.422EF ETRTLE LUBE TRENCHSAWETRSAWETRTLE SERVICE BAYRTU-3710 TONETRTLERESTROOMEFETREAGETR50CFMETREAGETR250CFMETREF ETRSTORAGERTU-203 TONETR400CFMETRRAGETRNEW AST VENT PIPE, ROUTED FROM AST TANK IN PIT BELOW. REF: 2-MAC1 FOR CONTINUATION.NEW AST VENT PIPE, ROUTED FROM AST TANK IN PIT BELOW. REF: 2-MAC1 FOR CONTINUATION.4MAC3NEW 3/4" TEPIDWATER DOWN15.4682"V(2) 1" ELECTRICAL CONDUITS, REFERENCE ELECTRICAL SHEETS.15.4662"VMAC3TB816UPFLOW VENT CAPMAC3TB816UPFLOW VENT CAPA15.422FCO ETROI ETR3/4"FCO ETRLUBE & TIRE MOUNTING AREAA15.473AA3/4"TOILETAIRDRYERETR4MAC1AIRCOMPRESSORETRCUSTOMER SERVICE15.422100CFMETRSECURITY4MAC315.466SAFETY AREA TO BE MAINTAINEDFREE AND CLEAR FOR EYEWASH.REF: ARCH SHEETSNEW 1/2"TEPID WATERSECURITYSTORAGEMAC315.401S:\Wal-Mart\W447\D\W447MAC1 2 Aug 2011 - 5:08 pm%TLE MECHANICAL PLAN1/8"=1'-0"MAC115.468CO ETR2"VFD ETRTB816UPFLOW VENT CAPPREFERRED ROUTING. (2) NEW AST VENT PIPES, ROUTED FROM AST TANKS IN PIT BELOW. REF: 2-MAC1 FOR CONTINUATION.4MAC3RELOCATEDEWCFD ETRYCO ETRCONNECT NEWTEPID WATER LINETO NEW EYEWASHFD ETR%TLE PLUMBING PLAN1/8" = 1'-0"EW1FD ETRRELOCATE EXISTING EWC. REMOVE ABANDONED CW LINEFPWH ETREXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS.EACH SUBCONTRACTOR IS RESPONSIBLE IS RESPONSIBLE FOR HAVING FOR A THOROUGH HAVING A KNOWLEDGE THOROUGHOFALL KNOWLEDGE DRAWINGS AND OF SPECIFICATIONS ALL DRAWINGS AND THEIR SPECIFICATIONS RELATED FIELD. THE IN FAILURE THEIRTOACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THERESPONSIBILITY RELATED FIELD. OF THE PERFORMING FAILURE THE TO WORK ACQUAINT PROPERLY. THEMSELF NO ADDITIONAL WITH THISCOMPENSATION KNOWLEDGE DOES SHALL BE NOT ALLOWED RELIEVE BECAUSE THE RESPONSIBILITY OF CONDITIONS THAT OF OCCUR DUETO PERFORMING FAILURE TO FAMILIARIZE THE WORK WORKERS PROPERLY. WITH THIS NO ADDITIONAL COMPENSATIONKNOWLEDGE. SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUETO FAILURE TO FAMILIARIZE WORKERS WITH THISKNOWLEDGE.AUTO CENTERMECHANICALPLANSSHEET:MAC1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!