11.07.2015 Views

drawings

drawings

drawings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SINKELECTRICAL KEYNOTESELECTRICAL KEYNOTESELECTRICAL KEYNOTEST5EABOVET5BH5C2H5C1H5DH5AL5D1L5D2%ELECTRICAL ROOM #51/8"=1'-0"L5ENOVARCONTROLPANELPOWERSUPPLYMODULENOVARBOARD4FIREALARMPANELH3SL3FH3CH3AXFMRT3F(ABOVE)L3D1L3D2DATARACKELECTRICAL%ROOM #31/8"=1'-0"H3DXFMRT3DXFMRT2E(ABOVE)4L2EL2U1L2D1UPSPOWERSUPPLYMODULEDATARACKL2D2L2BL2D3L2D4H2DNOVARCONTROLPANELELECTRICAL%ROOM #21/8"=1'-0"XFMRT2D(ABOVE)XFMRT1E(ABOVE) L1U L1ENOVAR & FIRE ALARM BOARDNOVARCONTROLPANELUPSXFMRT1D(ABOVE)POWERSUPPLYMODULEL1D2L1D1L1FH1C3H1C2H1C1H1AXFMRT1F(ABOVE)MSWB%ELECTRICAL ROOM #11/8"=1'-0"16.22816.23416.47016.471INSTALL RECEPTACLE IN PROVIDED DATA ENCLOSURE. COORDINATE LOCATION OF RECEPTACLE WITH ISD CABLE VENDOR.EXTERIOR SIGN POWER: MOUNT JUNCTION BOX(ES) TO WALL IN CEILING SPACE 6" BELOW BOTTOM CHORD OF BAR JOIST, UNLESS NOTED OTHERWISE. COORDINATE LOCATION OF ACCESS DOORS AND PROVIDE FINAL POWER TERMINATIONS. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT SIGN LOCATION(S) PRIOR TO INSTALLATION. TOGGLE SWITCH PROVIDED WITH SIGN.FURNISH AND INSTALL NEW 20 AMP,120 VOLT CIRCUIT(S). FEED FROM PANELBOARD AS INDICATED.PROVIDE20A-1P CIRCUIT BREAKER IF NEEDED. EC SHALL MATCH TYPEAND AIC RATINGS OF EXISTING CIRCUIT BREAKERS. EC SHALLVERIFY PRIOR TO ROUGH-IN THAT EXISTING PANELBOARD HASSPARE CAPACITY TO ACCOMMODATE ADDITIONAL LOAD.FURNISH AND INSTALL NEW 20 AMP,120 VOLT ISOLATED GROUND CIRCUIT(S). FEED FROMPANELBOARD AS INDICATED. PROVIDE 20A-1P CIRCUIT BREAKERIF NEEDED. EC SHALL MATCH TYPE AND AIC RATINGS OFEXISTING CIRCUIT BREAKERS. PROVIDE ORANGE COVER PLATESON ALL ISOLATED GROUND DEVICES WITH CIRCUIT NUMBERENGRAVED UNLESS NOTED OTHERWISE. EC SHALL VERIFYPRIOR TO ROUGH-IN THAT EXISTING PANELBOARD HAS SPARECAPACITY TO ACCOMMODATE ADDITIONAL LOAD.STIPULATION FOR REUSE15 14 13 12 11 104BALERPHARMACY STORAGECORRIDORSECURITYROOMSPRINKLERUPC/INVOICINGPHOTO STORAGEMANAGER'S OFFICEE2.4MARKET MANAGER'S OFFICEFIXTURE STORAGEBALERELECTRICALROOM #1FIXTURESLUBE & TIRE MOUNTING AREACOMPACTORTIRE & BATTERY STORAGECUSTOMER SERVICERECEIVING-{GM}EXISTINGETHERNETSWITCHTOILETBIKE BUILDERS DESKE2.4REPLACE BROKEN ELECTRICAL COVERS AND RECEPTACLES. TYPICAL OF ALL STOCKROOM/RECEIVING AREAS.STOCKROOMSTOCKROOME2JANITORNETWORKTVETRSITE TO STOREBREAKROOMNETWORKTVETRTRAININGASSOCIATES MEN'S RESTROOMASSOCIATES WOMEN'S RESTROOMCBLAP OFFICEMANAGEMENTCUSTOMERMENCUSTOMERWOMENCORRIDORNETWORKTVETRHALLWAYDAIRY COOLERDELI FREEZERDELI COOLERDELI PREPSERVICE DELIDEPT. 82RECEIVING-{GR}16.22837L5D116.471STOCKROOMGE2COMPACTORFIRE CORRIDOR4E2.4RUSTON, LOUISIANASTORE NO. 0023-201GENERAL REMODEL2010-0452JOB NUMBER:ISSUE BLOCKSECURITYGROCERY FREEZERELECTRICALROOM #507-14-11 PLAN REV. #108-05-11 ADDENDUM #1ELECTRICAL ROOM #4GENERAL POWER NOTES09.24.10EN02E21.STORAGEMEAT COOLERFTELEPOWER POLE(S): MOUNT JUNCTION BOX(ES) TO TOP SIDE OF BOTTOM CHORD OF BAR JOIST. INSTALL FURNISHED PRE-WIRED POWER POLE AND TERMINATE PROVIDED FLEXIBLE CONDUIT AND WIRING TO JUNCTION BOX. PROVIDE UNISTRUT SUPPORTS AND HARDWARE TO SECURE TELEPOWER POLE PLUMB TO BUILDING STRUCTURE.E52.EXISTING PHOTO LABSALESMEAT PREPEXISTINGETHERNETSWITCH3.PROVIDE LIQUID-TIGHT FLEXIBLE METAL CONDUIT AND WIRING FROM DISCONNECT SWITCH OR JUNCTION BOX TO EQUIPMENT KNOCKOUT OR ELECTRICAL CONNECTION POINT.WHERE EQUIPMENT NAMEPLATE PROTECTIVE DEVICE RATING DIFFERS FROM SIZE PROVIDED, CHANGE OUT BRANCH CIRCUIT WIRING AND OVERCURRENT DEVICE TO APPROPRIATE RATING PER NEC.CHECKED BY:JEEE4.DRAWN BY:TJPLPTVETRGENERAL CONTRACTOR TO PROVIDE ONE NEW 20 AMP, 120 VOLT CIRCUIT FOR EACH PIECE OF NEW EQUIPMENT AS FOLLOWS: (1) HP PRINTER (24" WIDE FORMAT PRINTER), (1) HP COLOR PRINTER AND (1 OR 2) DL PRINTER(S) AS SHOWN ON DRAWINGS. FEED FROM NEAREST 120 VOLT PANEL WITH ADEQUATE SPACE AND AMPACITY. PROVIDE NEW CIRCUITS TO STRUCTURE ABOVE EXISTING PHOTO LAB PRIOR TO EQUIPMENT VENDOR ARRIVAL. VERIFY FINAL DROP LOCATION WITH VENDOR PLACEMENT OF EQUIPMENT.REPLACE BROKEN ELECTRICAL COVERS AND RECEPTACLES. TYPICAL OF ALL SALES FLOOR AREAS.GROCERY SALESMEAT HOLDINGGROCERY COOLERICE CREAM FREEZERELECTRONIC FIRE PROTECTION/SECURITY ALARM BOXES AND CONDUITS SHOWN ON POWER PLANS SHALL BE PROVIDED UNDER THIS CONTRACT. IN ADDITION, UNLESS NOTED OTHERWISE, THE FOLLOWING GENERAL NOTES APPLY:A.B.ALL ALARM JUNCTION BOXES SHALL BE 4"X4"X2-1/8" MINIMUM.ALARM RACEWAYS SHALL BE 3/4" MINIMUM WITH PULL WIRE AND INSULATING BUSHINGS AT END OF VERTICAL RACEWAY RUN.PROTO:PROTO CYCLE:DOCUMENT DATE:18811-19-1002-09-11C.LPTVETRGENERAL CONTRACTOR TO PROVIDE ONE CONDUIT AND PULL WIRE AS REQUIRED FOR NEW DATA LINE FOR EACH PIECE OF NEW EQUIPMENT AS FOLLOWS: (1) HP PRINTER (24" WIDE FORMAT PRINTER), (1) HP COLOR PRINTER AND (1) CONDUIT AND PULL WIRE FOR (1 OR 2) DL PRINTER(S) AS SHOWN ON DRAWINGS.SEAFOOD FREEZERVERTICAL RACEWAYS FROM ALARM BOXES SHALL BE EITHER CONCEALED INSIDE WALL OR SURFACE MOUNTED (TO MATCH JUNCTION BOX MOUNTING). ALL VERTICAL RUNS SHALL BE TURNED 90-DEGREES AT TOP SIDE OF BOTTOM CHORD OF BAR JOIST AND EXTENDED HORIZONTALLY TO A LOCATION ACCESSIBLE BY VERTICAL FLOOR TYPE LIFT.SEASONAL SHOPNETWORKTVETRNETWORKTVETRNETWORKTVETRNETWORKTVETRNETWORKTVETRNETWORKTVETRSEAFOOD COOLERPRODUCE PREPSEAFOOD PREP5.6.UPON COMPLETION OF ELECTRICAL INSTALLATION AND PRIOR TO ENERGIZING CIRCUIT:A.B.C.INSPECT WIRE AND CABLE FOR PHYSICAL DAMAGE.PERFORM CONTINUITY TEST.VERIFY PROPER PHASING CONNECTION TO ALL THREE PHASE MOTOR LOADS.REPLACE ANY BROKEN ELECTRICAL DEVICES ANDCOVERS IN STORE.S:\Wal-Mart\W447\D\W447E2 3 Aug 2011 - 4:16 pmGARDEN CENTERE2.4EXISTINGETHERNETSWITCHPHARMACYREPLACE BROKEN COVERS AND RECEPTACLES. NEW COVERS, CONNECTIONS, AND EXPOSED CONDUIT SHALL BE WEATHERPROOF. NEW RECEPTACLES SHALL BE WEATHERPROOF, GFI WITH WHILE-IN- USE COVER. TYP OF ALL GARDEN CENTER DEVICES.EXISTINGETHERNETSWITCHE2.3LPTVETRRELOCATEDTENANTSIGNAGE16.23416.470L3FELECTRICAL ROOM #3CART STORAGE-{GM}OTHER INCOME-GMLPTVETRVESTIBULE-{GM}4E2VISION CENTERLPTVETRCOURTESY DESKCOUNTCASHE2.3CORRIDORJANITORMENWOMENE2.3PICTURE MEREGAL NAILSSMART STYLE%POWER PLAN1" = 20'-0"4E2.3 NETWORK TVETRBANKWIRELESSSTORELPTVETRCARTSTORAGEVESTIBULE-{GR }SUBWAYCAKE DECORATINGR16.470L2DE2ELECTRICAL ROOM #2OTHER INCOME-GRRELOCATEDTENANTSIGNAGE16.234E2.3BAKERYPRODUCE COOLERGE2BAKERY COOLERBAKERY FREEZERPLUMBING/MECHANICALB7.CONTRACTOR SHALL MAKE FINAL CONNECTION FROMEXISTING SIGN JUNCTION BOXES TO NEWILLUMINATED STORE SIGN. WHERE NEW ELECTRICALCONNECTIONS FOR SIGNAGE OCCUR ABOVE ROOFLINE, PROVIDE UNISTRUT TO MOUNT JUNCTION BOXESTO BACK SIDE OF PARAPET AND PROVIDE ONLY ONEPENETRATION THROUGH THE ROOF. REFARCHITECTURAL EXTERIOR WALL SECTIONS ANDWHIP DETAIL FOR ROOF AND PARAPET PENETRATIONREQUIREMENTS. VOLTAGE SHOULD BE NOMINAL 120V+/-5% AND NOT FLUCTUATE MORE THAN +/-5%(114V-126V) OVER TIME. READINGS SHOULD BE TAKENAT THE JUNCTION BOXES CLOSEST TO THE SIGNLETTERS. ALSO VERIFY THE VOLTAGE AT THEPANELBOARD FEEDING THESE CIRCUITS MEETS THESAME CRITERIA. IF THE EXISTING CIRCUITS DO NOTMEET THESE REQUIREMENTS, NOTIFY THE WAL-MARTCONSTRUCTION MANAGER FOR FURTHER DIRECTION.WHEN ELECTRICAL CONNECTIONS ARE BELOW ROOFLINE, COORDINATE LOCATION OF ACCESS DOORSWITH WAL-MART CONSTRUCTION MANAGER ANDEXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS.EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGHKNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIRRELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THISKNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OFPERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATIONSHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUETO FAILURE TO FAMILIARIZE WORKERS WITH THISKNOWLEDGE.SHEET:POWERPLANE2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!