29.11.2012 Views

Annual Report 2006 - Euromaint

Annual Report 2006 - Euromaint

Annual Report 2006 - Euromaint

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EuroMaint Rail<br />

During <strong>2006</strong>, EuroMaint Rail has won several major,<br />

strategically important tenders in increasingly tough<br />

international competition. To these successes we can<br />

also add the beginning of an international establishment.<br />

The past year has been tremendous in many ways.<br />

With a successful year behind us we are optimistic about the future.<br />

EuroMaint Rail is well prepared to compete for major new contracts<br />

and to expand internationally. On a day-to-day basis we are continuing<br />

our goal-oriented efforts to become even more efficient and productive.<br />

Continued confidence from SJ aB<br />

Over the next few years a number of contracts will expire. The best<br />

way of winning them again is to keep our promises, build trust and<br />

adapt our customer propositions. Examples where we have succeeded<br />

in accomplishing this include the extended, directly negotiated threeyear<br />

maintenance contracts with Swedish train operator SJ AB for<br />

passenger carriages and RC engines.<br />

Winning team for Stockholm commuter trains<br />

It was excellent for EuroMaint Rail to be announced one of the<br />

winners in Stockholm Transport´s tender for the Stockholm commuter<br />

rail service. The team spirit and partnership in the Stockholm Train<br />

Alliance, in which EuroMaint Rail is a part, was a joy – together we<br />

offered a winning quality concept. This maintenance contract has also<br />

brought us around a hundred new co-workers, with whom we share<br />

our faith in the future.<br />

Maintenance contract with<br />

arriva for Pågatågen commuter trains<br />

British company Arriva – one of Europe’s largest companies in<br />

passenger commuter service – was the operator chosen by Swedish<br />

train operator Skånetrafiken to run Pågatågen commuter trains. In<br />

turn, Arriva chose to collaborate with EuroMaint Rail. The maintenance<br />

contract, a nine-year availability contract, was drawn up in close<br />

co-operation with the customer.<br />

MaJOR CONTRaCTS IN <strong>2006</strong><br />

• arriva – Maintenance of commuter trains Pågatågen (X11 electric engine coaches)<br />

• aSJ – Refurbishment of sleeper carriages, maintenance of passenger carriages<br />

• a-Train – Maintenance and refurbishment of Arlanda Express trains (X3)<br />

• veolia – Maintenance of engine coaches (X52), passenger carriages and engines<br />

• Green Cargo – Maintenance of electric and diesel engines,<br />

maintenance and refurbishment of freight wagons<br />

• NSB – Refurbishment of passenger carriages<br />

• SJ aB – Maintenance and refurbishment of X 2000 trains (X2), maintenance of<br />

RC engines, passenger carriages, electric engine coaches (X11–X14, X32 and X50)<br />

and diesel engine coaches (Y1 and Y2)<br />

• Stockholm Transport – Maintenance of commuter trains (electric engine coaches<br />

X1, X10 and X60)<br />

• TKaB – Maintenance of electric engine coaches (X50, X51 and X52)<br />

10<br />

JONaS SaMuELSON, PRESIDENT OF EuROMaINT RaIL<br />

Refurbishment for NSB – an international breakthrough<br />

EuroMaint Rail was entrusted by NSB, Norwegian State Railways,<br />

to refurbish 5 passenger carriages – an important international<br />

breakthrough. The contract entails a complete refurbishment from<br />

technical design to delivery.<br />

Baltic establishment an assertive move<br />

The new EU Members will be making substantial investments in<br />

railways. EuroMaint Rail’s new workshop for reprocessing replacement<br />

items in the Baltic region is an assertive move to ensure greater<br />

efficiency and a presence on an expansive new market.<br />

TuRNOvER By PRODuCT aREa<br />

1. Train maintenance 84%<br />

2. Refurbishment 11%<br />

2<br />

3<br />

4<br />

1<br />

3. Spare parts supply 4%<br />

4. Other 1%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!