12.07.2015 Views

2. The General Bid format and Price Bid format submitted ... - Tender

2. The General Bid format and Price Bid format submitted ... - Tender

2. The General Bid format and Price Bid format submitted ... - Tender

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

( 10 )required under the system. If they refuse to put their signatures, the trucks shallbe returned empty at the risk <strong>and</strong> responsibility of the purchaser <strong>and</strong> nodamage, whatsoever, shall be payable by IDCOL management to any affectedperson.33. A loaded truck shall not be allowed to go out of the mine unless the driver signsin the required documents of the mine at appropriate places. In case a driverrefuses to sign, he shall be directed to unload the iron ore in the stack <strong>and</strong> thenbe allowed to go out of mine. <strong>The</strong> management shall not be responsible for anyloss or damage suffered by the drivers or truck owners or the purchaser onaccount of aforesaid decision of the management.34. <strong>The</strong> truck drivers shall be supplied with a computer printed sheet dulyauthenticated containing the record of weighment of their empty <strong>and</strong> loadedtrucks every time they come in <strong>and</strong> go out of the mine with the loaded truck.35. <strong>The</strong> driver shall also be issued a challan in proper <strong>format</strong> containing the evidenceof loading <strong>and</strong> transportation out of the iron ore in question. <strong>The</strong> challans,prepared in required number of copies, must mention, among other, itsdestination <strong>and</strong> route to be taken <strong>and</strong> must be authenticated at each stage ofoperations. <strong>The</strong> contents of challan shall not contradict those in the TransitPermit <strong>and</strong> Transit Pass referred above. challans shall also be signed by theconcerned drivers. All the entries in the challan shall be clear, transparent <strong>and</strong> beauthenticated. <strong>The</strong>re shall be no confusion or ambiguity about the purpose ofwriting various entries in the challan <strong>and</strong> in underst<strong>and</strong>ing them.36. <strong>The</strong> truck drivers shall obey the instructions of the Mines Manager or hisauthorized representative with regard to falling of trucks in line for weighment<strong>and</strong> their movements inside the mine.37. <strong>The</strong> trucks shall not remain inside the mine a minute more than considerednecessary. After loading the iron ore, they shall immediately fall in line for grossweighment at the weigh bridge <strong>and</strong> go out after the weighment. <strong>The</strong>y must takethe route mentioned in their challan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!