Q150T S/E/ES Sample Preparation System Instruction Manual
Q150T S/E/ES Sample Preparation System Instruction Manual
Q150T S/E/ES Sample Preparation System Instruction Manual
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Name Default<br />
<strong>Q150T</strong> <strong>Sample</strong> <strong>Preparation</strong> <strong>System</strong><br />
Table 25 Metal Evaporation profile parameters<br />
Value<br />
Minimum<br />
Value<br />
Maximum<br />
Value<br />
Comment<br />
Material Carbon Material to be evaporated in this<br />
process<br />
Evaporation<br />
Current (A)<br />
Evaporation time<br />
(Minutes)<br />
Out Gas Time<br />
(Seconds)<br />
Out Gas Current<br />
(A)<br />
Max Out Gas<br />
Current<br />
(A)<br />
Max Out Gas<br />
Voltage<br />
(V)<br />
0 0 50 Current applied during the<br />
evaporation pulse<br />
1 0.1 4 Duration of evaporation pulse<br />
10 2 60 Time source is outgassed<br />
before evaporation pulse.<br />
20 0 40 Current applied tosource at the<br />
start of outgas step.<br />
Thus allowing automated out<br />
outgassing.<br />
Note the current during the out<br />
gas may be adjusted.<br />
40 0 50 Maximum current that can be<br />
set during outgas<br />
10 0 20 The voltage across the rod is<br />
limited to this value during<br />
Outgas<br />
Outgas source Yes No Yes Include or exclude outgassing<br />
step<br />
Tooling Factor 5 0.1 10 Tooling factor for this process<br />
Pump hold No No Yes If Yes, <strong>Q150T</strong> pumps down to<br />
outgas-ready state and waits for<br />
user input.<br />
Note: If hold time (set in<br />
<strong>System</strong> | Vacuum | Pump hold<br />
time – see page 41) is<br />
exceeded, <strong>Q150T</strong> vents<br />
chamber.<br />
Flush chamber No No Yes Set to Yes to flush chamber<br />
with nitrogen before pumping<br />
down.<br />
<strong>Q150T</strong> - <strong>Instruction</strong> <strong>Manual</strong> 75 10473 - Issue 3