12.07.2015 Views

Volume 3 nr 1 / 2011 - Academia Oamenilor de Stiinta din Romania

Volume 3 nr 1 / 2011 - Academia Oamenilor de Stiinta din Romania

Volume 3 nr 1 / 2011 - Academia Oamenilor de Stiinta din Romania

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

82 Lorand Catalin StoenescuScenario IIFig. 6. Scenario 1 – Discharge hydrograph.The second scenario is graphically presented in fig. 7 and 8. The resultedhydrographs are presented in fig. 9. This scenario is also structured in 4 stages:STAGE 1: In a first stage there is a breaking in the bottom outflow pipe insi<strong>de</strong>plot 19 and the filling material in between the plots is washed away. Themaximum discharge has a small value still, and is estimated at around 100 m 3 /s.STAGE 2: In the second stage, plot 19, with a height of 80 m starts sli<strong>din</strong>g and thewater begins to leak through the bin<strong>din</strong>gs with plots 18 and 20. At the end of thisstage, plot 19 sli<strong>de</strong>s completely and collapses. The opening measures approx. 15 min width, and the water discharge reaches a value of 12000 m 3 /s (fig. 9).Fig. 7. Scenario 2 – Stage 1 and 2.Copyright © Editura Aca<strong>de</strong>miei <strong>Oamenilor</strong> <strong>de</strong> Știință <strong>din</strong> România, <strong>2011</strong>Watermark Protected

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!