12.07.2015 Views

Here - Meta Marketing e Eventos

Here - Meta Marketing e Eventos

Here - Meta Marketing e Eventos

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

22 nd Salt Water Intrusion Meeting: Salt Water Intrusion in Aquifers: Challenges and Perspectivesyhigher than the average high tide sea level) was the preferred option due to its effectivenessand technical simplicity. This was however not possible because Solleveld is a protectednature conservation area. An equally effective (but technically more demanding) solution wasthe construction of interception wells on top of the new dune ridge (28 in total). Figure4a(right) and b show model results regarding the effectiveness of this measure.Figure 4a: result of 2D-model on the left: salinization of abstraction well (circle) if no measure is taken, on theright: interception well prevents salinization of wells. Figure 4b: Streamlines visualize salt water intrusion andthe effectiveness of the interception wells (shown as dots near the sea). (Source: Artesia, 2011)An important uncertainty is the size and location of the Sand Engine in time, since it is built toerode and deposit along the coast. Morphological models have been made on the behaviourof the Sand Engine, but recent data (2012) already show a different behaviour than predicted.Therefore, operation of the interception system must be flexible enabling mitigation ofnegative effects of the coastal defence projects now and under future coastal dynamics. Theaccompanying (dynamic) monitoring plan plays an important role regarding this (Buma etal., 2012). It focuses on the effectiveness of the interception wells, but also on effects causedby unexpected behaviour of the system. Together, the interception system and monitoring planare expected to guarantee further sustainable use of the dunes of Solleveld for drinking waterproduction, as it was for over a hundred years before.REFERENCESArtesia Water (2011). Resultaten instationaire modelberekeningen beheersmaatregel. Artesia WaterB.V. (In Dutch only)Buma J.T., Hoogmoed M., Sissingh-Meijer G. (2012). Monitoringplan grondwater Solleveld enfunctioneren beheersmaatregel. Deltares. (In Dutch only)DHV and Artesia (2010). Beheersmaatregelen Delflandse Kust/Zandmotor/Dunea. DHV AC8545. (InDutch only)Hoogmoed M. (2011). Effectanalyse van Zandmotor en Kustversterking op duingebied Solleveld –managementsamenvatting. Dunea. (In Dutch only)131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!