12.07.2015 Views

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ringeda1svatn occurred within 2 seconds after the blast, whereas themax imum surge at Crater Lake wi 11 occur about 14 seconds after the blast.The total design force on the 6 ft x 8 ft gate was thus found to be 882,0001 b.The hydraulic analysis for the lake tap blast was sent to WES for theirreview. Their response confirms the foregoing hydraulic analysis andappears as exhibit 5.F. Final Lake Tap Location: The location of the lake tap as shown onPlates 1 and 9 is approximate. The ultimate location will be made duringthe final phase of construction. Probes will be drilled out ahead of thework crews to determine which path will give the soundest rock and also todetermine the exact position of the lake bottom.81-48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!