12.07.2015 Views

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The power tunne 1 entrance wi 11 be located at the 1 ake tap. The 1 aketap scheme and general design has been recommended by Polarconsult Inc.,'and is intended to trap the majority of rock from the blast in the adjacentrock trap.The penstock vertical alinement was to a large extent determined by theminimum pressure gradient between the surge tank and unit. A minimumvertical distance of 25 ft was maintained between the top of the penstockand the minimum pressure gradient.B. Gate Structure. Gate structure hydraulic design for the alternateplan is essentially the same as for the selected plan. See section 8 ofthe main report.C. Rock Traps.' Rock trap hydraulic designs for the alternate plan areessentially the same as for the selected plan. See sections 7 and 9 of themain report, and sections 1.02 and 1.05 of Hydraulc Appendix Bl.D. Trashracks. Trashrack hydraulic designs for the alternate plan areessentially the same as for the selected plan. See sections 7 and 9 of therna -j n report.B3-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!