12.07.2015 Views

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

1 - Alaska Energy Data Inventory

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.01 GENERALThis section describes the hydraulic design of the power tunnel, surgetank, and penstock for Alternate Plan III of the Crater Lake phase of theSnettisham power facilities. This alternate is unique for the Corps ofEngineers in that it includes an unvented surge tank which will be referredto as an air chamber surge tank. The air chamber design requiresconsideration of the plant operating conditions, expected turbinecharacteristics and the total head losses in the conduit system from thereservoi r to the powerhouse. The power condu it wi 11 be connected to aturbine-generator unit which is to be installed in the eXisting powerhousewhich was built for the Long Lake phase of the Snettisham project.84-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!