12.07.2015 Views

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FIGURE 6: LAYOUT OF THE PROPOSED SLOT-SLOPE <strong>WEC</strong>S IN RELATION TO EXISTING AND PLANNED DEVELOPMENTS FOR ALTERNATIVES 3No-go AlternativeThe No-go alternative, whereby <strong>Abagold</strong> would continue to utilize electricity supplied by Eskom, wasalso considered in the assessment.3. ACTIVITY POSITIONIndicate the position of the activity using the latitude and longitude of the centre point of the site foreach alternative site.Latitude (S):Longitude (E):Co-ordinate of central position at theproposed site (Alternative 1, 2 and 3)34 o 26.167‘ 19 o 13.402‘29