12.07.2015 Views

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11(c)Emissions into the atmosphereWill the activity release emissions into the atmosphere? YES NO11(d)Generation of noiseWill the activity generate noise?YESNOIf yes, is it controlled by any legislation of any sphere of government? YES NOIf yes, the applicant should consult with the competent authority to determinewhether it is necessary to change to an application for scoping and EIA.If no, describe the noise in terms of type and level:Noise during the construction phase will comprise that generated by rock breaking or blasting, drilling ofthe seabed, additional vehicular noise, and machinery operation (the crane)12. WATER USEPlease indicate the source(s) of water that will be used for the activity by ticking the appropriate box(es)MunicipalWater board Groundwater River, stream, damor lakeOtherThe activity will not usewaterIf water is to be extracted from groundwater, river, stream, dam, lake or any other natural feature,please indicatethe volume that will be extracted per month:0 litresDoes the activity require a water use permit from the Department of Water Affairs? YES NO36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!