12.07.2015 Views

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The potential impacts of new developments on existing abalone farming activities and the impacts ofthe proposed development on marine ecology were addressed in the draft <strong>BAR</strong> and marine specialistreport. I&APs were assured that these issues would be addressed in the report.With regard to the concern that the proposed development would negatively impact planneddevelopments at the site leased by Relmar: The proposed site is situated within a harbour / lightindustrial area. The rocky shore area is in a disturbed state and the adjacent coastal areas are developedand used for industrial purposes. The proposed development is not out of character with the surroundingland uses and should not detract from the overall aesthetics of the area.Responses to interested and affected parties after the Draft <strong>BAR</strong> being made available for comment:A total of three emails were received from stakeholders after the draft <strong>BAR</strong> was made available forcomment. These emails were sent by Aquafarm Developments (Pty) Ltd (neighbouring abalone farm,HIK Abalone (Pty) Ltd (neighbouring abalone farm) and Cape Nature. Both neighbouring abalone farmsexpressed concern regarding the level of consultation with neighbouring users during construction.Emails were sent in response to this concern. Aquafarm however highlighted a number of concernsregarding the detail provided in the draft <strong>BAR</strong>, the potential impacts to water quality and the adjacentfarms and impact resulting from changes in the nearshore wave and current regime. Given the numberof concerns raised it was felt that a meeting between <strong>Anchor</strong>, <strong>Abagold</strong> and Aquafarm would be the mosteffective means to arrive at acceptable solutions. As such a meeting was held in July. The minutes of themeeting can be found in Appendix E.The following amendments were proposed following the meeting:1. The activity details section would be revised such that greater and clearer detail regardingconstruction methods in provided in the <strong>BAR</strong>. Such detail would include the measures taken toensure that no casting of cement will be required in the marine environment.2. The site diagrams would be amended so to include the position of the Aquafarm pumphouseand intake sump.3. A second site visit would be conducted by Prof. Geoff Toms in consultation with Aquafarm toview the position of the infrastructure in the coastal zone relative to the proposed development.The assessment of the impacts of change wave energy and current patterns would be updatedtaking into consideration this infrastructure.4. Monthly construction plans to be made available to all neighbouring farms. Weekly blasting andcement casting plans to be made available in advance to all neighbouring farms. Dailynotification prior to any blasting or casting of cement (within plastic canvas sacks in the marineenvironment).5. ECO to conduct weekly inspections and be on site during all blasting and cement casting (withinplastic canvas sacks in the marine environment) activities.Emails indicating the amendments were sent to Aquafarm with the minutes of the meeting attached.(see Appendix E).50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!