Abagold WEC BAR - Anchor Environmental
Abagold WEC BAR - Anchor Environmental
Abagold WEC BAR - Anchor Environmental
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
to members of the local community.10. On completion of the project, the appointed contractor shall ensure that all structures,equipment, materials, waste, rubble, notice boards and temporary fences used duringconstruction are removed.Operation11. Kelp and fouling biota found within the <strong>WEC</strong> dams and pump assistance pond must be removedperiodically during the operational phase of the activity.12. The applicant must monitor fouling of all surfaces and machinery in the <strong>WEC</strong>s. No biocides are tobe used in the event of biofouling without the assessment of the impacts of such biocides.13. The applicant must ensure that the majority of the new temporary job opportunities are providedto members of the local community.Is an EMPr attached?The EMPr must be attached as Appendix F.YESNO76