12.07.2015 Views

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

some of the impacts were anticipated and much consideration was givento reducing or eliminating these impacts through the use of innovativeconstruction methods. These methods are described in detail above forAlternatives 1 and 2 and will be applied for Alternative 3. The impacts towater quality resulting from the construction and operation ofAlternative 3 are, like Alternatives 1 and 2 expected to be of lowsignificance prior to mitigation. However the positioning of the southernside wall of the <strong>WEC</strong> dam for Alternative 3 is directly in front of theAquafarm intake sump. This will impact the intake of water by Aquafarmsignificantly as the channel will be cut off by the wall.StatusExtentDurationIntensityProbability ofoccurrenceCumulative impactprior to mitigationSignificance prior tomitigationDegree to which impactcan be mitigatedProposed mitigationNegativeLocalLong termHighDefiniteHighHIGHLowAdditional management measures were requested by the neighbouringabalone farmers to reduce the potenmtial impacts of alterations towater quality. These recommendations and measures are detailed forAlternative 1 and 2 above and must be implemented for Alternative 3.The potential impacts to water quality after mitigation, like Alternative 1and 2 will be of very low significance for Alternative 3.No mitigation for the impaired water extraction capabilities by Aquafarmas a result of the construction of the southern side wall of the <strong>WEC</strong> damproposed in Alternative 3 has been identified.Probability ofoccurrence withmitigationCumulative impact withmitigationSignificance withmitigationDefiniteHighHIGHA.8. POTENTIAL IMPACTS TO NEIGHBOURING USERS: NOISE IMPACTS (Alternatives 1, 2 and 3)A certain amount of noise will be generated by blasting and drillingNature of impact activities during construction. This may present a nuisance to persons62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!