12.07.2015 Views

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

Abagold WEC BAR - Anchor Environmental

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. PHYSICAL SIZE OF THE ACTIVITYIndicate the physical size of the preferred activity/technology as well as alternativeactivities/technologies (footprints):Alternative:Size of the activity:Alternative A1 (preferred activity alternative) 20 900 m 2Alternative A2 (if any) 20 900 m 2Alternative A3 (if any) 35 000 m 25. SITE ACCESSDoes ready access to the site exist?YESNOThere are currently two access routes to the site. The one access route is a gravel roadleading through the <strong>Abagold</strong> farm down to the existing pump house. The second is a tarredand cement road to the north east of the <strong>Abagold</strong> farm leading to around the Harbour Rocksrestaurant. The rocky platform can be accessed by vehicles off this access road. Noadditional access routes will be constructed. Access roads are indicated on the site plan(Appendix A) and shown on site photographs (Appendix B).6. SITE OR ROUTE PLANSee Appendix A.7. SITE PHOTOGRAPHSSee Appendix B.8. FACILITY ILLUSTRATIONSee Appendix C.30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!