12.07.2015 Views

estate strategy 2007-2017 - Publication Scheme - University of Stirling

estate strategy 2007-2017 - Publication Scheme - University of Stirling

estate strategy 2007-2017 - Publication Scheme - University of Stirling

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ESTATE STRATEGY<strong>2007</strong>-<strong>2017</strong>


contentsContentsPart 0 – Executive Summary................................. 3Part 1 – Introduction and context......................... 71. Objectives and scope <strong>of</strong> the <strong>strategy</strong>2. The <strong>University</strong>’s planning horizon3. Key strategic priorities <strong>2007</strong> to 20114. Size and pr<strong>of</strong>ile <strong>of</strong> the <strong>University</strong>Part 2 – The Local/Public Policy Context.............. 135. <strong>Stirling</strong> 20206. Regional Economic Development Strategy7. <strong>Stirling</strong> <strong>University</strong> Innovation Park (SUIP)8. Planning and Environmental Framework8.1 Planning Framework8.2 Environmental FrameworkPart 3 – Where are we now: the existing <strong>estate</strong>.....219. Description <strong>of</strong> the <strong>estate</strong>9.1 Background9.2 Non-residential space on thestirling Campus9.3 Residential space in <strong>Stirling</strong>9.4 Highland and Western Isles campuses9.5 Off-campus Research Facilities9.6 Property Valuations9.7 Special Characteristics <strong>of</strong> the Estate10. Condition <strong>of</strong> the Estate, Compliance,Fitness for Purpose & Resilience11. Space Management11.1 Overall Management11.2 Management <strong>of</strong> Teaching Space11.3 Use <strong>of</strong> Space Management Groupmetrics12 Ecological Survey13. Performance AssessmentPart 4 – Development potential.......................... 3514. Campus Development Plan14.1 The Existing Campus – RevisedDevelopment Plan14.2 SUIP Master Plan14.3 Planning Issues15. Potential for CollaborationPart 5 – Estate priorities in the Context <strong>of</strong> thestrategic Plan....................................... 3916. Proposed solutions for those strategicpriorities with <strong>estate</strong> implications17. Summary <strong>of</strong> proposed <strong>strategy</strong> on studentaccommodationPart 6 – Financial Issues...................................... 4318. Investment in the <strong>estate</strong> – past and future18.1 Maintenance18.2 Capital Investment18.3 Financing proposals and viabilityassessmentPart 7 – Consultation......................................... 47Part 8 – Implementation and review process...... 49Appendices........................................................ 511. Historic development <strong>of</strong> the Airthrey<strong>estate</strong>2. Campus Habitat Map3. Estate Performance Metrics4. Residential Strategy for <strong>Stirling</strong>5. Revised Campus Development Plan6. Capital Development Programmeto 2016/177. Action Plan1


Part 0executive summary3


executive summaryPart 0Executive SummaryThis Estate Strategy (referred to as ‘the Strategy’in this summary) presents a long-term strategicplan for developing and managing the <strong>University</strong>’s<strong>estate</strong> in the optimum way to meet and contributeto its strategic priorities and to ensure fitness forpurpose and legislative compliance. Specifically,it identifies how the <strong>estate</strong> will support the<strong>University</strong>’s current strategic priorities, and providesa comprehensive, coherent and flexible plan forthe future and a framework for prioritisation,investment and day to day management <strong>of</strong> the<strong>estate</strong>.The structure <strong>of</strong> the Strategy follows thatpresented to <strong>University</strong> Court in June <strong>2007</strong>; italso takes cognisance <strong>of</strong> the guidance providedby the Scottish Funding Council in <strong>2007</strong> andother examples <strong>of</strong> best practice from within theeducation sector and elsewhere.The Strategy acts as an umbrella for several otherpieces <strong>of</strong> work and as a result there are a number<strong>of</strong> additional outputs including an EcologicalSurvey and Habitat Map <strong>of</strong> the <strong>Stirling</strong> Campus(see Section 12 and Appendix 2), a revisedDevelopment Plan (Section 14.1 and Appendix5), a revised <strong>strategy</strong> on student accommodation(Section 17 and Appendix 4) and a CapitalDevelopment Plan for the period until 2016/17(Section 18.3 and Appendix 6).The essence <strong>of</strong> the Strategy is threefold:££ It is driven by the need to support the<strong>University</strong>’s strategic priorities and inparticular, the <strong>estate</strong>s implications that thesemay generate£ £ The importance <strong>of</strong> stewardship <strong>of</strong> the<strong>estate</strong> and continued investment directedat improving the quality, functionality andsustainability <strong>of</strong> the buildings and wider<strong>estate</strong> while at the same time eroding themaintenance backlog£ £ Consolidation on campus within <strong>Stirling</strong>,particularly with reference to the provision <strong>of</strong>residential accommodation for studentsPart 1 provides an overview <strong>of</strong> the size and pr<strong>of</strong>ile<strong>of</strong> the <strong>University</strong>, identifies the nine strategicmessages that underpin the Strategy and describeshow the Strategy fits within the <strong>University</strong>’s overallplanning process.Part 2 sets the Strategy within the local andpublic policy context and considers the vision for21st Century <strong>Stirling</strong>, and the Regional EconomicDevelopment Strategy produced by the Forth ValleyEconomic Forum. It is clear that the <strong>University</strong>already plays a key role in many areas but thatthere are still areas where further joint workingand alignment could be beneficial. Part 2 alsodescribes the current planning system in Scotland,the changes that will result from the enactment<strong>of</strong> the Planning Act 2006 (Scotland) and identifiesthe policies in the current Local Plan that couldaffect the <strong>University</strong>. Finally, this section providesa summary <strong>of</strong> the environmental legislation thatapplies to the <strong>Stirling</strong> campus and an overview <strong>of</strong>the non-statutory designations which are in place.Part 3 provides a description <strong>of</strong> the existing <strong>estate</strong>in <strong>Stirling</strong> (on and <strong>of</strong>f campus), on the Highlandand Western Isles campuses and on the remotefish farms and research stations operated by theInstitute <strong>of</strong> Aquaculture. This section details landand building areas, use, tenure and valuations.It also highlights the key findings <strong>of</strong> the lastsurvey <strong>of</strong> condition and statutory complianceand, in particular, that the <strong>University</strong> wouldhave to invest £52 million to make the entire<strong>estate</strong> sound. The <strong>University</strong>’s property does notsuffer from major structural problems but thereis much refurbishment still to be undertaken asbuildings and the infrastructure serving themand the campus reach 35-40 years <strong>of</strong> age andthe funding <strong>of</strong> this work will present a significantchallenge. This section also describes the statutorydesignations which apply to the <strong>Stirling</strong> campus(Garden and Designed Landscape and part <strong>of</strong> anArea <strong>of</strong> Great Landscape Value area), presents thefindings <strong>of</strong> the Ecological Survey and considersspace management and performance metrics.4


execUtIVe sUMMARyPart 4 assesses the capacity <strong>of</strong> the stirling campusfor further development if this is required by thestrategic plan and considers particular planningissues that could apply, particularly further listingby Historic scotland. Appendix 5 provides arevised development plan which identifies buildingand landscape development opportunities andprovides the broadest picture <strong>of</strong> the developmentsthat the <strong>University</strong> would wish to make. this hasbeen discussed with the local authority planners.Finally, this section considers the potential forcollaboration with other FHe institutions.Part 5 revisits those <strong>of</strong> the <strong>University</strong>’s strategicpriorities that have <strong>estate</strong> implications andproposes solutions to meet these should theyarise. It also presents a summary <strong>of</strong> the proposed<strong>strategy</strong> on student accommodation which wouldinvolve disposal <strong>of</strong> an <strong>of</strong>f-campus residence andconsolidation and investment on campus.Part 6 focuses on financial matters and describespast investment in maintenance and capital worksand compares the levels <strong>of</strong> investment to thoseproposed in the sector. It also describes the processused to develop the extended capital DevelopmentPlan to 2016/17, the assessment <strong>of</strong> financialviability and funding proposals.Part 7 lists those organisations or groups whowere consulted in the process <strong>of</strong> developing the<strong>estate</strong> <strong>strategy</strong> and describes the formal approvalprocess.Part 8 describes how the <strong>estate</strong> <strong>strategy</strong> will bereviewed and refreshed in line with changes to the<strong>University</strong>’s strategic priorities.the appendices provide a description <strong>of</strong> the historicdevelopment <strong>of</strong> the Airthrey <strong>estate</strong> (1), a HabitatMap for the stirling campus (2), a list <strong>of</strong> thoseperformance metrics monitored in relation tothe <strong>estate</strong> (3), the proposed <strong>strategy</strong> on studentaccommodation (4), the revised Development Planfor the campus (5), the capital Development Planto 2016/17 (6) and an action plan (7).5


Part 1Introduction and context7


IntRoDUctIon AnD contextPart 1Introduction and context1. Objectives and scope <strong>of</strong> the <strong>strategy</strong>the purpose <strong>of</strong> this <strong>estate</strong> <strong>strategy</strong> is to providea long-term strategic plan for developing andmanaging the <strong>University</strong>’s <strong>estate</strong> in the optimumway to meet and contribute to its strategicpriorities and to ensure its fitness for purpose andlegislative compliance.Specifically, the <strong>University</strong>’s new Estate Strategymust:£ identify how the <strong>estate</strong> will support the<strong>University</strong>’s current strategic priorities£ provide a comprehensive, coherent andflexible plan for the future taking account<strong>of</strong> foreseeable needs and the likely need forchange and further development£ provide a framework for prioritisation, capitalinvestment and day to day management <strong>of</strong>the <strong>estate</strong>this is the <strong>University</strong>’s third <strong>estate</strong> <strong>strategy</strong>. thefirst covered the period 1996/97-2005/06 and thesecond 2001–2005.2. The <strong>University</strong>’s planning horizonthe primary document which establishes the<strong>University</strong>’s future direction and priorities is itsstrategic Plan overview. this was refreshed during<strong>2007</strong>, following an exercise the previous year tosharpen the <strong>University</strong>’s mission and articulatethe vision for the future in a clearer and moredistinctive way.the strategic Plan overview currently covers theperiod <strong>2007</strong> to 2011. It is revisited and rolledforward each year and is supported by an actionplan, which details the implementation plans fora number <strong>of</strong> key priorities. In addition, there are anumber <strong>of</strong> formally-approved <strong>strategy</strong> documentswhich detail core priorities (Learning and teaching,Research and Knowledge transfer etc.) and otherenabling strategies (Financial, Human Resourcesetc.) as follows:»»»»»»»Learning and teaching Quality enhancement<strong>strategy</strong> (June 2006) for the period 2006 to2009Research & Knowledge transfer <strong>strategy</strong> (June2006) for the period 2006 to 2010Internationalisation <strong>strategy</strong> (June 2005)Marketing <strong>strategy</strong> (June <strong>2007</strong>) for the period<strong>2007</strong> to 2010<strong>estate</strong> <strong>strategy</strong> (March 2008) for the period<strong>2007</strong> to <strong>2017</strong>Financial <strong>strategy</strong> (March 2006) to 2009/2010Human Resources objectives, <strong>strategy</strong> andAction Plan (December 2006) for the period2006 to 2008An Information <strong>strategy</strong> is to be presented toFinance and Infrastructure committee (FIc) and<strong>University</strong> court towards the end <strong>of</strong> 2008.the relationship between the <strong>strategy</strong> documentsis shown in Figure 1.8


introduction and contextStrategic PlanOverviewSupporting StrategiesLearning &Teaching StrategyResearch & KnowledgeTransfer StrategyInternationalisationStrategyMarketingStrategyEnabling StrategiesEstate Strategy Financial Strategy Human ResourcesStrategyInformation StrategyFigure 1: relationships in planning processThe new Estate Strategy spans ten financial years(<strong>2007</strong>/08 to 2016/17), the level <strong>of</strong> detail for thefirst five years being greater than the second five.This is a longer timeframe than any <strong>of</strong> the other<strong>strategy</strong> documents but this is justified by the factthat it needs to anticipate any <strong>estate</strong> needs whichmay arise from the key strategic priorities andpropose solutions which can, if appropriate, beimplemented to meet the required timescale.3. Key strategic priorities <strong>2007</strong> to 2011The <strong>University</strong>’s mission is to pursue world-classresearch and scholarship in order to inspire,challenge and support motivated individuals whowant to shape their world. In support <strong>of</strong> this aim,the <strong>University</strong>:»» conducts world-class research that makes apositive contribution to society, the economy,the environment and culture;»» promotes and enhances student learningthrough innovative teaching programmes witha clear focus on real world needs;»» benefits wider society through broad basedaccess to educational opportunity;»» provides an attractive, supportive and caringenvironment for students and staff; and»» ensures that the wider community and partnerorganisations can benefit from its expertise,services and facilities.The Strategic Plan Overview for <strong>2007</strong> to 2011identifies nine strategic messages and a number <strong>of</strong>specific actions as follows:9


introduction and contextTable 1: nine strategic messages and associated actionsStrategic MessageResearch and Knowledge TransferLearning and TeachingSportOrganisational DevelopmentFunding and FinanceInternationalisationMarketingEstate developmentsLeadership, management and humanresourcesKey ActionsStrengthening research performance (external grant andcontract awards, income and number <strong>of</strong> RPGs), remainingresearch-led, optimising RAE outcome, developing aEuropean Research and Enterprise StrategyReviewing the academic portfolio & degree framework,further developing the Lifelong Learning agenda,embedding employability practice, development <strong>of</strong>teaching staff, maximising student experience,contributing to the participation agendaAsserting position as Scotland’s <strong>University</strong> Centre forSporting Excellence and attracting further investmentEstablishing a School <strong>of</strong> Management; review <strong>of</strong> teaching,learning and assessment processes; business processreviews; reviewing Charter and Statutes in the light <strong>of</strong>deregulation <strong>of</strong> HE governance; reviewing and building onstrategic partnerships; refinement <strong>of</strong> structure <strong>of</strong> ServiceAreas; developing a new Information StrategySeeking additional income generation opportunities,encouraging philanthropic giving, moving to proposed level<strong>of</strong> transfer to reserve, maintaining financial stability andmaking provision for development and growthGrowing international business in terms <strong>of</strong> studentnumbers, research collaboration and partnerships and staffrecruitment; launching a new International Summer SchoolIncreasing pr<strong>of</strong>ile, reputation and influence, securingmarket share in terms <strong>of</strong> student numbers, encouraginginvestment, strengthening presence in the HighlandsDeveloping a new Estate Strategy including a way forwardin relation to student accommodation; rolling out <strong>of</strong> newCapital Plan and implementation <strong>of</strong> key strategic capitalprojects; enhancing sustainability practice and turning thisinto an institutional strength; and tackling the implications<strong>of</strong> the implementation <strong>of</strong> the Framework AgreementContinuing modernisation <strong>of</strong> HR policies and procedures,implementing action plans related to equality, furtherimplementation <strong>of</strong> outcomes <strong>of</strong> Framework AgreementThe new Estate Strategy has been developed around these strategic priorities and they are re-visited in Part 5,Section 16 <strong>of</strong> this document.10


introduction and context4. Size and pr<strong>of</strong>ile <strong>of</strong> the <strong>University</strong>The <strong>University</strong> has a student population <strong>of</strong> justunder 9500 <strong>of</strong> which 7330 are undergraduates(6270 full time, 1060 part-time) and 2110 arepostgraduates (900 full time, 1210 part-time).74% <strong>of</strong> students come from Scotland, 12% fromthe rest <strong>of</strong> the UK and 14% from Europe andfurther afield. It employs just over 1800 staff withthe majority <strong>of</strong> its support services being providedby in-house teams.The table and figure below show the studentheadcount for the period 2003/04 to <strong>2007</strong>/08and projections for the following two years. Theyindicate some growth in EU undergraduate numbersand project moderate growth in EU and overseasresearch postgraduate numbers in future years.Table 2: Student Headcount 2003/04 to 2009/10EUOSUG TPG RPGYear FT PT FT PT UG TPG RPG2003/04 5735 1045 350 735 330 150 275 952004/05 5750 720 365 685 340 145 350 1102005/06 6165 620 330 750 395 120 430 1202006/07 6510 890 485 990 385 365 855 130<strong>2007</strong>/08 6305 750 425 910 385 290 955 1302008/09 6320 750 425 910 395 290 955 1402009/10 6355 750 425 910 405 290 955 1501200010000OS-RPGOS-TPG8000OS-UG6000EU-RPG4000EU-TPG2000EU-UG02003/04 2004/05 2005/06 2006/07 <strong>2007</strong>/08 2008/09 2009/10Figure 2: Student headcount 2003/04 to 2009/1011


IntRoDUctIon AnD contextThe <strong>University</strong>’s academic strengths lie in five coreareas as follows:»»»»»Health and Well-beingIncluding cancer care, Dementia, nursing &Midwifery, Psychology & social WorkCulture and SocietyIncluding education, english studies, Film &Media studies, History, Languages, Philosophy,Politics, Religions, Applied social sciences,sociology, social Work, criminology andHousing PolicyEnvironmentIncluding Aquaculture & Biological andenvironmental sciencesEnterprise and the EconomyIncluding Accountancy, Business, computingscience & Mathematics, entrepreneurship,economics, Law, Management, Marketing,Publishing studies, Retail studies and tourismManagementSportsport & exercise science, sports studies &Physical educationthere are 8 key research themes – Aquaculture;Arts, Histories and culture; children and youngPeople; enterprise and the economy; environmentand People; People centred Healthcare; sport; andWork, Welfare and Wellbeing.As a research-led institution, stirling is committedto the quality <strong>of</strong> its teaching being directly linkedto its research strength.the <strong>University</strong> is recognised for the quality <strong>of</strong> itsteaching and the academic standard <strong>of</strong> its awards.Its student-centred approach is exemplified bya longstanding commitment to flexibility andchoice in relation to the courses and final degreetaken. the <strong>University</strong> is 5th in the UK for studentcompletion, is rated by the times Higher educationsupplement as being in the top 10 for studentexperience and achieves a very high level <strong>of</strong>employability (95.9% in employment 6 monthsafter graduation).the majority <strong>of</strong> the <strong>University</strong>’s facilities are locatedwithin the boundaries <strong>of</strong> the Airthrey <strong>estate</strong> whichcomprises the stirling campus. the campus isbordered by woodland to the north and east andincludes the Robert Adam-designed Airthrey castlewhich dates to the 18th century. the academicand residential buildings are arranged around acentral loch. the campus is an intrinsic part <strong>of</strong> the<strong>University</strong>’s brand and is regularly described as one<strong>of</strong> the most beautiful in the world. the stunningsetting is a significant attraction for students andparents, staff, those attending conferences andevents and for members <strong>of</strong> the local community.12


Part 2the Local/Public Policy context13


the local/public policy contextPart 2The Local/Public Policy Context<strong>Stirling</strong> CouncilRebecca MaxwellAssistant Chief ExecutiveThe Council Strategic Plan<strong>Stirling</strong> 2020Hugh LightbodyService Manager, Economic Strategy & IntelligenceDeborah MurrayService Manager, Tourism, Marketing & Rural DevelopmentNeil FergusonStrategic Development OfficerLocal EconomicDevelopment StrategyHousing Needs StudySEFV Ewan Mearns Forth Valley RegionalEconomic DevelopmentStrategyIn order to set the <strong>University</strong>’s Estate Strategywithin a local policy context discussions were heldwith the above representatives <strong>of</strong> <strong>Stirling</strong> Counciland Scottish Enterprise Forth Valley (SEFV).These discussions identified areas <strong>of</strong> overlap atboth a strategic and operational level. Whilethe <strong>University</strong> already participates in many areasothers were identified where further involvement,alignment and joint working could be beneficial.5. <strong>Stirling</strong> 2020<strong>Stirling</strong> – the 2020 vision was presented to theCommunity Conference in June <strong>2007</strong>. The keyelements <strong>of</strong> the vision for <strong>Stirling</strong> were identifiedas follows:»»Working together for a 21st century <strong>Stirling</strong>»» Making <strong>Stirling</strong> a location <strong>of</strong> choice – to live,study, work and visit with a vibrant economy, agrowing population (predicted to rise to 100,000by 2020), high quality infrastructure and publicrealm, joined up and citizen-focused services»» Delivering a measurable increase in the positivewell-being <strong>of</strong> citizens and communitiesThe vision <strong>of</strong> 21st century <strong>Stirling</strong> identified a range<strong>of</strong> attributes – those <strong>of</strong> particular interest to the<strong>University</strong> being:»»distinctive appeal as a location <strong>of</strong> choice»»»»»»high performing education and training at alllevelsmore and higher value jobsincreasing quality and quantity <strong>of</strong> tourismactivityThis document identifies the <strong>University</strong> asbeing world class and one <strong>of</strong> <strong>Stirling</strong>’s assets. Itspecifically notes its impressive completion rates.The following priority actions were identified –affordable housing, the need for a City TransportStrategy, Rural issues, Sustainable Development,Community Care and reducing inequalities inhealth, wealth and opportunity.The Community Plan (2005–2020) sets out a visionfor the <strong>Stirling</strong> area to 2020 and is predicated onthe same values.The current Council Corporate Plan covers theperiod from 2003 to 2008 and is set againsta backdrop <strong>of</strong> significant population growth.It identifies the following five top priorities forinvestment – schools (PPP), roads maintenance,City Transport Strategy, the Sports Village andCommunity ownership <strong>of</strong> housing.14


the local/public policy context6. Regional Economic DevelopmentStrategyThe three local authorities (<strong>Stirling</strong>, Falkirk andClackmannan) have their own Strategic Plans(Making <strong>Stirling</strong> Work, My Future’s in Falkirk andBuilding Clackmannanshire respectively) and alsoparticipate in the Local (Forth Valley) EconomicForum. The <strong>University</strong> is represented on the Forumby Pr<strong>of</strong>essor David Bell (Economics). Its role is toprovide strategic leadership and coordination inthe delivery <strong>of</strong> economic development activitiesacross Forth Valley. It is an integral component<strong>of</strong> the Community Planning framework and aimsto simplify and improve services to business andpeople and achieve collaborative advantage.The Forum has established effective partnershipsbetween the three Councils, Scottish EnterpriseForth Valley (SEFV), Business Gateway, the LochLomond and Trossachs National Park Authority,Careers Scotland and the Raploch UrbanRegeneration Company. Supported by SEFV,the Forum is responsible for the articulation <strong>of</strong>the Regional Economic Development Strategy.The regional <strong>strategy</strong> and local authority plansare based on the principles embodied in SmartSuccessful Scotland. The Regional EconomicDevelopment Strategy has recently been updatedto take account <strong>of</strong> changes in local, national andglobal economic circumstances, to ensure strongeralignment with recent policy developments andto reflect the experiences and lessons from theEconomic Forum’s work to date. The revised<strong>strategy</strong> for <strong>2007</strong> to 2012 identifies a vision forForth Valley <strong>of</strong> a ‘thriving, diverse and sustainableeconomy at the heart <strong>of</strong> Scotland’. The maincomponents <strong>of</strong> the vision are as follows:»» providing an attractive location where people,businesses and investors want to live, workand prosper»» to be an area recognised for its high quality<strong>of</strong> life, identity and growing importance toScotland’s economic development»» a diverse business base with an increasingrepresentation <strong>of</strong> high value, high growthbusinesses and industries»» excellent transport, logistics and digitalinfrastructure»» an increasingly skilled and productive workforcewhere more people are making a productivecontribution to the labour market»» sustainable economic growth which doesnot compromise the quality <strong>of</strong> the localenvironment and reduces its effects onclimate changeThe strategic goal within the vision is to stimulatea dynamic economy <strong>of</strong> importance to Scotland’soverall economic development. Three key enablingstrategies are identified as underpinning thisaspiration – increasing prosperity, sustainableproductivity and participation - and three strategicthemes – a growing and sustainable economy,a competitive and productive skills base andan attractive, efficient and connected businessenvironment. Activities supported includeencouraging excellence in academic research andcommercialisation, building on the <strong>University</strong>’scurrent strengths. The Forum has no executivepowers and can only implement the <strong>strategy</strong> byinfluencing economic development across thepublic sector. The <strong>University</strong> is identified as akey organisation.7. <strong>Stirling</strong> <strong>University</strong> Innovation Park (SUIP)SUIP was established in 1986 and is both a physicalentity within the boundaries <strong>of</strong> the <strong>University</strong>’scampus and a partnership between three keyorganisations – <strong>Stirling</strong> <strong>University</strong>, <strong>Stirling</strong> Counciland Scottish Enterprise Forth Valley.The aim <strong>of</strong> SUIP is to facilitate the conceptionand growth <strong>of</strong> businesses with a high knowledgecapital by providing high-quality accommodation,services and support. SUIP’s distinctive role withinScottish economic development is its focus ongrowing innovative businesses in specialisedmarket sectors, including Life Sciences, Sportsand sports-related technologies and Environmenttechnologies, sciences and heritage, through acollaborative approach. The key objectives are toprovide safe and supported incubator facilitiesfor small enterprises, facilitating the transfer <strong>of</strong>new and emerging technologies and expertiseto business needs and opportunities and seekingfunding for and delivering national enterpriseprogrammes which support the overall vision.The Park extends to 14 acres (5.6 ha) andcomprises a mixture <strong>of</strong> existing buildings anddevelopment sites owned by the <strong>University</strong>.15


the local/public policy contextThe buildings within the Park are currently fullyoccupied and work is underway to develop amaster plan that will provide a blueprint for furtherdevelopment over the next 5 to 10 years.8. Planning and Environmental Framework8.1 Planning FrameworkPlanning permission is required for almost anychange in use or development 1 and oncegranted will form an individual permission forthat development, containing enforceableconditions which limit the way buildings andland can be used.All planning decisions are made in the context<strong>of</strong> a policy framework. It is a legal requirementthat planning applications are made in accordancewith what is termed the ‘development plan’unless material considerations indicate otherwise.This means that developments, which are inaccordance with the development plan, carry astrong legal presumption that they will be grantedand those which do not, carry a strong legalpresumption that they will be refused. Materialconsiderations include non-statutory guidance andviews <strong>of</strong> certain important statutory consultees(wildlife bodies fall within this category). It cansometimes be the case that material considerationsare elevated above the development plan inimportance, although this is uncommon. The keylandscape and visual characteristics <strong>of</strong> the campuswould be important material considerations,including the effect <strong>of</strong> development on thedesignation as a Garden and Designed Landscape,the fact that the campus sits within an Area <strong>of</strong>Great Landscape Value and the effects on thesetting <strong>of</strong> Airthrey Castle, as a Category Blisted building.The development plan is made up <strong>of</strong> regionaland local policy documents and will includethe National Planning Framework 2 when it isapproved. It may be necessary for the <strong>University</strong>to respond to these policy documents as theyemerge to ensure that the policies support the<strong>University</strong> and its intended development as far aspossible and oppose proposals that could threatenthose interests.Planning policy and legislation are currently in atransitional phase due to the enactment <strong>of</strong> a newPlanning Act for Scotland.This section gives an overview <strong>of</strong> the existingarrangements at a national, regional and local leveland gives an indication <strong>of</strong> the impending changesthat will need to be taken into account in relationto the Estate Strategy.At a national level planning is governed by adocument called the National Planning Framework(NPF) the aim <strong>of</strong> which is to provide a spatial planfor Scotland. The NPF is shortly to be given anenhanced status under the new Planning Act andwill be given legislative force and become part<strong>of</strong> the ‘development plan’. The current NPF waspublished in April 2004 and is a non-statutorydocument which sets out national priorities fortransport, energy, infrastructure and the economyamong other things. This NPF is currently beingreviewed and as a result <strong>of</strong> the new PlanningAct will form the statutory framework for alldevelopment at a national level. All planningpolicies at regional and local level will have t<strong>of</strong>it with the aims <strong>of</strong> the new NPF which is due in2008. It will govern national planning policy upto 2030 and is set to be reviewed every 4 years.A draft <strong>of</strong> the second NPF will be issued for publicconsultation early in 2008. Scrutiny by Parliamentwill follow in the spring <strong>of</strong> 2008; and publication<strong>of</strong> the final version <strong>of</strong> NPF in the autumn <strong>of</strong> 2008.It is important that any future plans for campusdevelopment fit with the broader strategic aims<strong>of</strong> the NPF. The existing NPF states that ‘Scotland’suniversities, higher education institutions andfurther education colleges lie at the core <strong>of</strong> the<strong>strategy</strong> for developing the skills base necessaryto support a knowledge driven economy.’The purpose <strong>of</strong> the Structure Plan is to give a longterm planning <strong>strategy</strong> at a regional level. It setsout broad strategic aims for development andland use and is not intended to set out site specificproposals. Nevertheless they do form a very rigidpart <strong>of</strong> the planning process and all developmentproposals throughout the life <strong>of</strong> the Structure Planare assessed against its policies. For this reason it1General Permitted Development Order. This contains very limited categories <strong>of</strong> works which require no planning permission, e.g. sundry minor alterationsand certain changes <strong>of</strong> use.16


tHe LocAL/PUBLIc PoLIcy contextis important that the <strong>University</strong> engages fully inthe consultation process when a new structurePlan is being drafted or altered. A response to thecurrent draft structure Plan has been submittedby the <strong>University</strong> highlighting the importance<strong>of</strong> the <strong>University</strong>’s contribution to the area andrequesting amendments to reflect this. As wellas the specific issues addressed in the response,there are 2 further major policy proposals inthe structure Plan which may impact upon the<strong>University</strong> and which need to be monitored – theseare the proposed city expansion and the Weststirling Link Relief Road (see section 14.3, PlanningIssues). the structure Plan will now be consideredby the council, together with all the consultationcomments, before it is submitted to the scottishMinisters for approval.The document <strong>of</strong> significance at a local level isthe Local Plan, the current version <strong>of</strong> which is thestirling Local Plan 1999. It has undergone 2 minoralterations since that date, the second <strong>of</strong> whichis presently subject to a legal challenge whichhas delayed its <strong>of</strong>ficial adoption. <strong>Stirling</strong> Councilplanners have indicated that they do not intend toreview the Local Plan until the challenge has beenheard. this is not due until early 2008.The Local Plan deals with specific local proposalsand puts these within a policy framework againstwhich the local planning authority will assess them.Almost every chapter <strong>of</strong> the Local Plan impactsupon the <strong>University</strong> in some way whether by theworkings <strong>of</strong> a wide environmental policy to deliverconservation aims or the specific targeting <strong>of</strong>council support towards a future developmentproposal. Any proposal which does not accord withthe policies <strong>of</strong> the Local Plan is likely to be refused(or at the very least encounter strong resistancefrom the council). For this reason it is vitallyimportant that the <strong>University</strong> engages fully withthe consultation process for the new Local Plan.the policies in the current Local Plan which couldpotentially affect the <strong>University</strong> are as follows:Environment chapter: this contains variouspolicies against which all developments are judged.these include presumptions against developmentwithin the Green Belt, requirements to providesafe, secure environments, ensure disabled accessand protect trees and wildlife.17


the local/public policy contextBusiness & Economic Activity chapter: Policies<strong>of</strong> relevance include the requirement to ensure theenvironmental quality <strong>of</strong> all new developments.Community Leisure and Recreation chapter:This chapter places a duty on the <strong>University</strong> tosecure optimum use <strong>of</strong> recreational facilitiesoutwith semester times.Transport and Accessibility chapter: Policiesin this chapter which have a potential toaffect the <strong>University</strong> include the need fortransport assessments in connection with somedevelopments, provision <strong>of</strong> cycle facilities andwheelchair accessible environments.Bridge <strong>of</strong> Allan chapter: Contains the specificpolicies affecting the <strong>University</strong> including theCouncil’s policy to support ‘planned expansion’<strong>of</strong> the <strong>University</strong> and further development <strong>of</strong> theInnovation Park. In particular industrial expansion<strong>of</strong> the <strong>University</strong> campus is supported. Due to theage <strong>of</strong> the Local Plan it must be assumed that theexpansion referred to is what has already occurredand no further expansion will be supported otherthan that which is shown on the Proposals Map.The <strong>University</strong> will need to assess the EstateStrategy to ensure that it is in accordance withthe Local Plan.Under the new Planning Act 2006, both theStructure Plan and the Local Plan will be replacedby a single document – the Local DevelopmentPlan. There is a statutory requirement that thisbe replaced every 5 years. This should mean theplanning framework for the <strong>University</strong> becomesmore responsive and up to date but will requireregular input from Estates & Campus Services toensure that the Estate Strategy is taken account <strong>of</strong>as each draft plan emerges. The four city regions– Edinburgh, Glasgow, Aberdeen and Dundeewill be subject to a further plan, the StrategicDevelopment Plan.The programme for introducing these new Planshas not yet been determined. Under the newsystem, the primacy <strong>of</strong> the development plan willcontinue in all planning decision making. It is notyet known what level <strong>of</strong> influence the StrategicDevelopment Plan (SDP) will have, but tensionshave already arisen for those other cities, e.g.<strong>Stirling</strong>, and major regions, e.g. Fife, that will nothave an SDP.8.2 Environmental FrameworkThe campus provides habitats for a diverse range<strong>of</strong> flora and fauna. Statutory legal protection isprovided to a huge range <strong>of</strong> flora, fauna and theirhabitats and this could influence development onthe campus or any activity that could potentiallydisturb the habitats <strong>of</strong> protected species.Environmental Impact Assessments are usedto assess the effect <strong>of</strong> a particular project. Thisrequires the developer to assess and demonstratethat the residual effect <strong>of</strong> the development isacceptable following any mitigation measures thatmay be required.Qualifying flora, fauna and their habitats areprotected by criminal law and also receiveprotection under the planning system from theimpacts <strong>of</strong> adverse developments. The latter mayresult in development at an otherwise suitablelocation (in planning terms) being refused.Planning authorities have a general but notoverriding duty to have regard to biodiversity inmaking planning decisions.The <strong>University</strong>, in common with otherorganisations, is obliged to give properconsideration to, and account for, the impactswhich their activities and policies have on theoverall balance and health <strong>of</strong> the natural biologicalenvironment, at a local, regional, national andinternational level. This means acting in wayswhich are consistent with the exercise <strong>of</strong> otherstatutory functions, in order to ensure that theconservation <strong>of</strong> naturally occurring biologicaldiversity is encouraged and advanced. The ScottishBiodiversity Strategy is the key point <strong>of</strong> referencefor all public bodies.Prosecutions for wildlife crime carry high penaltiesand may result in serious reputational damage forthe individuals and organisations involved. Thecriminal law for wildlife crime has recently beenextended not just to those who actually undertakeillegal acts but also to those who do so as a result<strong>of</strong> some reckless act (as opposed to deliberately)and those who knowingly cause or permit such18


the local/public policy contextacts to take place. The <strong>University</strong> has obligationswhich it is required to comply with both in its roleas a major landowner and as a potential developer.As the duties and obligations may change oncethe presence <strong>of</strong> a particular species is known ora particular habitat is formally designated theavailability <strong>of</strong> continuously updated informationis vital.As a starting point an Ecological Baseline Surveywas undertaken in <strong>2007</strong> (see Section 12) to identifyany important habitats and plant species, as wellas recording signs <strong>of</strong> fauna and areas <strong>of</strong> habitatthat may be suitable for protected species. Keyfindings were that the campus supports a variety<strong>of</strong> habitats, the most ecologically sensitive <strong>of</strong> whichare within the semi-natural and mature plantationwoodlands and water bodies, and that Pipestrellebats have historically roosted within the campusbut that no signs <strong>of</strong> other protected species wereidentified. However, this information will need tobe regularly reviewed.The current planning system is undergoingchange with a greater emphasis being placedupon biodiversity. <strong>Stirling</strong> Council, as the localplanning authority, provide within their Local PlanEnvironmental Keynote Policies. Any planningapplication submitted to the local planningauthority will be assessed against such policies.Statutory protection for flora and fauna falls intotwo categories with the highest level <strong>of</strong> protectionbeing given to what are termed ‘European Species’and a lesser but still high level <strong>of</strong> protection beinggiven to ‘nationally protected species’ as follows.There are a number <strong>of</strong> species that are given ahigh level <strong>of</strong> protection under European legislation.Protection extends to species <strong>of</strong> plant and birdlife. It is an <strong>of</strong>fence to deliberately or recklesslycapture, kill, injure, harass a European ProtectedSpecies (EPS) or deliberately or recklessly damageor destroy its breeding or resting place. In order toavoid criminal prosecution that would otherwisearise from these acts a licence must be obtainedfrom the Scottish Government. There is a rigorousscrutiny <strong>of</strong> all licence applications and there is astatutory test which is particularly difficult to meet.A number <strong>of</strong> species are given a degree <strong>of</strong>protection nationally. Badgers receive specialprotection under the Protection <strong>of</strong> Badgers Act1992 with it being possible to obtain a licencefrom Scottish Natural Heritage to avoid criminalprosecution. Again, certain species <strong>of</strong> plantand bird life are also listed. It is an <strong>of</strong>fence tointentionally or recklessly kill, injure or take anywild animal or intentionally or recklessly damage,destroy, or obstruct access to, a structure or placewhich a wild animal uses for shelter or protectionor disturb such an animal while occupying thatplace or structure. Development affecting thesespecies would not normally require a licencehowever a developer would need to meet thestatutory tests.The campus does not currently have any statutorilydesignated habitats for wildlife such as Natura2000 Sites (Special Areas <strong>of</strong> Conservation andSpecial Protection Areas) and Sites <strong>of</strong> SpecialScientific Interest (SSSI) both <strong>of</strong> which again havea high level <strong>of</strong> protection. There are, however,two non-statutory Local Wildlife Sites (LWS) <strong>of</strong>nature conservation interest which are protectedunder the planning system – Hermitage Woodand Airthrey Loch. Such designations and theneed to protect the sites concerned from adversedevelopment would be a material consideration inany proposed development. There are also areas<strong>of</strong> non-statutory designated woodland within thecampus including areas <strong>of</strong> Ancient Woodland andLong Established Woodland <strong>of</strong> Plantation Origin.The campus is also <strong>of</strong> geological interest becauseit contains raised beach sand deposits (goodexamples can be found close to the PathfootBuilding at grid reference NS803968) indicatinghigher sea levels in the Forth Valley in the past.The campus is an important teaching resource,particularly for the School <strong>of</strong> Biological andEnvironmental Sciences.19


Part 3Where are we now: theexisting <strong>estate</strong>21


where are we now: the existing <strong>estate</strong>Part 3Where are we now: the existing <strong>estate</strong>9. Description <strong>of</strong> the Estate9.1 BackgroundThe <strong>University</strong> teaches in three locations – the <strong>Stirling</strong>Campus, the Highland Campus (the new Centre forHealth Sciences within the Raigmore Hospital sitein Inverness) and the Western Isles Campus (withinStornoway Hospital). The latter two locations are usedfor teaching Nursing and Midwifery. The Institute<strong>of</strong> Aquaculture operates a number <strong>of</strong> remotefish farms and research stations in Howietown,Buckieburn, Machrihanish and Dunblane. Table 3shows the area <strong>of</strong> land and gross internal buildingarea <strong>of</strong> each <strong>of</strong> the campuses/properties ownedor leased by or to the <strong>University</strong> and indicates thetenure arrangements.Table 3: Land and Gross Internal Areas <strong>of</strong> Buildings22LocationTenureLandArea haBuilding AreaGross Internal m 2Main <strong>Stirling</strong> <strong>University</strong> CampusOwned and Occupied by<strong>University</strong>Freehold 135.2 87,42041,303Non ResidentialResidentialNotesMedical centre Freehold 0.065 n/a Leased to Private Medical PracticeInnovation Park(excluding proposedextension)Freehold 5.6 n/a Leased to various commercialoccupiersFairview Freehold 0.5 n/a Leased to Scottish Institute <strong>of</strong>Sport<strong>Stirling</strong> Off CampusSt Annes Freehold 0.10 284 Leased to Bright BeginningsNurseryFriars Cr<strong>of</strong>t Freehold 0.20 450 ResidentialUnion Street,Freehold 0.02 94 ResidentialBridge <strong>of</strong> AllanAlangrange Freehold 0.65 1,335 ResidentialJohn Forty’s Court Freehold 1.46 6,586 ResidentialUnion Street, <strong>Stirling</strong> Leasehold N/a 4,276 ResidentialThistle Chambers Leasehold N/a 576 ResidentialLyon Crescent Leasehold N/a 4,366 ResidentialAquaculture Research Field StationsHowietoun Freehold 1.00 1022 Mixed residential / non residentialSauchiemill Freehold 9.20 483 Mixed residential / non residentialBuckieburn Freehold 0.15 330 Mixed residential / non residentialMachrihanishFreeholdLeaseholdHighlands and Western Isles CampusHighland Campus Centrefor Health SciencesWestern Isles Campus0.201.00986370Mixed residential / non residentialMixed residential / non residentialLease N/a 2,255 Non residential within Estate <strong>of</strong>Raigmore Hospital InvernessLicence tooccupyN/a 810 Non residential embedded withinStornoway HospitalThe following sites are within the boundary <strong>of</strong> the Historic Airthrey Estate but are no longerowned by the <strong>University</strong>.Falcon Foodservices 10.18 n/a FactoryWallace View site 2.82 n/a Owned by SEFV with option for<strong>University</strong> to develop


where are we now: the existing <strong>estate</strong>The majority <strong>of</strong> <strong>University</strong> facilities are located onthe <strong>Stirling</strong> Campus within the boundaries <strong>of</strong> theAirthrey Estate, which historically was recorded asextending to 146.9 ha (363 acres). This area hasrecently been checked using the digital OrdnanceSurvey Maps resulting in a measured area <strong>of</strong>approximately 153.9 ha (381 acres). An area <strong>of</strong>approx. 13 ha (32 acres) on the eastern boundary<strong>of</strong> the original <strong>estate</strong> is now privately owned. Thisarea is divided into two constituent parts:»» The Wallace View site <strong>of</strong> about 2.82 ha (6.95acres) owned by Scottish Enterprise Forth Valleybut with an option agreement in favour <strong>of</strong> the<strong>University</strong>»» Falcon Foodservices Factory site <strong>of</strong> about10.18 ha (25.15 acres), part <strong>of</strong> which ScottishEnterprise Forth Valley have an optionto purchaseWithin the remaining campus which is owned bythe <strong>University</strong> there are three areas which havebeen leased for non-<strong>University</strong> purposes:»» A small area <strong>of</strong> land to the north <strong>of</strong> about0.065 ha (0.16 acres) has been leased anddeveloped as a Medical Centre»» Land to the south <strong>of</strong> the campus, extendingto 5.6 ha (14 acres) has been leased anddeveloped by the <strong>University</strong> and partners asthe <strong>Stirling</strong> <strong>University</strong> Innovation Park (SUIP).Agreement has been reached with ScottishEnterprise Forth Valley to lease a further area<strong>of</strong> land (circa 1.84 ha) to a developer (to beappointed) to extend the Innovation Park»» Fairview – the building and its associated landextending to 0.5 ha (1.2 acres) has been leasedto the Scottish Institute <strong>of</strong> Sport for theirheadquartersThe following table sets out the areas <strong>of</strong> theremaining campus attributable to different uses.Table 4: Land Use Categories – <strong>Stirling</strong> CampusCategoryArea haRoads, Car parks 14.7Buildings including internal courtyards 7.1Playing Fields and Sports Grounds 13.1Golf Course 5.0Hermitage Woods (dedicated woodland) 25.2Other Grounds 60.45Airthrey Loch 9.65Total135.2 ha(334.1 acres)23


where are we now: the existing <strong>estate</strong>Table 5: Net space (useable areas) m 2Airthrey CastleCottrell BuildingInc R G Bomont and LogieLecture TheatreColin BellBuildingIris MurdochBuildingPathfootBuildingAndrew Miller Building,Central AreaLibrary & Studies AreaRobbins BuildingMaintenance AreasOther BuildingsTotalAcademic AreasCulture and Society 74 2649 20 2743Health andWell being 920 3701 1310 889 838 7658Enterprise Economyand Sport 4085 4085Environment 3744 3304 7048Centrally TimetabledTeaching space 3910 887 4797Library andInformation Services 1912 476 6244 8632Administration 97 3265 336 159 1674 164 5695Social Provision 910 4069 79 306 5364Indoor Sports 8682 8682Leased to Others 29 219 629 877Transition 162 834 545 1541Shops 1801 1801SUSA 36 1334 1370Management Centre 3698 3698Principal’s house(Airthrey Castle Yard) 295 295Totals 1244 21744 1310 889 9945 4228 6343 1334 1674 15575 642869.2 Non-Residential Space on the <strong>Stirling</strong>CampusThe total amount <strong>of</strong> non-residential, useable floorspace on the <strong>Stirling</strong> Campus is 64,286m 2 . Thisincludes academic, library, administrative, social,commercial and sports facilities.The Academic and Administration space is largelyhoused in the Pathfoot and Cottrell Buildings andAirthrey Castle.Pathfoot Building is predominantly a 1960ssteel framed single storey building with extensionsbuilt in the 1990s. Its occupants are the ArtsDepartments, Institute <strong>of</strong> Education, Institute <strong>of</strong>Aquaculture and the Student Recruitment andAdmissions section <strong>of</strong> administration. The buildinghouses a significant part <strong>of</strong> the <strong>University</strong>’s ArtCollection. It has its own restaurant and fullproduction kitchen and a number <strong>of</strong> centrallytimetabled teaching rooms and lecture theatres.24


where are we now: the existing <strong>estate</strong>Cottrell Building is predominantly a concreteframed 3 storey 1970s building with the Courtroom and R G Bomont extensions built in the early1990s. The exterior <strong>of</strong> the building is currentlybeing refurbished with new cladding, insulation anddouble glazing. Its occupants are SBES, Psychology,Nursing and Midwifery, Management and most<strong>of</strong> the Administrative departments including thePrincipal and the <strong>University</strong> Secretary. Much <strong>of</strong> the<strong>University</strong>’s centrally allocated teaching space islocated in the Cottrell building. It is linked to theAndrew Miller building by a footbridge crossing theroad. The <strong>University</strong>’s 24 hour main reception andsecurity control desk is located in Cottrell.Iris Murdoch Building was built in 2002 and isa steel framed building. The building was fundedby the Dementia Trust and houses the DementiaServices Development Centre and providesresearch and support to assist in the developmentand improvement <strong>of</strong> services for peoplewith dementia and their carers. The buildingincorporates a small finishing kitchen and anumber <strong>of</strong> high quality teaching and conferencerooms which are available for commercial use.Part <strong>of</strong> the Nursing and Midwifery Departmentis also located in the building.The Colin Bell Building was built in 2003 (fundedby SRIF) and is a masonry and timber framedbuilding linked to the R G Bomont building andimmediately adjacent to the Iris Murdoch Building.It houses the Department <strong>of</strong> Applied Social Science.Airthrey Castle is an 18th century Grade ‘B’ listedbuilding <strong>of</strong> Robert Adam design which has beensubject to significant alteration in the Victorian era.It is currently being altered to enable the School <strong>of</strong>Law to be accommodated there.The Library with associated study space is a selfcontainedconcrete framed building adjacent toand directly accessible from the Andrew MillerBuilding. It was built in the early 1970s and isin need <strong>of</strong> major refurbishment. A scheme toreconfigure and refurbish the building is currentlybeing developed.The Andrew Miller Building is the maincentre for social provision with three cateringoutlets including a full restaurant (Haldanes) andproduction kitchen. It also includes a large generalpurpose area called the Atrium which is usedfor student events, conferences and exhibitions.Retail outlets in the adjacent shopping mall areleased and include a Post Office, Pharmacy,Students Union Shop, Travel Agency, Bookshop,Supermarket and Bank. Also adjacent is theChaplaincy Centre and the Robbins Students’Association building with its bars and cateringoutlets and nightclub.The Macrobert Arts Centre (re-opened in 2002with the assistance <strong>of</strong> Arts Council and Lotteryfunding) is located adjacent to the Andrew MillerBuilding and comprises two theatre auditoria, afilm theatre, dance studio, crèche, <strong>of</strong>fices and acafé bar. It is widely used by staff, students andmembers <strong>of</strong> the community.The <strong>Stirling</strong> Management Centre is a brickbuilt/timber framed 1980s building and is a verysuccessful stand-alone conference centre. Itcomprises seminar rooms, bedrooms and diningfacilities. The Centre is currently being extended inorder that it can respond fully to market demand.The Gannochy Sports Centre provides the hubfor the <strong>University</strong>’s sports facilities which areextensively utilised by students, staff and the localcommunity. The centre includes the NationalSwimming Academy and the National TennisCentre (both <strong>of</strong> which were funded using variousexternal sources including Sports Lottery funding)and comprises a sports hall, indoor tennis courts,indoor 50m swimming pool, squash courts, fitnesscentre and sports pavilion. Adjacent to the Centreare sports pitches, a running track, tennis courtsand all weather pitches. There is also a 9-hole par3 golf course on land adjacent to Airthrey Castle,together with additional pitches and changingrooms. The loch is utilised for water sports and aboathouse and jetty are located on its west bank.9.3 Residential Space in <strong>Stirling</strong>Residential accommodation for students isprovided primarily on the <strong>Stirling</strong> Campus wherethe <strong>University</strong> has 1,965 places in purpose builtresidences. The <strong>University</strong> also owns or leasesa range <strong>of</strong> student residential accommodation<strong>of</strong>f campus within <strong>Stirling</strong> and Bridge <strong>of</strong> Allanand which provide a further 834 places. A highproportion <strong>of</strong> students are housed in <strong>University</strong>managedaccommodation (35% <strong>of</strong> the FTE total).25


where are we now: the existing <strong>estate</strong>Tables 6 and 7 below provide details <strong>of</strong> thecurrent stock <strong>of</strong> residential accommodation, thefloor-space, bed-spaces available and details <strong>of</strong>ownership.Table 6: Student residential accommodation in <strong>Stirling</strong>Residential BuildingsOn CampusA K Davidson HallAlexander CourtAlexander Court LaundryAndrew Stewart HallH H Donnelly HouseFraser <strong>of</strong> Allander HouseGeddes CourtMuirhead HouseMurray HallPendreich WayPolwarth HousePolwarth House LaundryPolwarth House LockupsSpittal HillSpittal Hill LaundryGross InternalArea m 2 Bed spaces Owner555851169056042792354741663001538181019664112717773027732202071241632091202795099001150<strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong>Off CampusAlangrangeFriars Cr<strong>of</strong>tFriars Cr<strong>of</strong>t GarageJohn Forty’s CourtLyon CrescentThistle ChambersUnion Street, Bridge <strong>of</strong> AllanUnion Street, <strong>Stirling</strong>40535 1965117642030658643665769442764411028718538326611524 834<strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong>Link HousingStandard Life<strong>University</strong>Link HousingTable 7: Staff residential accommodation in <strong>Stirling</strong>Residential BuildingsStaff Housing on CampusAirthrey Castle Yard No. 2136Airthrey Castle Yard No. 3136Airthrey Castle Yard No. 499Airthrey Castle Yard No. 599Airthrey Castle Yard No. 699Airthrey Castle Yard No. 799Ivy Cottage / Garden Cottage 2 100Gross InternalArea m 2 Bed spaces Owner5555550768 30<strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong><strong>University</strong>2Ivy Cottage and Garden Cottage are currently uninhabitable.26


where are we now: the existing <strong>estate</strong>9.4 Highland and Western Isles CampusesIn addition to the <strong>Stirling</strong> Campus on AirthreyEstate, the <strong>University</strong> has a lease to occupypart <strong>of</strong> the Centre for Health Sciencesbuilding completed in 2006 situated withinthe boundaries <strong>of</strong> the <strong>estate</strong> <strong>of</strong> the RaigmoreHospital NHS Trust in Inverness. The WesternIsles Campus consists <strong>of</strong> a number <strong>of</strong> roomsleased from and embedded in the 1990sStornoway Hospital NHS Trust Building. Nursingis taught in Stornoway and Nursing andMidwifery in Inverness.Some residential space for <strong>Stirling</strong> students isprovided directly by the hospital trusts in bothInverness and Stornoway.9.5 Off-Campus Research FacilitiesThe <strong>University</strong> owns and occupies several remoteresearch outposts operated by the Institute <strong>of</strong>Aquaculture comprising a Fish Farm and ResearchStation at Howietown, a Freshwater ResearchUnit at Buckieburn, a Marine Laboratory atMachrihanish and a reservoir at Dunblane. Theproperties are a mix <strong>of</strong> residential, academic andcommercial buildings <strong>of</strong> varying age and condition.The management <strong>of</strong> these facilities is overseenby the External Facilities Committee which reportsthrough the Finance and Infrastructure Committee(FIC) to <strong>University</strong> Court. The fish farming activities atthe Field Stations are operated on a commercial basis.Building areas and their uses are indicated in Table 8.Table 8: Research Field StationsHowietounMilnholm HouseCottageBothyOffices/Stores/LaboratoryGarage StoreHatcherySauchiemill Cottages (3No.)MuseumCold StoreOffice in PondBuckieburnHouseFilter StationOfficesMachrihanishHouseLaboratoryTank House/AquariumLife boat stationDunblane ReservoirGross InternalArea m 21491009017040543238185303010023012012875370633n/aBuilding UseResidentialResidentialResidentialOffice/ResearchStorageCommercialResidentialCommercialStorageCommercialResidentialAcademicResidentialResearchCommercialCommercialCommercial27


where are we now: the existing <strong>estate</strong>9.6 Property ValuationsThe <strong>University</strong>’s <strong>Stirling</strong> Campus comprises 135.2ha <strong>of</strong> ground, <strong>of</strong> which 34.85 ha consists <strong>of</strong>the loch and the dedicated woodland. Whilstthe <strong>University</strong> continues in existence there is norational need to dispose <strong>of</strong> the site. Firstly it wouldnot be a viable proposition to dispose <strong>of</strong> the sitefor a value sufficient to make relocation sensible ordesirable. And secondly, the campus is one <strong>of</strong> themost beautiful in Europe and is a significant part <strong>of</strong>the <strong>University</strong>’s brand and a significant attractionto students. The <strong>University</strong> buildings on campustotal 128,723m 2 gross internal area and the cost<strong>of</strong> rebuilding, with an allowance for a 20% spaceeconomy, would amount to circa £300m plus sitecosts. To recover this from the sale <strong>of</strong> the campussite would require a sale value in excess <strong>of</strong> £4mper useable hectare 3 . The planning authority andHistoric Scotland do not favour alternative uses <strong>of</strong>the campus, given its GDL and AGL designationsand its sympathetic development to date, and it istherefore not appropriate to consider relocation.The possibility <strong>of</strong> selling parts <strong>of</strong> the <strong>estate</strong> hasbeen considered in the past and a number <strong>of</strong> areaswith development potential have been disposed<strong>of</strong> or leased i.e. the Falcon Foodservices, ScottishEnterprise (Wallace View) and Innovation Parksites. The disposal <strong>of</strong> the Wallace View site and theland currently owned by Falcon Foodservices wasdriven by financial considerations and while theremay not have been an alternative at the time,the loss <strong>of</strong> this land within the original campusboundary has been much regretted. The <strong>University</strong>will continue to consider the disposal <strong>of</strong> particularbuildings and land if this is appropriate in terms <strong>of</strong>its Strategic Plan although these proposals will besubject to detailed scrutiny.In light <strong>of</strong> the above, the value to be attributedto the <strong>Stirling</strong> Campus properties is based onthe reinstatement costs required for insurancepurposes. This gives a value for the campus <strong>of</strong>£212m.In addition to the <strong>Stirling</strong> Campus site the<strong>University</strong> owns a variety <strong>of</strong> <strong>of</strong>f-campus studentresidential properties with an estimated insurancereplacement value <strong>of</strong> £10m, and the insurancereplacement value <strong>of</strong> the External Facilitiesresearch and fish farm sites is £3m.Approximate insurance replacement values for allsites are shown in Table 9 below.Table 9: Insurance Replacement ValuationsLocationTenureInsuranceReplacement ValueNotesMain Campus Freehold £212.0m Insurance valuationSt Annes Freehold £0.375m House capable <strong>of</strong> division into flatsJohn Forty’s Court Freehold £7.606m 41 flats in terraced blocksAlangrange Freehold £2.177m Large Victorian houseFriars Cr<strong>of</strong>t Freehold £0.549m Large two storey houseUnion Street, Bridge <strong>of</strong> Allan Freehold £0.115m 3 bedroom flat. Sale – benefactionconstraintsResearch Field Stations:Milnholm/Sauchiemill Freehold £1.870m Includes Fish Farm and ResidentialbuildingsMachrihanish Freehold £0.830m Planning restrictions on use <strong>of</strong> siteBuckieburn Freehold £0.315mDunblane Reservoir Freehold N/A3In this calculation the area <strong>of</strong> the campus is reduced by deducting the woodland areasHermitage +10 ha Loch and SUIP28


where are we now: the existing <strong>estate</strong>9.7 Special Characteristics <strong>of</strong> the EstateThe quality <strong>of</strong> its setting and campus landscape is<strong>of</strong> significant value to the <strong>University</strong> and an integralpart <strong>of</strong> its appeal to students, staff and visitors. Thecampus is subject to two designations - HistoricScotland and Scottish Natural Heritage confirmedthat the Airthrey Estate as a Garden and DesignedLandscape (GDL) in the Register <strong>of</strong> Historic Gardensand Designed Landscapes in Scotland and it is alsowithin an Area <strong>of</strong> Great Landscape Value. The GDLdesignation is based on the quality <strong>of</strong> the originalAirthrey Estate, which was designed in a classical18th Century parkland style, and also on the veryhigh quality <strong>of</strong> site planning and architectureachieved by the <strong>University</strong> buildings. In bothinstances the quality <strong>of</strong> landscape created is dueto a sympathetic relationship between buildings,landform, water and tree planting.The campus lies in a natural bowl, bordered byheavily wooded high ground to the north and east.The centre <strong>of</strong> the site is dominated by the manmadeAirthrey Loch, around which the majority<strong>of</strong> the <strong>University</strong> buildings are grouped. The Lochis designated as reservoir under the ReservoirsAct 1975 and is subject to regular inspection.With the exception <strong>of</strong> the historic Airthrey Castle,the first <strong>University</strong> building was completed in1967, with the majority being constructed in theearly 1970s. The comprehensive approach to the<strong>estate</strong>’s development was outlined in the 1968Development Plan, and has resulted in a coherentbuilding design and layout which, together withits impressive natural setting and subsequentdevelopments, creates a superb campusenvironment. Further information on the originalAirthrey Estate and its subsequent development asthe <strong>University</strong> campus is included at Appendix 1.10. Condition <strong>of</strong> the Estate, Compliance,Fitness for Purpose, and ResilienceThe <strong>University</strong>’s property does not suffer frommajor structural problems, the challenge for thefuture being continued refurbishment <strong>of</strong> theexisting <strong>estate</strong> and a limited amount <strong>of</strong> new buildwhere consistent with <strong>University</strong> <strong>strategy</strong>. Whilstmany areas have been refurbished in recent years,there is still much to be done to ensure a goodquality environment to match the Institution’sacademic reputation and future aspirations.External consultants Drake & Kannemeyer carriedout a survey <strong>of</strong> the <strong>University</strong> <strong>estate</strong> in 2006 toappraise its general condition and the extent <strong>of</strong>compliance with statutory requirements. Thepurpose <strong>of</strong> the survey was to provide the <strong>University</strong>with a comprehensive, reliable and independentaccount <strong>of</strong> their building stock and the extent towhich the physical <strong>estate</strong> complies with relevantlegislation. In addition an assessment <strong>of</strong> theadjustments required to satisfy the DisabilityDiscrimination Act (DDA) was carried out in parallelwith the other facets <strong>of</strong> the survey.The <strong>estate</strong> was graded for both condition andstatutory compliance using the RICS (RoyalInstitution <strong>of</strong> Chartered Surveyors) MaintenanceIndicators, as follows:Condition AssessmentCondition A - As newCondition B - Sound, operationally safe andexhibits minor deteriorationCondition C - Operational but major repair orreplacement needed soonCondition D - Inoperable or serious risk <strong>of</strong> failureor breakdownStatutory Non-compliance AssessmentCondition C - Reasonably foreseeable lack <strong>of</strong>compliance with legislationobserved by the surveyor oridentified by the responsibleauthority who have <strong>of</strong>fered a timespan for works to be carried outCondition D - Lack <strong>of</strong> compliance with legislationor imminently dangerous breachobserved by the surveyor oridentified by the responsibleauthority that may be likely toissue a warning or directiverequiring works to be carried outwithin a specified periodCondition DX - Lack <strong>of</strong> compliance with legislationor imminently dangerous breachobserved by the surveyor oridentified by the responsibleauthority who have issued awarning or directive requiringworks to be carried out within aspecified period29


the local/public policy contextThe final report produced by Drake andKannemeyer estimates the expenditure requiredto bring the Estate to a sound and operationallysafe condition (RICS Condition B) subject only toroutine maintenance. The report also estimatesthe expenditure required to comply with currentrelevant legislation including DDA.Table 10 below summarises the costs identifiedover a 10 year period:Table 10: Summary <strong>of</strong> costs from most recent survey <strong>of</strong> Condition and ComplianceNon ResidentialLegislative£000’sNon ResidentialCondition£000’sResidentialLegislative£000’sResidentialCondition£000’sYear 1 3235.1 1527.7 934.5 899.6Year 2 1209.8 2860.3 1496.7 5920.9Year 3 230.1 4587.1 58.2 2745.3Year 4 96.9 1857.3 22.0 597.1Year 5 99.5 9461.1 0 1262.8Year 6 96.9 1438.6 0 71.1Year 7 19.4 3394.1 0 894.4Year 8 1.3 5862.8 0 396.8Year 9 0 399.4 0 597.1Year 10 2.6 378.7 0 3.9Sub – Totals 4991.6 31767.1 2511.4 13389.0Totals (Non Res / Res) 36758.7 15900.4Overall Total 52659.1The estimated cost <strong>of</strong> bringing the entire <strong>estate</strong>to an acceptable condition (RICS Condition B)amounts to £52.7m over the ten year period.Other key findings <strong>of</strong> the report are as follows:»» £45.2m is required to restore the building stockto a sound condition»» £2.6m <strong>of</strong> the £45.2m is required to deal withthe elements <strong>of</strong> buildings assessed as being inCondition D»» £7.5m is required to deal with statutorycompliance issues»» Of the total costs identified, 94% are associatedwith Grade B and C stock and 6% with GradeD or DXThe <strong>University</strong> aims to make as much <strong>of</strong> its <strong>estate</strong>accessible as possible, although the nature <strong>of</strong> thecampus means this is a significant challenge. Workhas been concentrated on access to and within themost heavily used areas <strong>of</strong> administrative/teachingbuildings. The <strong>University</strong> has the reputation <strong>of</strong>being a good place <strong>of</strong> learning for studentswith disabilities and has over the years enrolledindividuals with severe disabilities and specificrequirements. The residential accommodationincludes a number <strong>of</strong> extensively adapted flatsfor students and their carers. The costs identifiedby Drake and Kannemeyer for further work onaccessibility, which forms part <strong>of</strong> the overalllegislative cost identified above, was £1.7m.30


where are we now: the existing <strong>estate</strong>Drake and Kannemeyer also undertook anassessment <strong>of</strong> the overall condition <strong>of</strong> the entire<strong>estate</strong> as a whole by dividing the appraisal cost foreach building by the indicative replacement valueto establish a replacement factor which was thenapplied using the following criteria:Replacement Factor (per building) =(Condition + Statutory Non-compliance cost)Indicative Replacement ValueOverall Grade = If Replacement Factor < 5% andbuilding < 5yrs old= AIf Replacement Factor < 30% = BIf Replacement Factor < 50% = CIf Replacement Factor > 50% = DThe significance <strong>of</strong> this is that the economic sense<strong>of</strong> investment is highest for buildings where thecalculation results in an overall Grade A and lowestfor Grade D. In fact, alternative solutions includingdisposal or demolition may be more appropriate forGrade D buildings. The floor areas for each <strong>of</strong> thebuildings have been aggregated to arrive at overallgrades for the <strong>estate</strong> by percentage <strong>of</strong> floor areain the Figure below and indicates that just under80% <strong>of</strong> the built <strong>estate</strong> falls into the categories Aand B, which is very positive.D-1%C-20%A-5%B-74%Figure 3: Percentage <strong>of</strong> Floor Area byOverall GradeThe <strong>University</strong> has undertaken significantinvestment in the <strong>estate</strong> over recent years withparticular emphasis on the replacement andrenewal <strong>of</strong> the services infrastructure to ensureits resilience in the long term. This investment willcontinue in the future by way <strong>of</strong> specific projectsidentified from the Condition Survey and as part <strong>of</strong>wider refurbishment and development proposals.Annual updating <strong>of</strong> the Condition Survey will beundertaken to identify those works which havebeen completed and monitor the year on yearchanges in overall <strong>estate</strong> condition. The results <strong>of</strong>the Condition Survey have been incorporated intothe <strong>University</strong>’s revised Capital Development Plan.11. Space Management11.1 Overall ManagementThe management and planning <strong>of</strong> all <strong>University</strong>space is undertaken by Estates and CampusServices. Major changes in the proposed use<strong>of</strong> space are reported to and approved by theFinance and Infrastructure Committee, whereasdecisions on minor room changes are approvedby the Deputy Principal (Strategy & Resources).All Departments are asked to indicate their futurespace requirements as part <strong>of</strong> the <strong>University</strong>’sannual planning process.The <strong>University</strong> has operated a space chargingsystem for departmental and centrally timetabledteaching space via the Departmental ResourcePr<strong>of</strong>ile for over 15 years and this has drivenimproved efficiency in the use <strong>of</strong> space by anumber <strong>of</strong> academic departments. A detaileddatabase <strong>of</strong> all <strong>University</strong> space is held whichdetails the size, type, use and occupant <strong>of</strong> eachroom, and this is updated annually.Estates and Campus Services is in the process <strong>of</strong>preparing a Space Management Policy which willformalise many <strong>of</strong> the existing arrangements forspace allocation and set particular standards forthe planning and utilisation <strong>of</strong> space within therestrictions <strong>of</strong> the existing building stock.11.2 Management <strong>of</strong> Teaching SpaceThe <strong>University</strong> currently operates a centrallymanaged timetabling system for the majority <strong>of</strong> itsteaching space, although academic departmentsdo retain control <strong>of</strong> a small proportion <strong>of</strong> teachingrooms. Estates and Campus Services undertakeutilisation surveys over two four week periodseach academic year (one four week block ineach semester) covering both centrally controlledrooms and departmental rooms. The results <strong>of</strong>these surveys over recent years have indicated aneed to review the use <strong>of</strong> teaching space and aSpace Utilisation Working Group, chaired by the31


where are we now: the existing <strong>estate</strong>Senior Deputy Principal (Academic Operations), hasbeen established to investigate methods <strong>of</strong> furtherincreasing the utilisation <strong>of</strong> teaching space. Thebenefits <strong>of</strong> improved utilisation are well recognisedand calculations using the Space ManagementGroup’s 4 efficiency multiplier have indicated thatimprovements in this area should be achievable andcould potentially release space for alternative uses.Significant refurbishment <strong>of</strong> teaching space hasbeen undertaken in recent years to ensure thefacilities can support changing technologies andmethods <strong>of</strong> teaching. The nature and extent <strong>of</strong> thework undertaken has been influenced and guidedby the <strong>University</strong>’s Learning Spaces Group whichwas established to advise on best practice in thedesign <strong>of</strong> learning spaces across the campus. Thegroup draws it membership from the academiccommunity and relevant service departments,and is advised by best practice reports on LearningSpaces such as those produced by Alexi MarmottAssociates and JISC. In addition, laboratory spacewas rationalised and reconfigured when theSchool <strong>of</strong> Biological and Environmental Scienceswas established.11.3 Use <strong>of</strong> Space Management Group metricsThe overall <strong>University</strong> <strong>estate</strong> has been benchmarkedagainst the Space Management Group (SMG) Model<strong>of</strong> the Affordable Estate to measure actual spaceagainst predicted space for an institution <strong>of</strong> the<strong>University</strong>’s size. The areas are based on the 2005/06Estate Management Statistics returns and results areshown in Table 11 below.Table 11: Comparison <strong>of</strong> <strong>estate</strong> size to SMG model predictionsActual(incl. specialistareas)Actual(excl.specialistareas)Predicted(utilisingcurrent spacetools)Predicted(utilising allavailablespace tools)Predicted(average<strong>of</strong> top 25%HEI’s)Total Non-Res Estate 65,220 48,101 60,350 54,667 38,595Core Teaching 10,035 10,035 17,187 15,951 9,774Teaching Offices 5,795 5,795 6,112 6,112 4,088Research 10,121 10,121 11,734 11,734 9,541Library 6,544 6,544 8,607 8,607 6,638Other Support 23,079 5,960 10,648 10,648 5,141Whilst the initial results appear to suggest thecurrent <strong>estate</strong> is larger than expected, this can beaccounted for by the high proportion <strong>of</strong> specialistfacilities on the campus including the <strong>Stirling</strong>Management Centre, shops, Macrobert ArtsCentre, and specialist sports facilities includingthe National Tennis Centre and Robertson TrustSwimming Pool. If these specialist facilities areremoved from the areas, the size <strong>of</strong> the <strong>University</strong><strong>estate</strong> places it close to the top 25% <strong>of</strong> institutionsin space efficiency terms.Whilst changes in teaching methods over theyears have resulted in an element <strong>of</strong> bad fit, themajority <strong>of</strong> the space remains appropriate for the<strong>University</strong>’s requirements. Indeed the fact that the<strong>University</strong>’s academic activities are almost entirelyhoused in two large buildings is advantageousand enables efficient adjustment <strong>of</strong> space arisingfrom the expansion and contraction <strong>of</strong> individualdepartments. The <strong>University</strong> does however suffera number <strong>of</strong> problems in relation to the suitability<strong>of</strong> its buildings. Pathfoot and Cottrell Buildingsare designed on a modular basis which does notreadily adapt to provide the size <strong>of</strong> rooms that maysuit the <strong>University</strong>’s future needs, particularly largerrooms and shared spaces. This also applies to <strong>of</strong>ficespace where academic <strong>of</strong>fices in the Cottrell andPathfoot Buildings were originally designed toallow small group teaching. This teaching modehas reduced considerably due to the financialpressures which have meant that staff/student4The UK Higher Education Space Management Group (SMG) and Space Management Project (SMP) is supported by the four UK funding bodies for highereducation.32


where are we now: the existing <strong>estate</strong>ratios need to be higher, leading to classeswhich are larger than can be accommodated instaff <strong>of</strong>fices. Whilst the ability to improve spaceutilisation by structural alteration is limited by themodular design <strong>of</strong> the buildings, some progress hasbeen made by reducing the <strong>of</strong>fice sizes in PathfootBuilding. Introducing open plan design and <strong>of</strong>ficesharing are considered where appropriate andalteration work to create such areas has beensuccessfully completed in a number <strong>of</strong> areas.Additionally in recently constructed extensions toCottrell and Pathfoot Buildings for academic use amore appropriate <strong>of</strong>fice area has been provided.12. Ecological SurveyA desk and field based investigation into theecological baseline conditions <strong>of</strong> the main <strong>University</strong>campus was undertaken by external consultantsin <strong>2007</strong> with the findings being presented in theform <strong>of</strong> an Ecological Baseline Report. A number <strong>of</strong>statutory and non-statutory bodies were consultedas part <strong>of</strong> this process including:»»»»»»»»Scottish Natural Heritage (SNH)The Royal Society for the Protection <strong>of</strong> Birds(RSPB)Scottish Wildlife Trust (SWT)British Trust for Conservation Volunteers (BTCV)The Ecological Baseline Report was informed byan Extended Phase 1 Habitat Survey which wasundertaken in July and August <strong>2007</strong>. The surveyidentified any important habitats and plant species,as well as recording signs <strong>of</strong> fauna and areas <strong>of</strong>habitat that may be suitable for protected species.A map <strong>of</strong> the campus with the key habitatsidentified, together with accompanying targetnotes, is included as Appendix 2.The key findings within the Ecological BaselineReport may be summarised as follows:»» The <strong>University</strong> campus supports a variety <strong>of</strong>habitats including plantation and semi-naturalwoodland, grassland, scrub and tall herbs andgrasses <strong>of</strong> the type that grow in waste ground,water bodies and formal gardens»» Other than the Designed Landscape, thereare no statutory designated sites within the<strong>University</strong> campus»» There are two non-statutory Local Wildlife Sites(LWS) <strong>of</strong> nature conservation interest within thecampus. One <strong>of</strong> these encompasses HermitageWood to the north <strong>of</strong> the campus whilst theother encompasses Airthrey Loch»» There are areas <strong>of</strong> non-statutory designatedwoodland within the campus including areas <strong>of</strong>Ancient Woodland (AW) and Long EstablishedWoodland <strong>of</strong> Plantation Origin (LEWPO)»» Pipestrelle bats (common and soprano) whichare protected under the Conservation (NaturalHabitats etc) Regulations 1994 have historicallyroosted within the campus»» No other signs <strong>of</strong> protected species wereidentified during the Extended Phase 1Habitat Survey»» The most ecologically sensitive habitats withinthe campus are the semi-natural and matureplantation woodlands and water bodiesFurther ecological surveys and Ecological ImpactAssessments may be required to inform particulardevelopments and this could include land adjacentto the campus. In addition, a number <strong>of</strong> habitatmanagement and enhancement opportunities areidentified within the report including:»» Continuation and expansion <strong>of</strong> the woodlandmanagement plans which are currently in placefor Hermitage and Spittal Woods»» Educational and interpretation opportunitieswith information regarding the history andhabitats <strong>of</strong> the campus which would alsobe seen to be good practice under the LandReform Act»» Improvements to the loch and its surrounds»» Expansion <strong>of</strong> season meadow managementplans to increase biodiversity»» Further management <strong>of</strong> invasive and aggressivespecies, and wider planting <strong>of</strong> native species toincrease the diversity <strong>of</strong> habitats»» Further habitat and species monitoringIt is proposed that these be further investigatedand taken forward as part <strong>of</strong> a campus-wideBiodiversity Policy and Management Plan.33


where are we now: the existing <strong>estate</strong>13. Performance AssessmentRegular monitoring <strong>of</strong> <strong>estate</strong>s performanceis a key element <strong>of</strong> <strong>estate</strong> management. Akey part <strong>of</strong> this is the Higher Education EstateManagement Statistics (EMS) service whichis operated for the sector by IPD OccupiersProperty Databank. The main objective <strong>of</strong> EMSis to give UK Higher Education institutionsaccess to relevant information to enable better<strong>strategy</strong> and decision making, and providebenchmark information to facilitate internaltracking <strong>of</strong> performance and <strong>estate</strong>s informationdevelopment.A range <strong>of</strong> key metrics from EMS were developedinternally as part <strong>of</strong> the <strong>University</strong>’s KPI process in2006 and these are monitored on an annual basisto benchmark performance against a selection <strong>of</strong>comparator Universities, as well as highlightingsignificant changes in <strong>Stirling</strong>’s year on yearperformance. The current list <strong>of</strong> metrics usedis included at Appendix 3. A selection <strong>of</strong> thesemetrics is submitted to the <strong>University</strong>’s Finance andInfrastructure Committee annually and particularmetrics have been used to highlight areas <strong>of</strong> poorperformance (e.g. teaching space utilisation)in order that appropriate remedial action maybe investigated.34


Part 4Development Potential35


development potentialPart 4Development Potential14. Campus Development Plan14.1 The Existing Campus – RevisedDevelopment PlanThe original development plan for the <strong>University</strong>was produced in 1968 and subsequently updatedin 1973 following the initial development <strong>of</strong> thecampus. A review <strong>of</strong> these original developmentplans was undertaken in 1994 and an InterimDevelopment Plan prepared at that time inconsultation with the Local Authority.Considerable development has taken place in thelast 10 years and all <strong>of</strong> the previous DevelopmentPlans may now be considered to be out <strong>of</strong>date. A re-assessment <strong>of</strong> the Campus and itscapacity for further development has thereforebeen undertaken utilising external consultantsand pr<strong>of</strong>essional staff within the <strong>University</strong>. Inidentifying sites for these potential developmentsaccount has been taken <strong>of</strong> the <strong>University</strong>’s desireto maintain the integrity and value <strong>of</strong> the DesignedLandscape and <strong>of</strong> the concerns expressed byoutside conservation bodies such as HistoricScotland. In particular, to maintain the qualities <strong>of</strong>the <strong>estate</strong> and campus three design principles forthe location <strong>of</strong> new development established inthe 1968 Development Plan continue to be appliedwhere possible. These are:££ New development should be an extensionto the existing teaching and social coreas envisaged by the 1968 and 1973Development Plans££ New development should be located close tothe edges <strong>of</strong> the Estate with a backgroundsetting <strong>of</strong> woodland££ New development outwith these zonesshould be located so as to maintain views,to and across water, within and beyond thecampus, and should not interrupt the mainvisual horizons or ridges within the siteA plan <strong>of</strong> the campus with the potentialdevelopment sites identified is included atAppendix 5. Sites for both building (coloured pink)and landscape development (coloured green) havebeen identified and, where possible, the buildingdevelopment sites have been categorised underacademic, sports, commercial and residential. Thesites for future building development identifiedon the plan for the most part meet the first twocriteria above. The Peninsula site to the east <strong>of</strong> thecentral area, Wallace View at the east end <strong>of</strong> thecampus, and the Airthrey Castle annex sites wouldall require careful consideration in relation to thethird criterion above, as all three are within thevisual field <strong>of</strong> Airthrey Castle.As far as non-residential accommodation on the<strong>Stirling</strong> campus is concerned, sufficient buildingsites remain readily available, subject to planningapproval, to cater for growth. Further sites areavailable for the expansion <strong>of</strong> the ManagementCentre and Sports Centre, and for free-standingand privately resourced institutes should suchdevelopment be desirable.With regard to residential accommodation, it isestimated that the Campus can provide sites fora total <strong>of</strong> 250 additional bed spaces (currently1965). However, the <strong>University</strong>’s policy is toincrease the amount <strong>of</strong> ensuite accommodationas refurbishments proceed in order to provide anappropriate quality <strong>of</strong> accommodation for studentsand commercial customers. The total number <strong>of</strong>bed spaces will reduce over the period as the hallsare refurbished and altered to increase the number<strong>of</strong> ensuite rooms. This reduction could be <strong>of</strong>fsetby the provision <strong>of</strong> an appropriate number <strong>of</strong> newspaces on the development sites.The updated Development Plan has been discussedwith the representatives <strong>of</strong> the local authority’sPlanning Department and no particular concernswere raised about any <strong>of</strong> the developmentsindicated. The <strong>University</strong> indicated its preferencethat the updated Development Plan should bereferenced in the current Local Plan as the newLocal Development Plan (LDP) would not beproduced for a number <strong>of</strong> years. The Plannersconfirmed that there was a precedent forenshrining this type <strong>of</strong> information in the CurrentLocal Plan as Supplementary Planning Guidance.36


development potential14.2 SUIP Master PlanScottish Enterprise Forth Valley on behalf <strong>of</strong>the SUIP partners (<strong>Stirling</strong> Council, ScottishEnterprise Forth Valley and <strong>University</strong> <strong>of</strong> <strong>Stirling</strong>)has commissioned a master plan to determinehow both existing buildings and developmentsites could be best utilised to deliver maximumeconomic impact.The completed study will include»» an overview <strong>of</strong> the development potential <strong>of</strong>the site in the context <strong>of</strong> current economic andproperty market conditions»» an appraisal <strong>of</strong> each <strong>of</strong> the existing buildingsand development sites to include thedevelopment opportunities and potential targetmarkets <strong>of</strong> each»» an indicative physical master plan layoutindicating the optimum building footprints andpotential site massingThe study will inform the partners on thedevelopment options and appropriate next stepsrequired to successfully deliver accommodationsolutions to meet anticipated market demand.The Plan is due to be finalised in February 2008and could impact on the <strong>University</strong> Estate if the siteoccupied by E&CS’ Property Management team isidentified as a possible site for future expansion<strong>of</strong> the Innovation Park. Any plans for this site tobe released would need to be fully funded and toincorporate proposals for a relocation <strong>of</strong> PropertyManagement to the area adjacent to the Gardensand Grounds team. Such plans are unlikely to bebrought forward for consideration during the earlyyears <strong>of</strong> this Estate Strategy period.14.3 Planning IssuesDevelopment on the <strong>University</strong> campus isconstrained by its designation as both a Gardenand Designed Landscape (by Historic Scotland andScottish National Heritage) and its inclusion withinan Area <strong>of</strong> Great Landscape Value (regional).The <strong>University</strong> is conscious <strong>of</strong> its superb settingand <strong>of</strong> the critical importance <strong>of</strong> developing thecampus in a sensitive manner. A number <strong>of</strong> bodiesare involved in consultations on the physicaldevelopment <strong>of</strong> the <strong>estate</strong> and specific proposalswill be considered by Historic Scotland and ScottishNatural Heritage in addition to the mainconsultee on all planning issues - <strong>Stirling</strong> CouncilPlanning Department.Currently four buildings are listed (Airthrey Castle,Garden Cottage, Ivy Cottage and East Lodge) asbuildings <strong>of</strong> special architectural or historic interestwith work being subject to listed building consent.Historic Scotland has recently indicated that theywish to investigate the possibility <strong>of</strong> designatingthe Principal’s House and the additional houses inAirthrey Castle Yard and to review the campus asa whole. The proposals come in the context <strong>of</strong> the<strong>University</strong>’s 40th anniversary and the conferencehosted in November <strong>2007</strong> by the Department <strong>of</strong>History entitled <strong>University</strong> <strong>of</strong> <strong>Stirling</strong> 1967-<strong>2007</strong>:Buildings, Landscape and Environment. A followup meeting has identified that Historic Scotlandwish to review the status <strong>of</strong> those buildings whichare already listed and to review whether thereare other buildings which should be consideredfor listing. The Pathfoot Building and the housesin Airthrey Castle Yard, including the Principal’sresidence, are <strong>of</strong> particular interest. Survey workwill take place during Spring 2008. The <strong>University</strong>has stressed that it wishes to ensure that buildings<strong>of</strong> particular interest are protected for the futurebut that it also needs to ensure that its <strong>estate</strong> isfit for purpose and can be extended and modifiedsympathetically in line with the needs <strong>of</strong> aworking <strong>University</strong>.Certain developments outwith the campus mayhave an adverse effect on amenity, value and the<strong>University</strong>’s ability to develop further. Decisionswill need to be made on whether to object ormake representations on any notices <strong>of</strong> proposeddevelopment, or any other planning notices, e.g.compulsory purchase or nature conservation anda robust management process will be required tosupport this.Planning applications and other developmentscurrently under discussion and that couldpotentially affect the <strong>University</strong> include:»» Beauly to Denny high voltage power line. ThePublic Inquiry ended in December and it isexpected that it will be a year before the finalreport is submitted to Scottish Ministers for adecision. The <strong>University</strong> submitted evidence inNovember 200637


development potential»» The City Expansion is a proposal to allocateland from 2015 for 1500 new houses andemployment in one <strong>of</strong> 3 possible locations, one<strong>of</strong> these being in the Dunblane/Bridge <strong>of</strong> Allan/Causewayhead area. No details are included inthe Structure Plan as these will be dealt with inthe Local Plan»» The West <strong>Stirling</strong> Link Relief Road is intendedto complete the <strong>Stirling</strong> outer ring road byconnecting Causewayhead Road to Kildean RoadThe existence <strong>of</strong> major underground pipelinesor other infrastructure (including significant gasmains) under a site can have a major effect onthe building density which is allowed and thisdocument may need to be assessed against anyknown or intended developments.Sustainability, the need to limit impact on climatechange and the related requirement for developersto manage and reduce any impact on theenvironment will increasingly affect developmentproposals. A demonstration <strong>of</strong> compliance withsustainable development principles will be neededfor all proposals in future. This will includeaspects such as energy efficiency, increased use<strong>of</strong> sustainable public transport and on-site microgeneration<strong>of</strong> power.15. Potential for CollaborationThe <strong>University</strong>’s collaborative strength lies in twokey areas:»» articulation arrangements with a number <strong>of</strong>educational bodies with the aim <strong>of</strong> providingstudents with defined pathways for study orfor progressing between different courses<strong>of</strong>fered by different institutions. Many <strong>of</strong> thesearrangements lead to a recognised qualificationvalidated by the <strong>University</strong>. The most recentpartnering arrangement is with a commercialorganisation and aims to recruit undergraduatestudents from overseas and provide them withthe necessary study and language skills priorto entry to an undergraduate degree course.The first students were recruited to the <strong>Stirling</strong>International Study Centre in Autumn <strong>2007</strong>»» collaborative research activity where researchersfrom <strong>Stirling</strong> are working with researchersbased in other institutions in the pursuit <strong>of</strong>applications for research funding and theconduct <strong>of</strong> researchIts physical location in central Scotland is one <strong>of</strong>the <strong>University</strong>’s strengths but also means thatthere are few Higher or Further EducationInstitutions in close proximity. This means thatthe physical sharing <strong>of</strong> facilities or services is aparticular challenge.Exploratory discussions were held with ForthValley College in 2006 and <strong>2007</strong> as part <strong>of</strong> theirconsideration <strong>of</strong> a new <strong>estate</strong> <strong>strategy</strong> for thecollege. It is generally recognised that physicalco-location needs to academically-led. The twoorganisations portfolios are quite different andearlier discussions had reinforced the fact thatcollaboration was best based on articulation,co-location having not been identified as arequirement for this. Opportunities for sharingphysical facilities (sports and recreational) and forthe potential use <strong>of</strong> common <strong>estate</strong>s services wereidentified but would have required the College’snew <strong>Stirling</strong> campus to be located as close to the<strong>University</strong> as possible to make this a viable option.However, the College had already identified apreferred location in <strong>Stirling</strong> (the Raploch) whichsuited its business objectives and did not wish tore-open the appraisal <strong>of</strong> alternative locations. Thechosen location means that the sharing <strong>of</strong> facilitiesis not viable because <strong>of</strong> the distance betweenthe two locations. The same applies to be jointprovision <strong>of</strong> <strong>estate</strong>s services.The <strong>University</strong> is a member <strong>of</strong> the Forth ValleyProperty Group alongside the three localauthorities, the health board and the emergencyservices. This group shares information aboutproperty and <strong>estate</strong> matters in the interest <strong>of</strong>co-operation and efficiency. The <strong>University</strong> isworking closely with <strong>Stirling</strong> Council on anydisposals, in that these might be <strong>of</strong> interest to theauthority in relation to its priority for additionalaffordable housing, and on the provision <strong>of</strong>student accommodation.38


Part 5<strong>estate</strong> Priorities in thecontext <strong>of</strong> the strategic Plan39


<strong>estate</strong> priorities in the context <strong>of</strong> the strategic planPart 5Estate Priorities in the Context <strong>of</strong> the Strategic Plan16. Proposed solutions for those strategicpriorities with <strong>estate</strong> implicationsThe following table identifies those strategicpriorities which have <strong>estate</strong> implications and thepotential solutions.Table 12: strategic priorities and <strong>estate</strong> solutionsStrategicPriorityResearch andKnowledgeTransferLearning andTeachingSportOrganisationalDevelopmentEstate implicationsNeed for additional space for researchersand research studentsNeed for space for CCRCContinued upgrading <strong>of</strong> research facilitiesContinued upgrading <strong>of</strong> Lecture Theatresand teaching spacesRefurbishment <strong>of</strong> LibraryContinued investment in existing facilitiesCentre for Sporting ExcellenceEstablishing School <strong>of</strong> ManagementRestructuring <strong>of</strong> Service DepartmentsProposed solutionsImprove utilisation to free spaceDevelop site in Cottrell or Pathfoot(subject to research income)Propose development <strong>of</strong> Wallace View(subject to external funding)CDP/RCIF fundingCDP/LTIFCDP/RCIF/LTIF/FundraisingRecurrent budgets and CDPRedevelopment <strong>of</strong> Gannochy site iffunding availableInitially, to provide a ‘front door’ withinexisting footprintNew build if funding availableSpace reconfigurationFunding andFinanceInternationalisationNo specific <strong>estate</strong> implications -Possible need for additional teachingspaceRequirement for additionalaccommodation guaranteesAdditional/improved facilities forinternational studentsImproved utilisation to free spaceReview <strong>of</strong> policy for allocation <strong>of</strong>residential spaceTo be identified by Marketing &Internationalisation WGMarketingEstateDevelopmentsImproved external signage &interpretation <strong>of</strong> campusPriority facilities which would improvemarket positionFurther upgrading <strong>of</strong> residences to meetstudent and non-student requirementsImplementation <strong>of</strong> capital projectsFurther investment in sustainabilityCDPMarketing & Internationalisation WG toidentifyProposed residential <strong>strategy</strong>CDP – subject to affordabilityReduction in consumption <strong>of</strong> utilities –insulation, improved building controls,standards for new buildDevelopment <strong>of</strong> Carbon ManagementStrategyDevelopment <strong>of</strong> Biodiversity Policy &Management Plan for grounds & habitatsFurther limitations on car parking &creation <strong>of</strong> public transport hub betweenCottrell and SMC (if further development<strong>of</strong> SUIP takes place)40


<strong>estate</strong> priorities in the context <strong>of</strong> the strategic plan17. Summary <strong>of</strong> proposed <strong>strategy</strong> onstudent accommodationThe <strong>University</strong> has a range <strong>of</strong> accommodationwhich is used by students during semesters(September to May) and for conference businessduring the summer months. The provision andmanagement <strong>of</strong> residential accommodation isviewed as core to the <strong>University</strong>’s activities andperhaps given more prominence than in otherinstitutions. This is largely because <strong>of</strong> it being acampus university and because the residentialexperience is considered to be a key element <strong>of</strong>the student experience. The provision <strong>of</strong> residentialaccommodation to students generates an annualturnover <strong>of</strong> circa £7m. A further £900,000 (basedon income achieved during financial year 06/07)comes from the use <strong>of</strong> the residences for nonstudentpurposes. The latter figure is the grossincome obtained from conferencing and eventbusiness that is achieved as a direct result <strong>of</strong> havingaccommodation available to service these events.The current portfolio <strong>of</strong> 2,799 directly-managedbedrooms includes a range <strong>of</strong> accommodationfrom standard study bedrooms in traditional halls<strong>of</strong> residences to ensuite study bedrooms andcluster flats for 5/7 occupants.The <strong>University</strong> has invested £11.8m onrefurbishment <strong>of</strong> the campus residential <strong>estate</strong>since 1994. The scope <strong>of</strong> each project has varieddepending on the availability <strong>of</strong> funding and theneed to maintain a range <strong>of</strong> accommodationoptions to ensure that student and non-studentaspirations were met. Each project has includedwork to ensure compliance with current legislativerequirements, such as HMO (Houses in MultipleOccupancy), but the extent <strong>of</strong> refurbishment hasvaried from project to project resulting in varyingstandards and provision across the range <strong>of</strong>accommodation. Andrew Stewart Hall benefitedfrom the original space being remodelled and nowprovides 207 bedrooms with either ensuite orprivate bathroom facilities. Other projects such asA K Davidson Hall have been restricted toaddressing legislative compliance requirementswith minimal refurbishment.Although much work has already been undertakenthere are a number <strong>of</strong> outstanding projects thatmust proceed to ensure compliance with currentlegislative requirements and to protect the longtermfuture <strong>of</strong> the residential <strong>estate</strong>. In particular,Murray Hall and Geddes Court, which have hadno major refurbishment work carried out sincethey were built and currently do not complywith HMO regulations, and therefore mandatorywork must be carried out to ensure that the<strong>University</strong> can continue to use these premises.The local authority has agreed to relax licensingrequirements to enable the <strong>University</strong> to continueto use these residences on the understandingthat refurbishment will go ahead and that thiswill include all <strong>of</strong> the work needed to ensure fullcompliance. If the <strong>University</strong> failed to undertakethis work the Council would be within its rightsto enforce a closing order on these premises. Itis also the case that major elements <strong>of</strong> work havebeen omitted (e.g. Window replacement, servicesrenewals etc.) from earlier refurbishment projectson cost grounds and it will be necessary to carryout further work to these residences to ensuretheir long-term sustainability. As highlighted inSection 10, the condition survey undertaken in2006 estimated the total costs to restore theresidential <strong>estate</strong> to a sound condition complyingwith statutory requirements as £15.9m over aten year period. This figure does not allow forimprovements in functional suitability to meetstudent demand and aspirations.Student demand for accommodation generallyexceeds supply and the guarantee given to firstand final year students, means that those studentswho are unsuccessful in acquiring <strong>University</strong>accommodation tend to be 2nd and 3rd yearundergraduates. Unsuccessful applicants normallyseek accommodation in the private sector <strong>of</strong> which<strong>Stirling</strong> has an adequate supply. However surveysindicate that the key factors for students in relationto accommodation are:»» that they prefer on-campus accommodation to<strong>of</strong>f-campus <strong>University</strong> accommodation»» they expect network provision in all rooms»» they would prefer an improvement in thestandard <strong>of</strong> accommodation provided,particularly in residences that have yet tobenefit from refurbishment»» Lower rent charges41


<strong>estate</strong> priorities in the context <strong>of</strong> the strategic planSUSA has expressed the view that <strong>University</strong>accommodation is <strong>of</strong>ten preferable as it <strong>of</strong>fers acheaper, more secure service than many privateaccommodation providers in the local area. SUSAbelieves that choice is essential and where studentsopt to rent in the private sector, it is vital thatthey have access to informed advice and supportthrough the <strong>University</strong>.Appendix 4 provides more detail on the residential<strong>estate</strong>, the refurbishment work carried out todate and that still required. It also presents theresults <strong>of</strong> an option appraisal on the way forwardwith student accommodation. The advantages,disadvantages and cost <strong>of</strong> the following six optionswere considered:1. Maintain the current portfolio without furthercapital investment (do nothing)2. Maintain the current portfolio and invest toensure compliance with legislation only3. Maintain current portfolio and invest toupgrade provision, retaining existing spatialarrangements i.e. no additional ensuite orprivate facilities4. Maintain current portfolio and invest toupgrade provision to meet student and nonstudentexpectations including remodelling t<strong>of</strong>urther increase ensuite and private facilities5. Change scope and size <strong>of</strong> existing <strong>estate</strong> -2 sub optionsA. Refurbish on-campus accommodation,dispose <strong>of</strong> <strong>of</strong>f-campus accommodation andextend Alexander Court;B. Refurbish on-campus accommodation,dispose <strong>of</strong> <strong>of</strong>f-campus accommodationand seek a nomination agreement witha private provider6. Consider transfer <strong>of</strong> all or some accommodationto a third party providerThe costs <strong>of</strong> these options range from £1.5m to£20m (Annex C, Appendix 4). A number wouldlead to reducing revenue streams over time asthe uptake <strong>of</strong> accommodation dwindles and itsdeteriorating quality means that <strong>Stirling</strong> becomesa less attractive option for out <strong>of</strong> semesterconferences and events.Taking into account the importance <strong>of</strong> residentialaccommodation to a campus university’s <strong>of</strong>ferand the potential contribution to the studentexperience, it is recommended that the <strong>University</strong>should focus on the on-campus facilities andinvest enough to bring all <strong>of</strong> this accommodationto a good standard. To enable this option 5B isrecommended at a total cost <strong>of</strong> £12.5m. Thisoption would mean the disposal <strong>of</strong> an <strong>of</strong>f-campus<strong>University</strong> owned residence (John Forty’s Court),probably for non-student business. The sale wouldgenerate a cash receipt in the region <strong>of</strong> £8mwhich would form a significant contribution tothe refurbishment <strong>of</strong> on-campus accommodation,and would also avoid the additional cost <strong>of</strong>refurbishment <strong>of</strong> John Forty’s Court in thelonger-term. If it is necessary to <strong>of</strong>fset the loss <strong>of</strong>residential capacity which would result from thedisposal and further refurbishment on-campus, the<strong>University</strong> could enter into a nomination agreementwith a private provider. The <strong>University</strong> would wishto influence the quality <strong>of</strong> provision and servicestandards if this option were pursued.42


Part 6Financial Issues43


financial issuesPart 6Financial issues18. Investment in the <strong>estate</strong> – past andfutureOver the <strong>University</strong>’s 40 years, it has investedsignificantly in the Estate through maintenance andcapital investment.18.1 MaintenanceMaintenance tasks are categorised as reactivemaintenance or planned preventative maintenance.Where an Institution is adequately funded thebalance between these categories would shift asmore emphasis is placed on the latter.The <strong>University</strong>’s current annual expenditure on themaintenance <strong>of</strong> the non-residential <strong>estate</strong> amountsto £1.8m. The current split between reactiveand planned maintenance shows that £1.55mis spent on reactive maintenance (Major Repairs£250k and Direct Labour including managementand administration £1,300k) and a further £250kon planned preventative maintenance. On theresidential <strong>estate</strong>, the total annual maintenanceexpenditure is £690k, with the split being £340kfor reactive maintenance and £350k for plannedpreventative maintenance. However, there iscrossover between the categories and theseallocations are known to be less than 100%reliable. The Property Management Division is inthe process <strong>of</strong> developing a Maintenance Strategyto ensure that maintenance tasks are properlyprioritised and that an appropriate balancebetween reactive and planned maintenance isachieved and properly recorded.The report produced by JM Consulting for SFCsuggested that in order to sustain and developthe <strong>estate</strong> in a manner to prevent increasing levels<strong>of</strong> maintenance backlog, institutions should bespending an annual amount equivalent to circa4.5% <strong>of</strong> their Insurance Replacement Value (IRV)on maintenance and capital works. It was furthersuggested that the maintenance share <strong>of</strong> thisshould be 2.5%. The insurance replacement value<strong>of</strong> the <strong>University</strong>’s buildings is circa £146m for thenon residential <strong>estate</strong> and £78m for the residential<strong>estate</strong>. The resultant maintenance target for thenon residential <strong>estate</strong> would therefore be £3.65m,and for the residential <strong>estate</strong> it would be £1.95m.Whilst this level <strong>of</strong> expenditure would provide asignificant challenge in terms <strong>of</strong> resourcing, thecalculation would suggest that there is currentlyan under investment in maintenance. The currentassumption is that the maintenance budget willremain at its current level subject to affordability.In addition, the JM Consulting report suggests that2% <strong>of</strong> IRV should be spent annually on capitalinvestment. The total IRV <strong>of</strong> the <strong>University</strong> <strong>estate</strong>is £225m which would give a suggested annualfigure <strong>of</strong> £4.5m. Since 2002, the <strong>University</strong>’saverage annual capital expenditure has been circa£7.4m, however this has included a number <strong>of</strong>new build projects and therefore this particularmeasure must be treated with caution. Capitalinvestment tends to fluctuate considerablybetween years depending on a number <strong>of</strong> factors,including windows <strong>of</strong> opportunity to carry out theworks, the <strong>University</strong>’s strategic priorities, externalfunding and affordability.18.2 Capital investmentIn 2003, the <strong>University</strong> approved a CapitalDevelopment Plan (CDP) which covered the 10year period 2003/04 to 2012/13, subject to anongoing assessment <strong>of</strong> affordability. This plan hasundergone several revisions to reflect changes inthe <strong>University</strong>’s strategic priorities and to allow newprojects to be introduced where appropriate. In theperiod prior to the plan being implemented, the<strong>University</strong> had agreed an annual budget <strong>of</strong> circa£1.1m for capital investment. Since 2002 a total <strong>of</strong>£37m has been spent on capital projects.In order to bring the CDP into line with the EstateStrategy an extended plan has been prepared andis attached at Appendix 6. The projects within theplan were identified from five main sources:»»The <strong>University</strong>’s strategic priorities»» Specific initiatives from academic or servicedepartments»» The Condition Survey (assessment <strong>of</strong> the <strong>estate</strong>condition and backlog maintenance)44


financial issues»» Specific projects identified by Estates & CampusServices relating to physical infrastructure»» Specific projects identified by InformationServices relating to IT infrastructure and thedevelopment and implementation <strong>of</strong> majorsystemsThe projects within the plan were scored against arange <strong>of</strong> weighted criteria which are fundamentalto the <strong>University</strong>’s further investment - includingfit with the organisation’s strategic priorities, goodstewardship <strong>of</strong> the <strong>estate</strong>, ensuring statutorycompliance, and optimising the stakeholderexperience. The new plan covers the period2003/04 to 2016/17 and identifies the completelist <strong>of</strong> projects which the <strong>University</strong> may wishto undertake. The overall cost for the period isestimated at £163m and initial work to analysethe impact <strong>of</strong> this level <strong>of</strong> expenditure on the<strong>University</strong>’s cash flow and surplus/deficit indicatesthat the plan is not affordable in its totality. Furtherwork is being undertaken on the projections <strong>of</strong>income and expenditure to determine the level<strong>of</strong> expenditure which is sustainable and this isexpected to be concluded during the spring <strong>of</strong>2008. The plan will be further prioritised at thisstage to identify those projects which are to betaken forward in the short and medium term andthose which are to be deferred. Within the wholeplan detailed consideration will be given to fundinga rolling 3 year programme. In addition, the<strong>University</strong> will continue to review the CDP annuallyand to adjust the projects to be implementedbased on affordability and other competingdemands for investment.18.3 Financing proposals and viabilityassessmentThe <strong>University</strong> has made a significant investmentthrough its capital expenditure programme. Inaddition to the amount noted above it intends toinvest an additional £32m to be spent over thenext 3 years. In addition, £10m has been spent onmaintenance <strong>of</strong> the <strong>estate</strong> since 2002.This expenditure has primarily been financedthrough capital grants (LTIF, SRIF, sportscotland,Lottery), bank loans and a finance lease. Inaddition, the <strong>University</strong> generates an annual cashsurplus <strong>of</strong> around £6m per annum before capitalexpenditure and interest costs. In April <strong>2007</strong>,the existing loan portfolio was repaid using the<strong>University</strong>’s own cash reserves and a RevolvingCredit Facility (RCF) <strong>of</strong> £20m was put in placewith Barclays Bank and Lloyds TSB. This is amore cost effective method <strong>of</strong> financing capitalinvestments as it provides greater flexibility to theoverall treasury management and has provision forestablishing term loans for core borrowing whenrequired.The proposed capital expenditure plan to 2016/17has been analysed. The initial total capitalrequirement identified for the period <strong>2007</strong>/08to 2016/17 amounted to £136m. In addition, intaking forward its strategic priorities, the <strong>University</strong>will have significant human capital investmentneeds that can only be met from the samerestricted funding pool.Based on the current funding facility <strong>of</strong> £20mtogether with the grants, capital receipts and thefundraising targets noted below, it is estimatedthat capital expenditure <strong>of</strong> around £100m between<strong>2007</strong>/08 and 2016/17 is likely to be affordablein cash flow terms. This assessment is basedon our current understanding and forecasts <strong>of</strong>future income and expenditure. In the currentclimate even the next year is subject to significantcaveats and is likely to change. Therefore, it willbe necessary to keep this total under review inrelation, not only to cashflow, but critically to theimpact on the revenue account <strong>of</strong> the timing <strong>of</strong>projects and final cost, the resultant depreciationcharges and the cost <strong>of</strong> borrowing. Hence, the<strong>University</strong> will continue to approve the CDP on ayear by year basis and to check affordability formajor projects on a case by case basis.The assumption on the total funds likely to beavailable is based on the following inflows anddonations in addition to the normal activity <strong>of</strong> the<strong>University</strong>:Capital Grants (LTIF/SRIF) £28mProject specific grants £14.5mSale <strong>of</strong> <strong>of</strong>f-campus assets £8mDonations and Fundraising £5mThe phasing <strong>of</strong> the proposed capital plan to2016/17 has been subject to detailed analysis andmodelling subsequent to the initial prioritisationand categorisation review. Some projects have45


financial issuesbeen transferred to bids for recurrent funding asthey do not meet the capitalisation criteria, andothers have been set aside as they are the subject<strong>of</strong> specific bids for external funding. If this fundingis not forthcoming these projects are unlikely toproceed in the planning period.As noted above, the <strong>University</strong> has a £20mRCF, which is convertible into a term loan. Theaffordability analysis is based on the £20m facilitybeing converted into a term loan repayable over15 years through annual amortising interest andcapital payments.Under the new FM conditions the <strong>University</strong> hasthe scope to borrow up to £35m before referralto the Funding Council is required. However theanalysis to date suggests that the <strong>University</strong> wouldbe unable to afford the annual financing costs onthis level <strong>of</strong> borrowing. In addition the <strong>University</strong>is required to adhere to the financial covenantsimposed by the RCF.At the current time the <strong>University</strong> does not haveany formal arrangements in place to manageinterest rate risk. However, such measurers will beput in place as and when the RCF is converted toterm loans.The current revenue budget <strong>strategy</strong> includes theassumption that the maintenance budget willcontinue at its current level but subject to thenormal assessment <strong>of</strong> affordability arising at thetime <strong>of</strong> agreeing the detailed annual budget.46


Part 7consultation47


consultationPart 7ConsultationThe following institutions or groups have beenconsulted during the development <strong>of</strong> the newEstate Strategy:<strong>Stirling</strong> Council<strong>Stirling</strong> Council Planning DepartmentScottish Enterprise<strong>Stirling</strong> <strong>University</strong> Student Association<strong>Stirling</strong> <strong>University</strong> staff and campus unionsFit with the Council’s Strategic Plan and priorities, and theLocal Economic Development StrategyDiscussion <strong>of</strong> updated Campus Development PlanFit with Forth Valley Regional Economic Development StrategyComments invited on the proposed Contents and ExecutiveSummaryThe Estate Strategy was considered by the Financeand Infrastructure Committee and formallyapproved by <strong>University</strong> Court in March 2008.48


Part 8Implementation andReview Process49


implementation and review processPart 8Implementation and review processAppendix 7 provides an action plan derived fromthe new Estate Strategy and necessary for itsimplementation.Progress with implementing the <strong>strategy</strong> will bereviewed quarterly by members <strong>of</strong> the SeniorManagement Team in Estates & Campus Servicesand as part <strong>of</strong> the Department’s annual away dayon planning matters held early in the calendar year.Issues will be reported by exception to the Financeand Infrastructure Committee (FIC).quarterly reviews will address any changes neededto the Estate Strategy as a result <strong>of</strong> this activity.The Estate Strategy will be reviewed more fully atleast every five years or earlier if changes to the<strong>University</strong>’s strategic priorities require it.A brief update summarising progress made withimplementing the <strong>strategy</strong> plus key changes to thedocument will be provided to the Scottish FundingCouncil each November.The <strong>University</strong> revisits, and if necessary refocuses,its strategic priorities each year. One <strong>of</strong> the50


Appendices51


appendicesAppendix 1Historic Development <strong>of</strong> the Airthrey EstateAirthrey Castle was built around 1792 for RobertHaldane, a retired naval <strong>of</strong>ficer, to the design<strong>of</strong> Robert Adam. Adam’s romantic design forthe Castle was influenced by his knowledge <strong>of</strong>the classical Italian landscape; as was the layout<strong>of</strong> the <strong>estate</strong> landscape completed by ThomasWhite from County Durham in 1798. White wasa pupil <strong>of</strong> “Capability” Brown and with his sonThomas White Jun. completed over forty majorcommissions throughout Scotland during theperiod 1780-1819.White employed a simple approach to design,which was typified by a serpentine approachdrive, rising to a mansion on a hill and passingen-route the maximum number <strong>of</strong> newly formedclumps <strong>of</strong> trees. The function <strong>of</strong> peripheralwoodland was to hide the edges <strong>of</strong> the park. Thehardwood plantings <strong>of</strong> the design were intendedto have a life span <strong>of</strong> 200 years. In the Claudiantradition, water is the link between foregroundand background, yet the Whites appear to havehad little interest in, or to have made much use<strong>of</strong>, water. The artificial Airthrey Loch is thoughtto have been created by Robert Haldane himself.Although no contemporary records exist for theoriginal layout, White’s explanation for his designat Scone Palace sums up his approach to designwhich was surely similarly employed at Airthrey:“to raise up such plantations as well as shut outdeformities, heighten its beauties, and by breakingthe distant scenery as you pass along, introducethe same objects in different lights, and points <strong>of</strong>view and thereby give you an agreeable change<strong>of</strong> Scene.”The Ordnance Survey edition <strong>of</strong> 1899 clearlyshows the essential characteristics <strong>of</strong> the originallayout. The <strong>estate</strong> is dominated by Airthrey Castlelocated on rising ground against the woodedcrags <strong>of</strong> Hermitage Wood to the north andwith commanding views southwards towardsAbbey Craig, the Carse <strong>of</strong> the River Forth, andover Airthrey Loch which forms a secondaryfocus within the western section <strong>of</strong> the Estate.Other buildings and productive functions suchas the walled garden are carefully located withinwoodland and separated from the main houseso as not to threaten the integrity <strong>of</strong> its setting.The main plantations within the Estate run innorth/south strips, on steep slopes or along theridges <strong>of</strong> higher ground as at Spittal Hill, to thusprovide maximum shelter from prevailing windscombined with maximum southerly exposure. Aswell as concealing the edges <strong>of</strong> the parkland thesewoodland strips influence views from the houseand heighten the appearance <strong>of</strong> the landform justas the loch increases the depth <strong>of</strong> the landscape.Individual specimens and numerous clumps <strong>of</strong>deciduous trees are planted throughout theopen land within view <strong>of</strong> the main house and themovement <strong>of</strong> stock within this southern part <strong>of</strong>the <strong>estate</strong> was controlled by a ha-ha ditch whichran between Spittal Hill and Craigton. The entirethree hundred acre <strong>estate</strong> was enclosed by a highstone wall and the principal points <strong>of</strong> entry forvisitors were the east and west lodges where, uponentering, visitors were treated to a sequence <strong>of</strong>views intended to impress and delight before theprincipal focus, the Castle, was revealed. In 1799the Estate was sold to Sir Robert Abercromby whocompleted the “improvements” by relocating LogieKirk and Village.In 1889 the Estate was sold to Donald Graham,a Glasgow Merchant who had spent a great deal<strong>of</strong> time in India. He enlarged the Castle and,in accordance with Victorian fashion for plantcollections, introduced many exotic and nonindigenousspecies which contrasted with theplainer style <strong>of</strong> the classical <strong>estate</strong> planting <strong>of</strong> theprevious century. Most <strong>of</strong> these plantings werecarried out in the woodland to the north andeast <strong>of</strong> the Castle and at the water’s edge; it is <strong>of</strong>such an extent and quality as to selectively enrichthe original woodland structure <strong>of</strong> the <strong>estate</strong>.Photographic illustrations in the 1968/69 <strong>University</strong>Prospectus suggest that the overall landscapestructure did not change significantly until the<strong>University</strong> development commenced in 1967.There are two ancient standing stones and aVictorian way marking stone on the site. Thestanding stone located to the east <strong>of</strong> the PathfootBuilding is on the site <strong>of</strong> an old village calledPathfoot where a regular cattle market took place52


appendicesbut the village ceased to exist in the late 18thcentury. The second stone is situated adjacentto the sports pitches east <strong>of</strong> Airthrey Castle. It isalleged to mark the site <strong>of</strong> a battle in 839 betweenthe Picts and the Scots under Kenneth McAlpinebut it has also been suggested that it marks thesite <strong>of</strong> a bronze age settlement. The Victorian waymarker stone is located adjacent to the golf courseeast <strong>of</strong> the Castle and marks the distance to nearbytowns in three directions. Other historic remains oncampus include the ruins <strong>of</strong> the Hermitage withinHermitage Wood, an Ice House close to AirthreyCottage and the old East Lodge on the roadleading to Alexander Court.<strong>University</strong> campusThe transformation <strong>of</strong> an <strong>estate</strong> landscapefocused on a single building to a multi centred<strong>University</strong> development complex has beenachieved with great skill and clarity and owesmuch <strong>of</strong> its success to establishing a contemporaryrelationship between buildings and landscapewhich was exemplified in the original layout forthe <strong>University</strong> campus. Teaching and residentialbuildings are focused around Airthrey Loch tocreate a direct relationship between buildingsand water. Although the west lodge and driveno longer exist, a pleasant avenue and view <strong>of</strong>fine buildings over water impresses visitors asthey enter the campus in much the style as theoriginal layout two centuries earlier. The layout <strong>of</strong>residential blocks is designed to provide studentswith the same fine views and southerly aspect asmight have been enjoyed by the earlier residents<strong>of</strong> Airthrey Castle. Functional elements such as theboiler house and maintenance buildings are hiddenin woodland, and new woodland plantings havebeen carried out; mainly to adjust the shape <strong>of</strong>the original woodlands to suit the new spaces anduses which were being developed within the site.Other short-term, ornamental planting <strong>of</strong> shrubsand decorative tree species has been carried outas part <strong>of</strong> building developments, and the wholemaintained to a very high standard by <strong>University</strong>grounds staff.Since the end <strong>of</strong> the initial phase <strong>of</strong> buildingin 1973, the main changes in the appearance<strong>of</strong> the landscape have been in the introduction<strong>of</strong> separate buildings <strong>of</strong> individual design andmaterials outwith the core area - the Gannochysports complex, the Innovation Park, <strong>Stirling</strong>Management Centre and residences at SpittalHill and Alexander Court. The growth in demandfor car parking and the limited capacity <strong>of</strong> theoriginal road system have had an influence on thequality <strong>of</strong> external spaces surrounding buildingsand the overall appearance <strong>of</strong> the campus. It hasbeen increasingly necessary to order and manageparking spaces in such a way as to preventunnecessary intrusion into the central amenity <strong>of</strong>the campus. Short-term shrub and tree plantingwhich was carried out as part <strong>of</strong> the initial buildingdevelopment has now matured and a programme<strong>of</strong> modification and replacement which willmaintain a pleasant, ordered and safe environmenthas been undertaken. A programme <strong>of</strong> specimengroup tree planting has also been completed inorder to maintain succession for the now maturedeciduous clumps <strong>of</strong> the original <strong>estate</strong>.53


appendicesAppendix 2Campus Habitat Map410158581214952165317111375652183A ! !16!AA !! AA55AAA 5428 ! !!AA! AA!19!A ! !AA37!!! !!!! !30AA!!A33!! ! ! !44 48!! !47! ! ! ! ! !A! !! !! !! ! ! ! A! ! !A4357! ! 3427! ! ! !! !38! !! !!ASI!!!35!32A!!A2436A50!515949AA2046AAA45!40! SI!!!AAA!21A22ASI2539!42SI! SI ! ! !!! 41 !!!!!232631AAAA29KEY:Survey BoundaryTarget Notes! Scattered Broadleaved Trees! Scattered Coniferous TreesWallIntact Species-poor HedgeA A Amenity Grassland! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !! ! ! ! ! ! ! !Bare GroundBuildingsSemi-natural Broadleaved WoodlandIntroduced ShrubInundation VegetationMarshy GrasslandSIBroadleaved Plantation WoodlandConiferous Plantation WoodlandSIMixed Plantation WoodlandSIËË ËË ËË Ë ËËSISISIPoor Semi-improved GrasslandSemi-improved Neutral GrasslandË Ë ËScattered ScrubStanding WaterTall Ruderal Herbs.0 250MetresCLIENT: SIZE: TITLE:<strong>University</strong> <strong>of</strong> <strong>Stirling</strong> A3 Figure 1.2Extended Phase 1Habitat SurveyERMNorloch House36 King's Stables RoadEdinburgh, EH1 2EUTel: 0131 478 6000Fax: 0131 487 3636SOURCE: Reproduced from Ordnance Survey digital map data. © Crowncopyright, All rights reserved. <strong>2007</strong> License number 0100031673.PROJECTION: British National GridDATE: 08/11/<strong>2007</strong>DRAWN: JJHDRAWING:CHECKED: PWWAPPROVED:ADPROJECT: 0069274SCALE: 1:6,500REV:<strong>Stirling</strong>_Uni_Phase1.mxd 0File: 0069274<strong>Stirling</strong>UniPhase1\mxd\<strong>Stirling</strong>_Uni_Phase1.mxd54


appendicesAppendix 3Estate Performance MetricsTotal EstateCapital expenditure and valueInsurance replacement value per square metre GIACapital expenditure per square metre GIALinking property to the businessHEI Income per square metre NIATotal property costsTotal property costs + Capital expenditure perstudent FTEComponent revenue costsOperating costs per square metre NIAOperating costs per student FTEEnergy costs per square metre NIAWater/sewerage costs per square metre NIAMaintenance costs per square metre NIACleaning costs per square metre NIAAnalysis <strong>of</strong> MaintenanceRatio <strong>of</strong> Maintenance costs and Capex to IRVEnergy costs, consumption and emissionsEnergy costs per square metre GIAEnergy consumption kW/h per square metre GIAEnergy consumption kW/h per student FTEWater costs and consumptionWater/sewerage costs per square metre GIAWater consumption m³ per student FTEProperty management costsProperty management costs per square metre NIAFacilities costsFacilities costs per square metre NIANon Residential EstateSpace AllocationTeaching NIA as % Total NIAResearch NIA as % Total NIASupport NIA as % Total NIAOther NIA as % Total NIAVacant NIA as % Total NIACondition and suitabilityBuilding condition % GIA Condition A and BCost to upgrade condition C+D to B as % <strong>of</strong> IRVUtilisation ratiosTotal non-residential NIA per student FTECore teaching space per taught student FTEFrequency rate - teaching spaceOccupancy rate - teaching spaceUtilisation rate - teaching spaceTotal property costsTotal property costs per square metre NIATotal property costs per student headTotal property costs per student FTETotal property costs + Capital expenditure perstudent FTEComponent revenue costsNon residential operating costs per student FTEAnalysis <strong>of</strong> MaintenanceMaintenance costs and Capital exp per squaremetre GIAEnergy costs, consumption and emissionsEnergy costs per square metre GIAWater costs and consumptionWater/sewerage costs per square metre GIAResidential EstateTotal property costsTotal property costs per bedspaceComponent revenue costsOperating costs per square metre NIAEnergy costs per square metre NIAWater/sewerage costs per square metre NIAMaintenance costs per square metre NIAAnalysis <strong>of</strong> MaintenanceMaintenance costs and Capital exp per squaremetre GIAEnergy costs, consumption and emissionsEnergy consumption kW/h per square metre GIAWater costs and consumptionWater consumption m³ per square metre GIA55


appendicesAppendix 4Residential Strategy for <strong>Stirling</strong>BackgroundWhen the <strong>University</strong> was established in 1967<strong>Stirling</strong> did not have capacity within its existinghousing stock to support a large influx <strong>of</strong> studentsseeking accommodation in the private rentedsector, and as a result the <strong>University</strong> embarked ona major development <strong>of</strong> residential accommodationto house students who were being recruited tothe <strong>University</strong>.The main residential <strong>estate</strong> is located on the<strong>Stirling</strong> campus and was purpose-built for studentoccupancy between the late 1960s and themid 1970s. As a result <strong>of</strong> the growth in studentnumbers during the 1970s and 1980s furtheraccommodation was required. By the early 1990sthere was further expansion to the residentialportfolio with the addition <strong>of</strong> Alexander Court, anew build development on-campus providing 322bedrooms, and further developments <strong>of</strong>f-campuswith John Forty’s Court, Union Street and LyonCrescent providing an additional 738 bedrooms.On-campus accommodation currently provides1,965 bedrooms <strong>of</strong> varying standards ranging fromtraditional hall to cluster flats for 5–7 occupants.An additional 834 bedrooms are available <strong>of</strong>fcampusranging from 7 person ensuite flats,standard flats for 4–7 occupants and 5 personhouses. Off-campus residences are located within3 miles <strong>of</strong> the <strong>University</strong> campus and are purposebuiltstudent residences, some <strong>of</strong> which are ownedby the <strong>University</strong> and others leased from privatehousing providers. All accommodation is managedby the <strong>University</strong>.Current positionThe <strong>University</strong> provides a range <strong>of</strong> accommodation(totalling 2,799 bedrooms) available for studentoccupancy during semester and for mixed (studentand non-student) use during the summer months.The provision and management <strong>of</strong> studentaccommodation is considered to be a core part <strong>of</strong>the <strong>University</strong>’s business and generates an annualturnover <strong>of</strong> circa £7.1m. This is complemented byan income <strong>of</strong> circa £900k (financial year 06/07)from the use <strong>of</strong> the residences for non-studentpurposes. [This figure is the gross income obtainedfrom commercial business that is achievedas a direct result <strong>of</strong> having accommodationavailable to service conferences and holiday letrequirements]. The current portfolio <strong>of</strong> 2,799directly-managed bedrooms and includes a range<strong>of</strong> accommodation from standard study bedroomsin traditional halls <strong>of</strong> residences to ensuite studybedrooms and cluster flats for 5/7 occupants. Afull breakdown <strong>of</strong> accommodation provision andincome derived from student business is shownin Annex A. Student rental periods coincide withsemester dates and generally <strong>of</strong>fer students a 38week let, although postgraduate accommodation<strong>of</strong>fers students a 50 week let to meet theircourse requirements. Rental charges are formallyreviewed on an annual basis by the Rent ReviewGroup which is chaired by a lay member <strong>of</strong><strong>University</strong> Court and includes representativesfrom SUSA. This includes a market analysis toassess how the <strong>University</strong>’s charges compare withother universities and the local private rentedsector. This year’s market analysis concludedthat the <strong>University</strong>’s rents compare favourablywith other universities but are higher than thosein the private sector. However, <strong>University</strong> rentsare inclusive <strong>of</strong> utility bills, 24 hour conciergeservices, cleaning, linen provision etc. and whenthis is taken into consideration the charges arecomparable with rents in the private sector.Current statusThe <strong>University</strong> has invested £11.8m on refurbishingthe on-campus residential <strong>estate</strong> since 1994. Thescope <strong>of</strong> each project has varied depending onfunding availability and the need to maintain arange <strong>of</strong> accommodation options to ensure thatboth student needs and commercial aspirationsare met. Each project has included work to ensurecompliance with current legislative requirementssuch as HMO (Houses in Multiple Occupancy),and the extent <strong>of</strong> refurbishment has varied fromproject to project resulting in varying standardsand provision across the range <strong>of</strong> accommodation.Andrew Stewart Hall has benefited fromremodelling <strong>of</strong> existing space and now provides207 bedrooms with either ensuite or privatebathroom facilities, whilst other projects such asA K Davidson Hall were restricted to addressinglegislative compliance requirements with minimal56


appendicesrefurbishment. As highlighted in Section 10 <strong>of</strong> theEstate Strategy, the condition survey undertakenin 2006 estimated the total costs to restore theresidential <strong>estate</strong> to a sound condition complyingwith statutory requirements. This cost amountsto £15.9m over a ten year period but this madeno allowance for improvements in functionalsuitability to meet student demand and aspirations.The following table provides a summary <strong>of</strong> thework completed to date and the residenceswhere further work is required as only partialrefurbishment was carried out.Table 1: Summary <strong>of</strong> refurbishment work undertaken as at October <strong>2007</strong>PropertyOriginalType <strong>of</strong>Refurbishment Year No. <strong>of</strong>RoomsFinalNo. <strong>of</strong>RoomsTotal Cost(incl Fees &VAT)Cost perBedroom(Refurb)Extent <strong>of</strong> WorksPolwarthHouseMuirheadHouseAndrewStewartHall (ASH)East WingA KDavidsonHallDonnellyHouseFraser <strong>of</strong>AllanderHouseAndrewStewartHall (ASH)WestWingMajor (Flats) 1994 117 102 £1,070,000 £10,490 Window replacement;some services renewal;reorganisation <strong>of</strong> space;furniture.Major (Flats) 1998 156 130 £1,455,000 £11,192 Complete servicesrenewal except heatingdistribution pipework;windows retained;reorganisation <strong>of</strong> space;furniture.Major Ensuite(Halls)Minimum(Halls)MinimumEnhanced(Halls)1999 148 103 £1,512,000 £14,680 Complete servicesrenewal except heatingdistribution pipework;windows retained; majorreorganisation <strong>of</strong> space;furniture.2000 304 289 £1,580,000 £5,467 Minimal services renewalincl. water services inwest wing; windowsretained; reorganisation<strong>of</strong> space; furniture.2001 150 126 £912,000 £7,238 Minimal services renewalalthough water servicesreplaced throughout;windows retained;reorganisation <strong>of</strong> space;furniture.Major (Flats) 2004 187 162 £2,255,000 £13,920 Complete servicesrenewal except heatingdistribution pipework& radiators; windowsreplaced; reorganisation<strong>of</strong> space; furniture.Major Ensuite(Halls)<strong>2007</strong> 138 104 £3,083,000 £29,644 Complete servicesrenewal except heatingdistribution pipework;ro<strong>of</strong>ing; windowsreplaced; majorreorganisation <strong>of</strong> space;furniture.57


appendicesCurrent requirementsAlthough much work has already been undertakenthere are a number <strong>of</strong> outstanding projects thatmust proceed to ensure compliance with currentlegislative requirements and to protect the longtermfuture <strong>of</strong> the residential <strong>estate</strong>. In particular,Murray Hall and Geddes Court, have had no majorrefurbishment work carried out since they werebuilt and do not comply with HMO regulations,and therefore mandatory work must be carriedout to allow us to continue to use these premises.In the interim, <strong>Stirling</strong> Council has agreed to relaxlicensing requirements to enable the <strong>University</strong>to continue to use these residences on theunderstanding that refurbishment goes aheadwhich includes all <strong>of</strong> the work required to ensurefull compliance. Failure to undertake this work ina reasonable timescale could result in the Councilenforcing a closing order on these premises withconsequent business and reputational implications.There is also a legacy from some earlierrefurbishment projects where significant elementswere omitted e.g. replacement <strong>of</strong> windows, servicerenewals etc. and it will be necessary to carry outfurther work to these residences to ensure theirlong-term sustainability.This is also an opportunity to consider the range<strong>of</strong> accommodation provided and to remodelthe existing residential <strong>estate</strong> to meet customerexpectations and demands. In particular, thedemand for ensuite accommodation typicallyexceeds supply by 100% for student occupancyand from a commercial point <strong>of</strong> view increasedensuite provision would both sustain existingconference business and enhance the opportunitiesfor attracting new business. As a result it isproposed that any refurbishment in Geddes Courtshould include conversion to ensuite/privatefacilities accommodation. It is proposed thatMurray Hall should be refurbished and remodelledto ensure compliance with legislative requirementsbut that the rooms should remain as standard. Ifthe projects go ahead on this basis there will be anoverall loss <strong>of</strong> 88 bedrooms (Geddes Court capacitywould reduce from 209 standard bedrooms to150 ensuite or private facility bedrooms andMurray Hall capacity would reduce from 279standard bedrooms to 250 standard bedroomsas a result <strong>of</strong> work to kitchens. A schedule <strong>of</strong>suggested works required with appropriate costsis included in Annex B and this forms the basis forthe revised Capital Development Plan. A useablelifespan following refurbishment <strong>of</strong> 25 years canbe expected. This would mean that further workto those residences that have been refurbishedwould be needed from 2019 onwards. Ongoingminor refurbishment and cyclical maintenance willcontinue to be funded from the revenue budget.Student demandThe allocations policy is updated annually,information gathered from Recruitment andAdmissions and the Deputy Secretary’s Office beingused to determine the number <strong>of</strong> accommodationplaces that are required to meet accommodationguarantees for priority groups such as new firstyear undergraduates, visitor/exchange students,sports bursars, International Study Centre etc.This information is used to determine the number<strong>of</strong> places which are available for allocation toreturning undergraduates. Student demand foraccommodation generally exceeds supply andas a result students who are unsuccessful inacquiring <strong>University</strong> accommodation tend to be2nd and 3rd year undergraduates. In any yearwhen a refurbishment takes place there is normallya substantial shortage <strong>of</strong> accommodation andstudents invariably have to secure accommodationin the private rented sector. This also appearsto have a knock-on effect in the year followingrefurbishment when there is a drop in the number<strong>of</strong> applications for <strong>University</strong> accommodation. Thenumber <strong>of</strong> applications received from returningand new undergraduate since 2001 is summarisedin Table 2 overleaf.58


appendicesTable 2: Summary <strong>of</strong> undergraduate accommodation availability, applications and surplus/deficitby yearSessionNumber <strong>of</strong>BedspacesReservedNumber OfApplicationsReceivedSurplus/Deficit2001/02 2363 2534 -1712002/03 2355 2601 -246Comments2003/04 2226 2449 -373 Fraser <strong>of</strong> Allander removed from stockfor refurbishment2004/05 2483 2502 -192005/06 2423 2618 -1952006/07 2272 2796 -524 Andrew Stewart Hall West Wingremoved from stock for refurbishment<strong>2007</strong>/08 2492 2343 149Whilst this table provides an indication <strong>of</strong> demandfor <strong>University</strong> accommodation, it is important torecognise that applications do not always turn in tobookings and over recent years (with the exception<strong>of</strong> <strong>2007</strong>/08) supply has generally matched demand.On occasions when there has been a shortage <strong>of</strong>accommodation twin rooms have been used ona double occupancy basis at the start <strong>of</strong> semesteruntil rooms have been released for re-allocation.Further analysis <strong>of</strong> application informationindicates that there is a clear student preferencefor accommodation located on campus whilstthe demand for <strong>of</strong>f-campus accommodationis reducing year on year and has beenundersubscribed for the last five years. The number<strong>of</strong> applications received for on and <strong>of</strong>f-campusaccommodation by year is summarised in Table 3below.Table 3: Number <strong>of</strong> first choice applications received by year from returning undergraduates for onand <strong>of</strong>f campus accommodation and overall surplus/deficitOn CampusReturning Undergraduates’ 1st choice accommodation preferencesNumber <strong>of</strong> 1st ChoiceApplicationsPlaces AvailableSurplus/DeficitSession 2003/04 1160 717 -443Session 2004/05 1059 938 -121Session 2005/06 1166 921 -245Session 2006/07 1298 751 -547Session <strong>2007</strong>/08 906 844 -62Off CampusSession 2003/04 452 473 21Session 2004/05 397 473 76Session 2005/06 343 486 143Session 2006/07 424 486 62Session <strong>2007</strong>/08 358 486 12859


appendicesThe situation in <strong>2007</strong>/08 was slightly differentand for the first time in many years was asignificant void. This appears to be as a result<strong>of</strong> a combination <strong>of</strong> factors including: failure toachieve the recruitment targets for students groupswhich have accommodation guarantees; lack <strong>of</strong>demand from returning undergraduates and aknock-on effect from withdrawal <strong>of</strong> on-campusaccommodation because <strong>of</strong> refurbishment activityduring 2006/07. It is proposed that the broaderissue <strong>of</strong> accommodation guarantees and theirvalue as a marketing tool should be reviewed afterthe 2008/09 intake.Student opinionVarious surveys have been carried out over recentmonths including the Accommodation Survey<strong>of</strong> Returning Students, the International StudentBarometer Survey and the Student CompletionSurvey. The Student Completion Survey is an annualexit survey <strong>of</strong> <strong>Stirling</strong> graduates and has been carriedout since 2004/05. The table below shows theannual percentage <strong>of</strong> students who either agreedor strongly agreed with the statement that “I amsatisfied with my experience <strong>of</strong>”:Table 4: Student Completion Survey ResultsI am satisfied with myexperience <strong>of</strong><strong>University</strong>-wide2004/05<strong>University</strong>-wide2005/06<strong>University</strong>-wide2006/07Learning and teaching facilities 85.5% 81.2% 88.1%Accommodation 64% 72.1% 68.7%Catering 66.3% 71.6% 76.8%General campus facilities 82% 93% 73.4%Whilst satisfaction with accommodation provisionranges from 64%–72.1% over the three years,it is important to recognise that the quality <strong>of</strong>student accommodation is a key element <strong>of</strong> theoverall student experience. The key messagesfrom recent surveys identify a clear studentpreference for:»» On-campus accommodation as opposed to <strong>of</strong>fcampus<strong>University</strong> accommodation»» Network provision in all rooms»» An improvement in standard <strong>of</strong> accommodationprovided, particularly in residences that have yetto benefit from refurbishment»» Lower rent chargesViews from the <strong>Stirling</strong> <strong>University</strong> StudentAssociation (SUSA)At a meeting on 20 November <strong>2007</strong>, the SUSACouncil passed a policy which fully endorsedthe work undertaken by Residential Servicesand commended the consistently high quality <strong>of</strong><strong>University</strong> accommodation on <strong>of</strong>fer at <strong>Stirling</strong>.Chris Baxter (Vice President – Welfare & Education)said that ‘It is the view <strong>of</strong> SUSA that <strong>University</strong>accommodation is <strong>of</strong>ten preferable as it <strong>of</strong>fers acheaper, more secure service than many privateaccommodation providers in the local area. SUSAbelieves that choice is essential and where studentsopt to rent in the private sector, it is vital thatthey have access to informed advice and supportthrough the <strong>University</strong>. SUSA aims to provide this,to a limited extent, through our own structuresbut having expert advice on <strong>of</strong>fer through RS isinvaluable and SUSA is keen to see this serviceexpanded. SUSA is, as always, eager to work withour colleagues in Residential Services to ensurethat the service maintains its high standards andto prevent the introduction <strong>of</strong> private studentaccommodation providers into <strong>Stirling</strong>’.Non-student opportunitiesThe <strong>University</strong>’s Commercial Operations teamviews the ongoing development and upgrading <strong>of</strong>residential facilities as one <strong>of</strong> the key contributorsto the future growth <strong>of</strong> revenues from non-studentuse. The doubling <strong>of</strong> ensuite provision on campus,as a result <strong>of</strong> the refurbishment <strong>of</strong> ASH WestWing, has been most welcome. <strong>Stirling</strong>, however,remains at a distinct disadvantage, with respectto its ensuite provision, when compared with anumber <strong>of</strong> its Scottish and UK competitors withinthe academic venue sector. With just over 200ensuite rooms available on-campus, there is clearlya limit to the size <strong>of</strong> conference which can be60


appendicesattracted where ensuite provision is required. Therelatively limited number <strong>of</strong> ensuite rooms currentlyavailable restricts the amount <strong>of</strong> new conferencebusiness that can be attracted. It is considered thatit would require at least a doubling <strong>of</strong> the currentprovision (from 200 to 400 ensuite rooms) to allowthe growth <strong>of</strong> new conference business whilstretaining the existing levels <strong>of</strong> repeat business.It should be noted that not all markets demandensuite accommodation. The increasingly lucrativeGroup Travel sector demands self-cateringaccommodation, furnished and equipped to areasonably high level, but not necessarily withensuite bedrooms. With this in mind the mostappropriate approach would involve investmentin additional ensuite capacity in Halls <strong>of</strong> Residenceand upgrading and refurbishment <strong>of</strong> the<strong>University</strong>’s stock <strong>of</strong> flats, apartments and chalets.Future provision – options appraisalIn order to arrive at a <strong>strategy</strong> for the provision <strong>of</strong>accommodation in the future, a number <strong>of</strong> optionswere appraised together with their consequences.The following six options were considered:1. Maintain the current portfolio without furthercapital investment (do nothing).2. Maintain current portfolio and invest to ensurecompliance with legislation only.3. Maintain current portfolio and invest toupgrade provision, retaining existing spatialarrangements.4. Maintain current portfolio and invest toupgrade provision to meet student andcommercial aspirations.5. Change scope and size <strong>of</strong> existing <strong>estate</strong>.6. Consider transfer <strong>of</strong> all or some accommodationto a third party provider.The following tables summarise the advantages anddisadvantages associated with each <strong>of</strong> the options.Annex C provides the net cost <strong>of</strong> each option.Option 1: Maintain the current portfolio without further capital investment (do nothing)AdvantagesNo capital outlay requiredCan continue to operate and utilise many <strong>of</strong>the existing residences in the short-termDisadvantagesFailure to comply with legislative requirements whichcould lead to enforced closure <strong>of</strong> some residencesDetrimental to student experienceDamage to reputation due to poor standards <strong>of</strong>accommodationLoss <strong>of</strong> student and commercial business (existing andnew)Possible implications for the recruitment <strong>of</strong> new studentsdue to lack <strong>of</strong> ensuite facilities and poor standard <strong>of</strong>some accommodationNo improvement in environmental performanceLikely to lead to an increased spend on reactivemaintenanceAdds to the maintenance backlog for the futureOption 2: Maintain current portfolio and invest to ensure compliance with legislationAdvantagesCompliance with legislative requirementsContinued use <strong>of</strong> all residencesDisadvantagesDetrimental to student experienceDamage to reputation due to poor standard <strong>of</strong>accommodationLoss <strong>of</strong> student and commercial business (existing andnew)Possible recruitment implications due to lack <strong>of</strong> ensuitefacilities and poor standard <strong>of</strong> some accommodationNo improvement in environmental performanceAdds to the maintenance backlog for the future61


appendicesOption 3: Maintain current portfolio and invest to upgrade provision, retaining existing spatialarrangements i.e. no additional ensuite or private facilitiesAdvantagesCompliance with legislative requirementsContinued use <strong>of</strong> all residencesMore rooms retained for lettingEnhance student experienceSafeguards reputationImprove environmental performanceExtends long-term life <strong>of</strong> the residential <strong>estate</strong>DisadvantagesLimited ability to increase rental income due to standard<strong>of</strong> facilities providedFailure to meet demand for certain types <strong>of</strong>accommodation for student and commercial business(existing and new), which could potentially result in loss<strong>of</strong> businessCould impact on ability to recruit new students due tolack <strong>of</strong> ensuite accommodationOption 4: Maintain current portfolio and invest to upgrade provision to meet student andcommercial aspirations including remodelling to increase ensuite and private facilitiesAdvantagesCompliance with legislative requirementsEnhance student experienceContributes to reputationImprove environmental performanceExtends long-term life <strong>of</strong> the residential <strong>estate</strong>Assists recruitment <strong>of</strong> new students byproviding range <strong>of</strong> accommodation optionsAbility to meet demand for certain types <strong>of</strong>accommodation for student occupancyPotential increase in commercial businessdue to ability to provide suitable range andquantity <strong>of</strong> accommodationOption 5: Change scope and shape <strong>of</strong> existing <strong>estate</strong>DisadvantagesLoss <strong>of</strong> capacity - approximately 90 rooms on campus asa result <strong>of</strong> remodellingA: Upgrade existing portfolio by refurbishing and remodelling the existing residences to increaseensuite and private facilities provision on campus, dispose <strong>of</strong> John Forty’s Court for non-studentbusiness use 5 , new build at Alexander CourtAdvantagesDisadvantagesCompliance with legislative requirementsSale <strong>of</strong> JFC generates significant capital receiptto be used to contribute towards the cost<strong>of</strong> refurbishment / remodelling projects oncampusEnhance student experienceContributes to reputationImprove environmental performanceAssist recruitment <strong>of</strong> new students byproviding range <strong>of</strong> accommodation optionsAbility to meet demand for certain types <strong>of</strong>accommodation for student occupancyPotential increase in commercial businessProvides more bedrooms on campus, whichis the most popular location for students andcommercial customersAvoids future refurbishment costs for JFCCapital funding required for major new buildDisruption on campus while development is underwayOnce and for all decision to sell JFCOverall loss <strong>of</strong> capacity <strong>of</strong> approximately 280 rooms [287rooms lost as a result <strong>of</strong> sale <strong>of</strong> JFC plus approximately90 rooms as a result <strong>of</strong> remodelling on campus. To be<strong>of</strong>fset in-part by new build at Alexander Court providingapproximately 100 rooms]Students forced into private housing market5A sale value <strong>of</strong> £8m has been assumed for JFC (Annex C)62


appendicesB: Upgrade existing portfolio by refurbishing and remodelling the existing residences to increaseensuite and private facilities provision on campus, dispose <strong>of</strong> John Forty’s Court probably for nonstudentbusiness use, put in place a nominations agreement with a private provider if it is feltnecessary to address loss <strong>of</strong> capacityAdvantagesDisadvantagesCompliance with legislative requirementsProvides significant capital receipt which canbe used to fund refurbishment / remodellingprojects on campusReduces number <strong>of</strong> <strong>University</strong> managedbedspaces <strong>of</strong>f campus, which is the leastpopular location for students and commercialcustomersEnhances student experienceContributes to reputationImprove environmental performanceAssist recruitment <strong>of</strong> new students byproviding range <strong>of</strong> accommodation optionsAbility to meet demand for certain types <strong>of</strong>accommodation for student occupancyPotential increase in commercial businessAvoids future refurbishment costs for JFCMaintains link with the CityOverall loss <strong>of</strong> capacity <strong>of</strong> approximately 280 <strong>University</strong>owned rooms for student and commercial business.[287 rooms lost as a result <strong>of</strong> sale <strong>of</strong> JFC, 90 roomslost as a result <strong>of</strong> remodelling on-campus. This couldbe <strong>of</strong>fset by entering a nominations agreement with aprivate providerLoss <strong>of</strong> John Forty’s Court including 105 ensuite roomswhich are used for commercial businessPotential for competition with the private sector forstudent and commercial businessCost <strong>of</strong> putting Nominations agreement in placeStaffing issuesOnce and for all decisionOPTION 6: Consider transferral <strong>of</strong> all or some accommodation to a third party providerConsider giving up all on and <strong>of</strong>f campus accommodation and entering into an arrangement with athird party provider <strong>of</strong> student housingAdvantagesProvides capital receipt from stock transferRetains long-term ownership <strong>of</strong> buildings andgroundsNo capital outlay requiredProvides new purpose-built or refurbishedaccommodationMaintains capacityOpportunity to influence standards <strong>of</strong>accommodation providedTransfer <strong>of</strong> <strong>of</strong>f-campus accommodationcould fund refurbishment <strong>of</strong> on-campusaccommodationDisadvantagesOne <strong>of</strong>f benefitLoss <strong>of</strong> controlMinimum contract period <strong>of</strong> 30 yearsCost <strong>of</strong> terminating existing lease agreementsSignificant set-up costsRisk to reputationRisk over ownership/brandingRisk to welfare and pastoral care provisionHigher living costs for studentsRisk <strong>of</strong> failure to maintain occupancy levelsPotential impact on commercial businessReliance on third party providerPossible difficulty apportioning costsAsset likely to need investment on returnSignificant <strong>University</strong> resource to establish and manage63


appendicesTrading position <strong>of</strong> residencesResidential Services is regarded as a trading area.When taken as a whole student use generates anoperating surplus. However, certain residencesgenerate a small deficit – generally when rentincreases have been suppressed in order to providea range <strong>of</strong> affordable accommodation or whenloan payments are still being made.bed occupancy only associated with commercialbusiness). The expenditure is expected to be£821k, meaning an overall deficit <strong>of</strong> £40k. Annualdepreciation charges <strong>of</strong> £146k decrease to £63k in2010 which would return the operation to surplus.The financial performance over the years issummarised in the table below:It is projected that John Forty’s Court will generateincome <strong>of</strong> £779k in <strong>2007</strong>/08 (including £76k fromTable 5: Income generation from residential accommodationFinancial year Income from Student Use Income from Non-Student use 62002/03 5,7852003/04 5,5582004/05 6,1422005/06 6,497 13312006/07 6,795 909<strong>2007</strong>/08 (forecast) 7,070 9836These figures represent the value <strong>of</strong> the commercial business that had a residential requirement64


appendicesANNEX A: ACCOMMODATION SUMMARYProperty Owner LocationType <strong>of</strong>AccommodationStudentOccupancyTypeRoom TypeHMOCompliantRefurbishmentStatusNetworkInstallationNumber <strong>of</strong>BedspacesA K Davidson <strong>University</strong> On Campus Traditional Hall 1st year Undergraduates Standard Study Bedroom Yes Minimum - 2000 Yes - June 2005 277 2,470Geddes Court <strong>University</strong> On Campus Traditional Hall 1st year Undergraduates Basic Study Bedroom No No Yes - June 2002 & 209 2,242June 2003Murray Hall <strong>University</strong> On Campus Traditional Hall 1st year Undergraduates Basic Study Bedroom No No Yes - 2002 279 2,242Andrew Stewart Hall <strong>University</strong> On Campus Traditional Hall 1st year Undergraduates Ensuite Study Bedroom Yes Major - East Wing1999, West Wing <strong>2007</strong>AnnualRentalCharge<strong>2007</strong>/08Yes - June <strong>2007</strong> 207 3,131AnnualRentalIncome684,190468,578625,518648,117Muirhead House <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes Major - 1998 No 115 2,489286,235Muirhead (Ensuite) <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Ensuite Study Bedroom Yes Major - 1998 No 5 3,13115,655Polwarth House <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes Major - 1994 Yes - June 2004 99 2,489246,411Fraser or Allander <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes Major - 2004 Yes - June 2004 163 2,521410,923Donnelly House <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes Minimum enhanced Yes - June 2004 124 2,489- 2001308,636Pendreich Way <strong>University</strong> On Campus Chalets Returning Undergraduates Standard Study Bedroom Yes No No 50 2,576128,800Spittal Hill <strong>University</strong> On Campus Chalets Returning Undergraduates Standard Study Bedroom Yes No No 115 2,576296,240Friarscr<strong>of</strong>t <strong>University</strong> On Campus House Postgraduates Standard Study Bedroom Yes No No 11 3,30536,355Alangrange <strong>University</strong> Off Campus House Postgraduates Standard Study Bedroom Yes Minimum - 2005 & Yes - June 2006 44 3,3052006145,420Union St (B<strong>of</strong>A) <strong>University</strong> Off Campus Flat Postgraduates Standard Study Bedroom Yes No No 3 2,5887,764John Forty’s Court <strong>University</strong> Off Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes No Yes - June 2006 182 2,242408,044John Forty’s Court <strong>University</strong> Off Campus Cluster Flats Postgraduates Ensuite Study Bedroom Yes No Yes - June 2003 105 2,812295,260Alexander Court <strong>University</strong> On Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes No Yes - June 2004 322 2,521Bk D, June 2005811,762Bk A & C, June2006 Bk BLyon Crescent Leased Off Campus Houses Postgraduates Standard Study Bedroom Yes N/A No 185 3,176587,560Union Street Development Leased Off Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes N/A No 266 2,242596,372Thistle Chambers Leased Off Campus Cluster Flats Returning Undergraduates Standard Study Bedroom Yes ? No 38 2,39891,124Totals 2799 7,098,96465


appendicesANNEX B: SCHEDULE OF REFURBISHMENT STILL TO BE UNDERTAKENRefurbWindowReplacementCosts based on 3rd Quarter <strong>2007</strong> and based on original bedroom numbersExt. GlassPanelsRo<strong>of</strong>CoveringsElectricalInstallationsPlumbingInstallationsHeatingInstallationsVentilationInstallationsMurray Hall (non ensuite) 19,000 5,548,000 09/10Geddes Court (ensuite) 26,300 6,312,000 10/11Muirhead House - 2,425 485 755 - - - - 458,125 13-17Andrew Stewart Hall East Wing - 2,425 485 755 - - - - 377,495 13-17A K Davidson Hall - 2,425 485 755 2,530 6,040 2,660 700 4,506,955 11/12Donnelly House - 2,425 485 755 2,530 6,040 2,660 700 1,964,970 13-17Polwarth House - - - 755 2,530 6,040 2,660 700 1,369,980 12/13Total20,537,525Capital Receipt -Total Cost 20,537,525Notes:Assumed Geddes Court becomes ensuite and Murray Hall retained as standardAll costs include allowance for PreliminariesAll costs include V.A.T. @ 17.5%All costs include fees @ 12.5%To increase costs to 2nd Quarter 2008 add 4.55%To increase costs to 2nd Quarter 2009 add 11.15%No allowance Included for re-decoration works other than Murray & GeddesPlumbing costs based on ensuite layoutsYear67


appendicesANNEX C: SUMMARY OF COSTSResidential accommodation - Option AppraisalOption 1 - Do Nothing -Option 2 - Maintain Current Portfolio and Ensure Compliance with Legislation only 1,596,000Option 3 - Maintain Current Portfolio and Upgrade Retaining Existing Layouts 18,785,525Option 4 - Maintain Current Portfolio and Upgrade to meet Student Aspirations 20,537,525Option 5a - Change Shape <strong>of</strong> Existing Portfolio including Disposal <strong>of</strong> JFC & New Build 15,937,525Option 5b - Change Shape <strong>of</strong> Existing Portfolio including Disposal <strong>of</strong> JFC & Nom.Agreement12,537,525Option 6 - Consider Transfer <strong>of</strong> All or Some Accommodation to a Third Party Provider -69


3 0 m Dia sewer200 m Diasewerscour valvescour valveSepticTankinspchmbr100mm OSepticTankSepticTankappendicesAppendix 5Revised Campus Development Plan7.134.04<strong>University</strong> <strong>of</strong> <strong>Stirling</strong>ESTATE STRATEGY <strong>2007</strong> – <strong>2017</strong>APPENDIX 5 - REVISED CAMPUS DEVELOPMENT PLAN1.01150 dia sewer150 dia sewer7.01300 dia sewer1.01380 dia sewer380mm Dia sewer2.01380mm Dia sewer380mm Dia sewer380mm Dia sewer4.02300mm Dia sewer1.051.044.037.02300mm Dia sewer1.03300mm Dia sewer7.081.024.056.041.125.014.017.121.0 ACADEMIC SPACE1.01 Pathfoot - extensions to A and G corridors; new corridor below Acorridor1.02 Andrew Miller Building – new building on peninsula site1.03 Andrew Miller Building – expansion <strong>of</strong> existing building1.04 Andrew Miller Building – extension or freestanding new build1.05 Andrew Miller Building – redevelopment <strong>of</strong> atrium and studies area1.06 Cottrell Building – additional storey to A corridor1.07 Cottrell Building – building extension to link to Logie Lecture theatre1.08 Cottrell Building – inll block to link A block to R G Bomont1.09 Cottrell Building – inll building to link B block to R G Bomont1.10 Cottrell Building – building to link with escape stair at east end <strong>of</strong> Bcorridor1.11 Colin Bell Building – inll to complete south wing1.12 Airthrey Castle – development on site <strong>of</strong> annex1.13 Wallaceview – potential campus expansion1.14 Lochside – development site2.0 SPORTS FACILITIES2.01 Gannochy – replacement and expansion2.02 Potential site for Indoor sports arena3.0 STIRLING UNIVERSITY MANAGEMENT CENTRE3.01 Future expansion <strong>of</strong> <strong>Stirling</strong> Management Centre4.0 RESIDENTIAL4.01 Block 5 Alexander Court4.02 Student residential development on Andrew Stewart Hall car park4.03 Residential redevelopment on site <strong>of</strong> lock-up garages4.04 Ivy and Garden Cottages and grounds future residential development4.05 Airthrey Cottage and grounds future residential development5.0 MISCELLANEOUS24'' H.P.WATER MAINAV2.0268.0m450mm Dia sewer380mm Dia sewer7.067.047.031.076.017.09 3.017.051.031.066.031.081.091.101.111.146.027.107.107.111.1324'' H.P. WATER MAIN24''H.P.WATER MAIN5.01 Development on site <strong>of</strong> gardens and grounds area5.02 Development on site <strong>of</strong> Friars Cr<strong>of</strong>t6.0 ROADS, FOOTPATHS AND INFRASTRUCTURE6.01 Potential site for Bus station6.02 Road and footpath connections to Wallaceview6.03 Pedestrian link from east buildings to MacRobert Centre6.04 Bridge link between Wallaceview and peninsula7.0 LANDSCAPE7.01 Pathfoot courtyards upgrade7.02 External space for development <strong>of</strong> 1.05 above7.03 Cottrell courtyards upgrade7.04 Cottrell car park landscape upgrade7.05 East car parks frontage landscape7.06 Queen’s Court refurbishment7.07 Spittal Hill woodland management7.08 Peninsula - new parkland7.09 Management Centre courtyard7.10 Wallaceview woodland management7.11 Wallaceview new woodland7.12 East Campus woodland management7.13 Hermitage wood management planOverhead power line450mm Dia sewer450 m Dia sewer450 m Dia sewer7.07STIRLING UNIVERSITYINNOVATION PARKSUIP POTENTIALEXPANSIONHigh pressure water mainMain foul sewerLoch overowRecently completed developmentFuture development5.02green space / landscape developmentRev. C (28.11.07) Hermitage wood management plan addedRev. B (04.11.07) Key notes amended. Friarscr<strong>of</strong>t added to planRev. A - Development sites re-numberedNORTHUNIVERSITY OF STIRLINGESTATE STRATEGY <strong>2007</strong> -<strong>2017</strong>REVISED CAMPUS DEVELOPMENT PLANAUGUST <strong>2007</strong>JOB NO 1620DWG NO 1620/01SCALE: 1: 2000 @ A0IAN WHITE ASSOCIATESLANDSCAPE ARCHITECTS AND PLANNERS3A FORREST ROAD STIRLING FK8 1UH TEL 01786 446446 FAX 01786 446441 E-MAIL mail@iwastirling.co.uk71


appendicesAppendix 6Capital Plan to 2016/17<strong>University</strong> <strong>of</strong> <strong>Stirling</strong>Extended Capital Development Plan to 2016/17Prioritised List with Deferred ProjectsPRIOR YEARS 06/07 CURRENT AND CURRENT FUTURE AND YEARS FUTURE YEARSOverall Risk / Comb. Planned Expenditure Expenditure Total Planned Planned Planned Planned Planned Planned Planned Planned 07/08 toCDP Criteria Object. Score Project to Year ended Spend to Budget Budget Budget Budget Budget Budget Budget Budget 16/17 PlannedApproval Score Score Cost 31/07/2005 31/07/2006 31/07/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13-17 BudgetNumber CDP Title £000's £000's £000's £000's £000's £000's £000's £000's £000's £000's £000's £000's £000's101 Cottrell Fascia Panels 76 15 91 5,500 155 566 721 2,146 2,483 150 0 0 0 0 0 2,633102 Residences Major Refurbishment Programme 68 15 83 23,638 0 0 0 2,570 413 316 5,348 6,312 4,507 1,370 2,802 21,068100 Teaching Room and Lecture Theatre Improvements (Refurb and Equip) 59 20 79 5,035 247 802 1,049 1,306 371 400 259 250 250 250 900 2,680103 Library Refurbishment 60 15 75 13,500 43 12 55 81 400 1,820 10,967 178 0 0 0 13,365104 Condition survey incl backlog maintenance 59 15 74 26,450 0 29 29 124 792 1,000 1,000 1,500 2,500 3,000 16,505 26,297154 Sports Studies Centre for Sporting Excellence 55 15 70 15,000 0 0 0 0 0 1,050 13,000 950 0 0 0 15,000111 Major Refurbishment <strong>of</strong> Sub Stations and HV Cabling 57 13 70 1,894 846 215 1,061 117 107 159 450 0 0 0 0 716105 DDA Work 52 15 67 375 5 0 5 31 93 140 0 105 0 0 0 338136 DDA funded projects (shefc) 52 15 67 360 247 28 275 43 43 0 0 0 0 0 0 43106 Computing Lab Upgrading and Reconfiguration 51 15 66 2,069 96 263 359 343 205 192 193 108 136 118 415 1,367152 IoE Primary Initial Teacher Education Programme 49 15 64 100 0 0 0 0 0 100 0 0 0 0 0 100107 Legislative Compliance - Residential incl HMO and Fire Alarms 47 15 62 575 0 0 0 130 146 152 147 0 0 0 0 445108 Legislative Compliance - Non Residential incl Fire Alarms 47 15 62 200 5 0 5 20 94 80 0 0 0 0 0 174139 Postgraduate Teaching and Research Facilities 47 15 62 586 291 284 575 0 12 0 0 0 0 0 0 12112 Energy Measures incl Upgrades <strong>of</strong> BMS 49 13 62 360 30 24 54 23 103 100 50 30 0 0 0 283113 IS Projects Server Replacement 49 13 62 4,056 207 220 427 392 424 167 430 300 208 208 1,500 3,237126 Creation <strong>of</strong> Security Control Room 54 8 62 100 0 0 0 0 15 85 0 0 0 0 0 100114 IS Projects Network Enhancement / Replacement 48 13 61 945 32 37 69 65 76 135 120 120 50 50 260 811138 SRIF 2 funded projects 48 13 61 3,691 3,049 656 3,705 -12 0 0 0 0 0 0 0 0137 Refurbishment <strong>of</strong> Fraser <strong>of</strong> Allander 51 10 61 2,250 2,163 -57 2,106 144 0 0 0 0 0 0 0 0121 Infrastructure - Sewers and underground services 49 11 60 120 38 2 40 9 45 10 16 0 0 0 0 71123 General Laboratory Refurbishments 50 10 60 0 0 0 0 0 0 0 0 0 0 0 0 0171 Cottrell Fire Alarm Upgrade 44 15 59 20 0 0 0 0 0 20 0 0 0 0 0 20149 Centre for Cancer Care Research 45 13 58 3,800 0 0 0 0 0 500 3,200 100 0 0 0 3,800115 Pathfoot CR - Capacity, Resilience and Disaster Recovery 44 13 57 0 0 0 0 0 0 0 0 0 0 0 0 0127 Heating and Hot Water Depressurisation 48 8 56 825 24 97 121 107 293 304 0 0 0 0 0 597124 Sports Projects refurb <strong>of</strong> new areas 45 10 55 1,000 0 6 6 63 31 100 50 50 50 50 600 931109 IS Projects MIS Applications 39 15 54 3,472 2,164 722 2,886 217 368 0 0 0 0 0 0 368110 Faculty SRIF3 Projects 39 15 54 1,290 0 100 100 344 846 0 0 0 0 0 0 846148 N&M Clinical Skills Facility 38 15 53 0 0 0 0 0 0 0 0 0 0 0 0 0116 Replacement <strong>of</strong> PABX 40 13 53 400 0 0 0 0 0 400 0 0 0 0 0 400145 Toilet, Corridor and Stair Refurbishments 40 13 53 28 3 23 26 2 0 0 0 0 0 0 0 0163 Landscaping <strong>of</strong> Queens Court and Logie Courtyard 35 15 50 300 0 0 0 0 0 300 0 0 0 0 0 300117 Asbestos Survey and Works 37 13 50 50 24 22 46 4 0 0 0 0 0 0 0 0140 Refurbishments at Buckieburn 37 13 50 34 4 0 4 0 20 10 0 0 0 0 0 30125 IS Projects Residences 40 10 50 466 113 53 166 28 68 204 0 0 0 0 0 272118 Pathfoot Boiler Replacement 36 13 49 500 0 0 0 27 125 348 0 0 0 0 0 473128 Spaces Moves - Cottrell/Pathfoot/Castle 41 8 49 2,143 38 807 845 488 638 172 0 0 0 0 0 810119 Disabled Egress Systems 35 13 48 60 0 0 0 0 30 30 0 0 0 0 0 60132 Replacement <strong>of</strong> Electrical Lighting and Distribution Boards 40 6 46 131 32 32 64 11 38 18 0 0 0 0 0 56164 Campus Security Measures 28 15 43 280 0 0 0 0 25 85 85 85 0 0 0 280122 Precautionary Structural Surveys <strong>of</strong> Buildings 32 11 43 70 2 2 4 10 11 45 0 0 0 0 0 56141 Sports Projects Pitches and Track 31 11 42 1,336 1,210 -25 1,185 0 101 50 0 0 0 0 0 151142 Sports Projects Tennis and Fitness 31 11 42 2,026 169 1,501 1,670 205 100 51 0 0 0 0 0 151129 Refurbishment <strong>of</strong> Catering Areas 34 8 42 160 0 0 0 0 20 70 0 70 0 0 0 160120 IS Projects Hierarchical Storage Management 28 13 41 500 0 0 0 290 0 0 0 210 0 0 0 210153 Aquaculture Aquatic Systems and Environmental Modelling Facility 31 10 41 100 0 0 0 0 0 100 0 0 0 0 0 100170 Upgrade and Extension <strong>of</strong> Campus Heating/Power Generation Systems 28 10 38 1,000 0 0 0 0 0 0 500 0 0 0 500 1,000165 Upgrading <strong>of</strong> Atrium 31 6 37 300 0 0 0 0 0 0 300 0 0 0 0 300130 CCTV Extension incorporating Analogue to Digital 28 8 36 7 7 0 7 0 0 0 0 0 0 0 0 0143 Cycle Provision, paths etc. 30 6 36 57 3 54 57 0 0 0 0 0 0 0 0 0133 Road Improvements 28 6 34 318 54 166 220 98 0 0 0 0 0 0 0 0146 Robbins Window/Cladding 23 10 33 30 0 19 19 1 0 10 0 0 0 0 0 10134 Refurbishment <strong>of</strong> Upgraded Areas in MacRobert 29 4 33 63 0 13 13 4 46 0 0 0 0 0 0 46144 Campus Lighting Improvements 13 13 26 250 4 6 10 0 0 200 40 0 0 0 0 240131 Campus Signage 18 8 26 260 0 16 16 28 66 99 51 0 0 0 0 216161 IS Interactive Web Architecture 20 6 26 250 0 0 0 0 0 0 100 100 50 0 0 250167 Improvements to Form Management School Entrance 14 10 24 40 0 0 0 0 0 40 0 0 0 0 0 40135 Institute <strong>of</strong> Sport Storage Extension 0 1 1 55 0 52 52 -6 9 0 0 0 0 0 0 9Savings Target -196 0 0 0 0 0 -196 0 0 0 0 0 -196128,229 11,305 6,747 18,052 9,453 8,657 9,016 36,306 10,468 7,751 5,046 23,482 100,7260147 Management Centre Extension 5,195 3 80 82 348 4,590 175 0 0 0 0 0 4,765148 External Facilities 258 95 139 234 2 23 0 0 0 0 0 0 23149 Football Academy 839 0 0 0 76 743 20 0 0 0 0 0 763150 Gannochy Refurbishment 26 0 26 26 0 0 0 0 0 0 0 0 0151 Loch Canoe Course 10 0 10 10 0 0 0 0 0 0 0 0 0152 Air conditioning - SaNS 37 0 18 18 19 0 0 0 0 0 0 0 0153 Alterations to Entrance at <strong>Stirling</strong> Management Centre 504 0 0 0 417 87 0 0 0 0 0 0 87154 Synthetic Putting Green 60 0 0 0 4 56 0 0 0 0 0 0 56155 Inverness Medi Centre 700 0 0 0 125 575 0 0 0 0 0 0 575156 Centre for Sporting Excellence Feasibility 50 0 0 0 0 50 0 0 0 0 0 0 50157 International Study Centre 471 0 0 0 0 460 11 0 0 0 0 0 471136,379 11,402 7,020 18,422 10,444 15,241 9,222 36,306 10,468 7,751 5,046 23,482 107,516Projects Not Scheduled173 Reconfiguration <strong>of</strong> Studies Area and Atrium 47 15 62 5,000 0 0 0 0 0 0 0 0 0 0 5,000 5,000160 IS Commercial Management System Replacement 39 15 54 500 0 0 0 0 0 0 0 0 0 0 500 500159 IS Accommodation System Replacement 37 15 52 500 0 0 0 0 0 0 500 0 0 0 0 500156 IS Student System Replacement 37 10 47 2,000 0 0 0 0 0 0 0 0 0 0 2,000 2,000150 <strong>Stirling</strong> Management School - New Build 29 15 44 10,000 0 0 0 0 0 0 0 0 500 9,500 0 10,000155 IS Finance System Replacement 34 10 44 1,500 0 0 0 0 0 0 0 0 0 0 1,500 1,500157 IS HR System Replacement 34 10 44 1,000 0 0 0 0 0 0 0 750 250 0 0 1,000158 IS Asset Management System Replacement 34 10 44 1,000 0 0 0 0 0 0 0 0 0 0 1,000 1,000169 Pathfoot Cladding and Double Glazing Upgrades 27 13 40 2,500 0 0 0 0 0 0 0 0 0 0 2,500 2,500147 Integrated Student Services Centre 24 15 39 0 0 0 0 0 0 0 0 0 0 0 0 0134 Refurbishment <strong>of</strong> Upgraded Areas in MacRobert 29 4 33 937 0 0 0 0 0 87 0 250 0 0 600 937174 Mailroom Entrance 22 8 30 75 0 0 0 0 0 75 0 0 0 0 0 75166 Improvements to Main <strong>University</strong> Entrance (incl Bus Stop) 16 10 26 100 0 0 0 0 0 0 0 0 100 0 0 100151 Finance Office Co-location 15 6 21 150 0 0 0 0 0 0 0 0 0 0 150 150172 Logie / Cottrell Link 18 1 19 800 0 0 0 0 0 0 0 0 0 0 800 800168 Surfacing <strong>of</strong> Car Park to Rear <strong>of</strong> Pathfoot 5 13 18 150 0 0 0 0 0 0 0 0 150 0 0 150162 Link Road Extension 11 6 17 250 0 0 0 0 0 0 250 0 0 0 0 25026,462 0 0 0 0 0 162 750 1,000 1,000 9,500 14,050 26,462162,841 11,402 7,020 18,422 10,444 15,241 9,384 37,056 11,468 8,751 14,546 37,532 133,97873


appendicesAppendix 7Action Plan1.2.3.4.5.6.7.8.Engage in the consultation processes relatedto planning policy, including revisions to theexisting Structure Plan and Local Plan and theintroduction <strong>of</strong> the new Local DevelopmentPlanMonitor planning applications and proposeddevelopments which could have implicationsfor the <strong>University</strong>’s <strong>estate</strong>. Introduce a processto ensure that those planning applicationsreceived are assessed for their implicationsIntroduce a process for handling anycommunication regarding statutorydesignations <strong>of</strong> buildings or the campusEnsure that the updated Campus DevelopmentPlan is enshrined in the current Local Plan andin due course in the Local Development PlanDevelop a Carbon Management Strategy forthe <strong>Stirling</strong> campusDevelop a Biodiversity Policy and ManagementPlan for the <strong>Stirling</strong> campusEnsure that the data from the EcologicalBaseline Survey is kept up to date and theimplications <strong>of</strong> any changes are shared withinE&CS and more widely within the <strong>University</strong>Prepare a Space Management Policy whichwill formalise the arrangements for spaceallocation and set standards for the planningand utilisation <strong>of</strong> space9. Agree and implement a Maintenance Strategywhich will ensure that tasks are properlyprioritised, that an appropriate balanceis struck between planned and reactivemaintenance, that maintenance records arefit for purpose and that customers are keptinformed10. Implement a Post Occupancy Evaluationprocess appropriate to the type <strong>of</strong> capitalworks undertake11. Monitor Historic Scotland’s review <strong>of</strong> the listingstatus <strong>of</strong> the <strong>Stirling</strong> Campus and engageHS and the local authority as appropriate toensure the most appropriate outcome12. Implement a process to ensure that the EstateStrategy is updated in line with changesto strategic thinking, that progress withimplementation is monitored regularly andthat the Finance and Infrastructure Committeereceives reports by exception13. Submit a report to the Scottish FundingCouncil each November summarising progressmade with implementation and highlightingkey changes75


Photography: John McPake, Tom Main, Renzo Mazzolini & Fred PhillipsThe <strong>University</strong> <strong>of</strong> <strong>Stirling</strong> is a charity registered in Scotland, number SC 011159Approved by <strong>University</strong> Court March 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!