12.07.2015 Views

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Water Resources Development Criteria/<strong>Standards</strong> Manual Chapter 2UNIT <strong>III</strong> - <strong>Sanitary</strong> <strong>Sewer</strong> <strong>Design</strong> <strong>Standards</strong>SubmittalsDevelopment Services will review the construction plans and issue written comments onthe submittal. The designer shall address comments received from Water Resources andplans shall be appropriately updated. Upon completion <strong>of</strong> all Water Resourcerequirements, an approval letter shall be issued.2.4 Pump Stations2.4.1 Conceptual Approval ProcessA conceptual design approval process will be required for pump stations. Includedwithin this process is a Concept <strong>Design</strong> Plan. <strong>Unit</strong> <strong>III</strong>, Chapter 5, Sections 5.2.1 and5.2.1.1 should be referenced for a detailed description <strong>of</strong> the process and requirements.An Engineering Report shall also accompany the Conceptual <strong>Design</strong> Plan. TheEngineering Report shall be prepared in accordance with <strong>Unit</strong> <strong>III</strong>, Chapter 5, Section5.2.1.2.2.4.2 Construction PlansUpon approval <strong>of</strong> the pump station Concept <strong>Design</strong> Plan and Engineering Report byWater Resources, construction plans shall be prepared and submitted in accordance with<strong>Unit</strong> <strong>III</strong>, Chapter 5, Section 5.2.2. This section shall be referenced for specificrequirements.2.5 Permits, Fees, and Contracts2.5.1 Local PermitsThe local tap permits shall be obtained from the <strong>City</strong>’s New Water and <strong>Sewer</strong> PermitOffice in the <strong>City</strong> County Building. The said permit shall only be issued to licensedsewer tap contractors. A fee will be assessed based on service size and connection point.2.5.1.1 Tap Permit to a <strong>Sewer</strong> MainA standard tap permit shall be obtained for all connections to a sewer main. Tappermits for new sewers will only be issued when the new sewer main has beenaccepted by the <strong>City</strong> or for which prime contractor releases have been granted.2.5.1.2 Tap Permit to a <strong>Sewer</strong> Structure2.5.2 State PermitsA special permit shall be obtained for any sewer tap connection to a sewerstructure other than a pipe. This applies to manholes, junction chambers, etc.Approval from Water Resources will be necessary before permit issuance.2.5.2.1 SPC-15 PermitAn IDEM construction permit must be obtained from IDEM prior tocommencement <strong>of</strong> sanitary sewer or lift station construction. The permit is inCreated: January 1, 2002 <strong>III</strong> - 2 - 6 <strong>City</strong> <strong>of</strong> <strong>Fort</strong> <strong>Wayne</strong>Revised:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!