12.07.2015 Views

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

Unit III - Sanitary Sewer Design Standards - City of Fort Wayne

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Resources Development Criteria/<strong>Standards</strong> Manual Chapter 5UNIT <strong>III</strong> - <strong>Sanitary</strong> <strong>Sewer</strong> <strong>Design</strong> <strong>Standards</strong>Pump Stations5.1 PurposeCHAPTER 5 – PUMP STATIONSThis chapter discusses the requirements for the design and construction <strong>of</strong> small wastewaterpumping stations. More specifically, the chapter:• Outlines submittal requirements as defined by the Department <strong>of</strong> Water Resources• Identifies the planning and design approach to be used for pump stations• Defines specific criteria by which pump stations will be designed• Discusses life cycle cost analysisThe chapter is designed to give general guidelines to be adhered to during pump station design.Water Resources shall be consulted before actual design to discuss features that may be requiredon a case-by-case basis.5.2 Submittal RequirementsSubmittals for pump stations shall consist <strong>of</strong> a Concept <strong>Design</strong> Plan, an Engineering Report, andFinal <strong>Design</strong> Plans. Approval by Water Resources will be required prior to authorization <strong>of</strong> anysucceeding design phase.5.2.1 Conceptual Approval ProcessThe Conceptual Approval process shall consist <strong>of</strong> Concept <strong>Design</strong> Plan and EngineeringReport formulation. The following sections outline specific requirements.5.2.1.1 Concept <strong>Design</strong> PlanThe purpose <strong>of</strong> a Concept <strong>Design</strong> Plan is to provide Water Resources withpreliminary design data for proposed pump stations and related appurtenancessuch as force mains. The preliminary data will allow Water Resources todetermine compatibility with existing systems and will provide the foundation forjustification <strong>of</strong> a pump station alternative.The Concept <strong>Design</strong> Plan shall include the following:A. A location plan which clearly shows the following information:• Ultimate tributary area with corresponding land use categories as definedby the <strong>City</strong>• Municipal boundaries• Phase boundariesCreated: January 1, 2002 <strong>III</strong> - 5 - 3 <strong>City</strong> <strong>of</strong> <strong>Fort</strong> <strong>Wayne</strong>Revised:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!