12.07.2015 Views

PM CTP CAT M EA P 4 X 3 v01 | 2009-02-01 - Elion

PM CTP CAT M EA P 4 X 3 v01 | 2009-02-01 - Elion

PM CTP CAT M EA P 4 X 3 v01 | 2009-02-01 - Elion

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Telesmart TMATelescopic pillars DC versionsPerformance diagramsLifting speed (mm/s)Lifting speed (mm/s)606050504040303<strong>02</strong><strong>02</strong><strong>01</strong><strong>01</strong>000 500 1 000 1 500 2 000 2 500Load (N)Lifting speed 2-channel control00 500 1 000 1 500 2 000 2 500Load (N)Lifting speed 3-channel control60Lifting speed (mm/s)7Current consumption (A)50640543<strong>02</strong>0321<strong>01</strong>00 500 1 000 1 500 2 000 2 500Load (N)Lifting speed 4-channel control00 200 400 600 800 1 000 1 200Load (N)Current-load diagramBending load diagramsPush load (N)Push load (N)1 00<strong>01</strong> 000900900800700Overload800700Overload600500Ideal range600500Ideal range40040030030<strong>02</strong>0<strong>02</strong>0<strong>01</strong>0<strong>01</strong>0000 100 200 300 400 500 600Load arm (mm)00 100 200 300 400 500 600Load arm (mm)Dynamic stress diagram on X axiswith maximum lift*Dynamic stress diagram on Y axiswith maximum lift** The values given apply to single lifting pillars. With a stable table structure the ideal field of use can be enlarged.88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!