12.07.2015 Views

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. PRELIMINARY WORKS3.1 Introduction3.1.1 A series <strong>of</strong> activities are proposed to be completed before the main <strong>Hinkley</strong> <strong>Point</strong> Cconstruction activities can commence. Some <strong>of</strong> these works can be completed priorto the determination <strong>of</strong> the DCO application and will be done at <strong>EDF</strong> Energy’s risk toallow the main construction works to start as soon after the decision as possible.3.2 Remediation and Associated Works3.2.1 Prior to commencing the site preparation works a small number <strong>of</strong> remediation andassociated works will have been undertaken in the northern part <strong>of</strong> the site. Theseworks were submitted as a stand-alone application separate from any proposals fordevelopment that might come forward in the future for <strong>Hinkley</strong> <strong>Point</strong> C. These workswere granted by Somerset County Council in January 2011, subject to conditions.3.2.2 The north-eastern part <strong>of</strong> the site includes a construction debris mound whichoriginated from the construction <strong>of</strong> the existing <strong>Hinkley</strong> <strong>Point</strong> Power Station Complex.Site investigations identified the presence <strong>of</strong> asbestos containing materials (ACMs) inthe mound and in areas in the vicinity <strong>of</strong> the mound. The proposed works includeremoving any potential hazard to human health and the environment which may becaused by the presence <strong>of</strong> asbestos containing materials on the site. The applicationprovided for the excavation and removal <strong>of</strong> the contaminated soil and the re-use <strong>of</strong>existing uncontaminated stockpiled materials as engineered fill within the site and asbackfilling material for the decommissioning <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> A.3.2.3 In addition to these remediation works, the application also included proposals forassociated works, including the creation <strong>of</strong> temporary areas <strong>of</strong> hardstanding formaterial segregation and stockpiling, plus temporary portacabin <strong>of</strong>fices. It alsoincluded proposals to create a temporary helipad.3.3 Preliminary Works3.3.1 To facilitate the construction <strong>of</strong> a new nuclear power station at <strong>Hinkley</strong> <strong>Point</strong> C, <strong>EDF</strong>Energy submitted two applications to undertake some preliminary works at the<strong>Hinkley</strong> <strong>Point</strong> C Development Site, comprising site preparation works and theconstruction and operation <strong>of</strong> a temporary jetty, which also provides for itsdismantling and removal once operation has ceased. These applications weresubmitted to West Somerset Council (WSC) and the Marine ManagementOrganisation (MMO) respectively.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!