3. PRELIMINARY WORKS3.1 Introduction3.1.1 A series <strong>of</strong> activities are proposed to be completed before the main <strong>Hinkley</strong> <strong>Point</strong> Cconstruction activities can commence. Some <strong>of</strong> these works can be completed priorto the determination <strong>of</strong> the DCO application and will be done at <strong>EDF</strong> Energy’s risk toallow the main construction works to start as soon after the decision as possible.3.2 Remediation and Associated Works3.2.1 Prior to commencing the site preparation works a small number <strong>of</strong> remediation andassociated works will have been undertaken in the northern part <strong>of</strong> the site. Theseworks were submitted as a stand-alone application separate from any proposals fordevelopment that might come forward in the future for <strong>Hinkley</strong> <strong>Point</strong> C. These workswere granted by Somerset County Council in January 2011, subject to conditions.3.2.2 The north-eastern part <strong>of</strong> the site includes a construction debris mound whichoriginated from the construction <strong>of</strong> the existing <strong>Hinkley</strong> <strong>Point</strong> Power Station Complex.Site investigations identified the presence <strong>of</strong> asbestos containing materials (ACMs) inthe mound and in areas in the vicinity <strong>of</strong> the mound. The proposed works includeremoving any potential hazard to human health and the environment which may becaused by the presence <strong>of</strong> asbestos containing materials on the site. The applicationprovided for the excavation and removal <strong>of</strong> the contaminated soil and the re-use <strong>of</strong>existing uncontaminated stockpiled materials as engineered fill within the site and asbackfilling material for the decommissioning <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> A.3.2.3 In addition to these remediation works, the application also included proposals forassociated works, including the creation <strong>of</strong> temporary areas <strong>of</strong> hardstanding formaterial segregation and stockpiling, plus temporary portacabin <strong>of</strong>fices. It alsoincluded proposals to create a temporary helipad.3.3 Preliminary Works3.3.1 To facilitate the construction <strong>of</strong> a new nuclear power station at <strong>Hinkley</strong> <strong>Point</strong> C, <strong>EDF</strong>Energy submitted two applications to undertake some preliminary works at the<strong>Hinkley</strong> <strong>Point</strong> C Development Site, comprising site preparation works and theconstruction and operation <strong>of</strong> a temporary jetty, which also provides for itsdismantling and removal once operation has ceased. These applications weresubmitted to West Somerset Council (WSC) and the Marine ManagementOrganisation (MMO) respectively.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 11