12.07.2015 Views

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. INTRODUCTION1.1.1 NNB Generation Company Limited (company number 06937084), part <strong>of</strong> <strong>EDF</strong>Energy, is the company that will ultimately make the Development Consent Orderapplication. For the purpose <strong>of</strong> this document, NNB Generation Company Limited isreferred to as <strong>EDF</strong> Energy.1.1.2 <strong>EDF</strong> Energy is planning to build a new nuclear power station at <strong>Hinkley</strong> <strong>Point</strong> nearBridgwater, Somerset, comprising two UK EPR reactor units with an expected output<strong>of</strong> approximately 1,630MW per unit.1.1.3 The new site, <strong>Hinkley</strong> <strong>Point</strong> C (<strong>HPC</strong>), is to the west <strong>of</strong> the existing <strong>Hinkley</strong> <strong>Point</strong>Power Station Complex. The new power station is based on replicating as much aspossible the design for the Flamanville 3 unit in Normandy, France, currently underconstruction.1.1.4 This paper describes the programme and methodology for constructing a newnuclear power station at <strong>Hinkley</strong> <strong>Point</strong> C and includes the following: Section 2 outlines the strategic construction programme for the <strong>Hinkley</strong> <strong>Point</strong> CProject including the proposed preliminary works, construction <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> Cand the construction and operation <strong>of</strong> the associated developments. Section 3 describes any applications separate to the application for DevelopmentConsent for works on-site prior to the main construction phase, including thepreliminary works (site preparation works and the temporary jetty) to facilitate theconstruction <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> C. Section 4 sets out the programme and key construction phases for theconstruction <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> C. A description is provided for the key constructionactivities, including proposed land use and site facilities. Section 5 describes the construction logistics strategy for the <strong>Hinkley</strong> <strong>Point</strong> CDevelopment Site (including management <strong>of</strong> freight and materials, and theconstruction workforce).DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!