4.3.52 The majority <strong>of</strong> the mechanical and electrical activity will take place within the powerstation buildings in the north <strong>of</strong> the site. However, some <strong>of</strong> the contractors’compounds will be located in the southern part <strong>of</strong> the site. A significant proportion <strong>of</strong>the piping and ventilation ductwork will be pre-fabricated before installation, either atthe manufacturers’ works or on-site.4.3.53 Most <strong>of</strong> the mechanical and electrical equipment will be delivered by road, althoughsome items, such as small bore pipework, cable, and items manufactured abroad,may be suitable for sea delivery. Suppliers will be encouraged to use sea transportwhere practicable.4.3.54 Approximately 180 mechanical and electrical plant items, e.g. the reactor pressurevessels, will be very large and/or heavy and will require special transport to site.These are classified as Abnormal Indivisible Loads (AILs) and will be shipped toCombwich Wharf by sea and then taken to site by road using special trailers. Theseitems will be taken straight to their final location and installed using special lifting andhandling equipment.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!