Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Land UseArea (ha)Nuclear steam supply system contractor 2.1Mechanical and electrical erection contractor 2.1Main turbine contractor 1.9Heavy fabrication workshop 1.1Roads and networks contractor 0.9Total 173.54.1.15 The land uses will change throughout the construction phase, reflecting the differentstages <strong>of</strong> development activity. For example, the area allocated to the civil workscontractor will be reduced and the spare land reallocated to the main mechanical andelectrical contractors as the balance <strong>of</strong> work on the site changes.b) <strong>Construction</strong> Schedule and Phasing4.1.16 This section sets out the construction programme and the key phases within it.Figures 4.1 - 4.4, at the back <strong>of</strong> this document, are indicative phasing plans for thefull construction phase from site preparation through to completion <strong>of</strong> <strong>Hinkley</strong> <strong>Point</strong> Cand land restoration. The series <strong>of</strong> plans identifies the construction activities at keyphases in the construction programme, however it should be noted that these aresubject to refinement and schedule changes. It should also be noted that within themain construction site areas there will be activities and uses that will remainundefined, including minor temporary facilities and structures.4.1.17 At the time <strong>of</strong> Development Consent being granted, anticipated to be in 2012, anumber <strong>of</strong> construction activities are expected to have been completed or beunderway as follows: The temporary jetty is under construction, utilising a temporary beach accessroad. Holford Stream has been culverted, the access roundabouts and initial haulageroads have been built and the material stockpiles are in use. The southern part <strong>of</strong> the western site boundary has been landscaped and planted. A temporary earth retaining structure has been built at the low-lying section <strong>of</strong> thecoastline to enable a level platform to be established behind. A permanent station car park has been constructed and others are underconstruction. The main platform areas have been established and excavation <strong>of</strong> the areas forthe main plant buildings has started. Contractors’ working areas have been established. The base for the reactor building liner fabrication building has been prepared. Water management zones have been established for the management <strong>of</strong>drainage.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!