Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The installation <strong>of</strong> mechanical and electrical equipment is under way. The Public Information Centre, permanent site <strong>of</strong>fices and the outage accesscontrol building are complete. Temporary access to the Public Information Centreis established via the south-eastern permanent station car park. The on-site accommodation campus is complete. The National Grid 400kV substation is under construction.4.1.21 Figure 4.3 shows the indicative layout <strong>of</strong> the construction site at the time when unit 1commences operation, anticipated to be mid-2018, where: Unit 1 is complete and is fenced <strong>of</strong>f from the rest <strong>of</strong> the construction site. The ancillary buildings for both units are complete. The National Grid 400kV substation is complete and National Grid’s lines havebeen diverted to connect the substation. Unit 2 buildings are substantially complete and mechanical and electricalequipment installation is nearing completion. The interim storage buildings for intermediate level waste and spent fuel areunder construction.4.1.22 Figure 4.4 shows the indicative layout <strong>of</strong> the construction site at the time when unit 2commences operation where: Both units <strong>of</strong> the power station are complete and fenced <strong>of</strong>f from the rest <strong>of</strong> theconstruction site. <strong>Construction</strong> <strong>of</strong> the interim storage buildings is complete. Many <strong>of</strong> the contractors’ temporary facilities are being dismantled and removed.4.1.23 After the start-up <strong>of</strong> unit 2, the following activities will be undertaken: The temporary jetty will be dismantled and removed. The on-site accommodation campus will be closed, the buildings dismantled andremoved and the area cleared. The contractors’ areas will be cleared and temporary services removed. Temporary re-routing <strong>of</strong> the emergency access road will be established to allowthe final landscaping to be undertaken in the southern construction area. The remaining buildings will be completed. Final landscaping and planting will be undertaken, incorporating the finalalignment <strong>of</strong> the emergency access road and the access road to the PublicInformation Centre.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!