4.3.9 The intake and outfall structures will be prefabricated <strong>of</strong>fsite and floated into positionover the connecting shafts before being lowered into position. The fish recovery andreturn system associated with the cooling water infrastructure and is likely to lie withinthe area identified on the phasing plans as the ‘Area for Fish Recovery and ReturnSystems and Associated Infrastructure’ (see Figures 4.1 - 4.4). The return pipe <strong>of</strong>the fish recovery and return system would be tunnelled under the foreshore.d) Ancillary Buildings4.3.10 The proposed ancillary buildings will be predominantly steel-framed although somereinforced concrete is used. <strong>Construction</strong> activities for the ancillary buildings willgenerally be similar to the conventional island buildings.e) <strong>Construction</strong> <strong>of</strong> the On-site Accommodation Campus4.3.11 The proposed on-site accommodation campus, as illustrated in Figure 4.5, wouldcomprise: accommodation blocks; amenity buildings; access roads, car parking, cycle facilities and footpaths; external sports pitches (accessible to the public) and associated welfare facilities; security <strong>of</strong>fice; access to the main construction site by turnstiles; and drainage, landscaping and ecological features.Figure 4.5: On-site CampusDRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!