12.07.2015 Views

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

Draft Overview of HPC Construction - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

c) Working Hours5.3.4 The working patterns <strong>of</strong> particular groups <strong>of</strong> workers will be determined by the needs<strong>of</strong> the construction phase. Security staff will work shifts to cover the full 24-hourperiod with higher numbers on duty at times <strong>of</strong> workforce shift changeover and peakmaterial deliveries. Similarly, catering and cleaning staff will not necessarily work thesame shift patterns as other staff. Most <strong>of</strong>fice workers will work a normal day shift.Further information on shift patterns can be found in the <strong>Draft</strong> Workforce Pr<strong>of</strong>ileReport.d) Site Access and Security5.3.5 Workers will access the site via turnstiles operated by their identity passes. They willbe subject to searches in accordance with the site security plan as they enter andleave the site. The main personnel access is in the northern part <strong>of</strong> the site where thebusses set down and pick up. Additional access turnstiles will be provided at thesouth entrance for freight vehicle drivers and workers staying at the on-site campus.e) Site Offices and Welfare Facilities5.3.6 As previously mentioned, the individual contractors will be required to providechanging, welfare and all other necessary facilities for their own staff within theircompounds. <strong>EDF</strong> Energy will also provide welfare facilities including toilets, canteensand a medical centre supplemented by first aid points within the main constructionarea for the use <strong>of</strong> all workers.5.3.7 The medical centre will provide a 24-hour service. In addition to the treatment <strong>of</strong>minor injuries and ailments, the medical centre will provide preventative health care.In the event <strong>of</strong> any serious injuries, the on-site medical team will provide first aid andthe local emergency services will be called to take any casualties to hospital.5.3.8 Drug and alcohol testing will be carried out in accordance with the site policies onworkers entering the site. Smoking will not be permitted on-site except within clearlydesignated smoking areas.5.3.9 The on-site campus will be separated from the main construction site by a securityfence. The campus will provide accommodation and recreation facilities and willoperate independently <strong>of</strong> the main construction site.5.4 <strong>Construction</strong> Waste and Excavated Materials5.4.1 All material excavated on site will be stored in designated areas for re-use. Theexcavated material will be utilised for construction <strong>of</strong> the site terraces or platforms aspart <strong>of</strong> the back-fill for the power station excavations or for landscaping.5.4.2 There will be a policy <strong>of</strong> waste reduction which will include reducing packagingmaterial, consistent with the need for protection <strong>of</strong> sensitive items; re-use <strong>of</strong> itemsand recycling <strong>of</strong> remaining materials. This will be facilitated by the appointment <strong>of</strong> asite waste management contractor, who will receive the construction waste from thevarious construction and erection contractors and take the accumulated waste toappropriate sorting and recycling facilities. Further details on the management <strong>of</strong>waste arising from the <strong>Hinkley</strong> <strong>Point</strong> C Project are provided in the <strong>Draft</strong><strong>Construction</strong> Phase Waste Management Strategy.DRAFT | <strong>Overview</strong> <strong>of</strong> <strong>HPC</strong> <strong>Construction</strong> | February 2011 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!