12.07.2015 Views

Drainage Design Manual - the City of San Luis Obispo

Drainage Design Manual - the City of San Luis Obispo

Drainage Design Manual - the City of San Luis Obispo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Native vegetation shall be preserved and enhanced within <strong>the</strong> zone <strong>of</strong> separation, creating<strong>the</strong> vegetated berm. It may be necessary in some cases to add to <strong>the</strong> height <strong>of</strong> <strong>the</strong> naturalberm to confine <strong>the</strong> design flow to <strong>the</strong> main channel and secondary flow to <strong>the</strong> by-passarea.• The bottom or invert <strong>of</strong> <strong>the</strong> secondary channel and alternate floodplain shall beconstructed above <strong>the</strong> elevation <strong>of</strong> <strong>the</strong> 2-year peak flow to avoid interception <strong>of</strong> low flow.The vegetated berm is also necessary to confine <strong>the</strong> 2-year flow to <strong>the</strong> main channel andto maintain sufficient channel forming flows within <strong>the</strong> primary channel to preserve itsfunctions and values and provide sediment transport.5.3.3 Modified ChannelsThis <strong>Design</strong> <strong>Manual</strong> recognizes that a Constructed Natural Channel may not be able to bebuilt at some locations because <strong>of</strong> space constraints or unusual bank stability problems anderosive conditions. Certain geotechnical and geomorphic conditions may necessitate <strong>the</strong> use <strong>of</strong>hard channel linings, which generally preclude construction <strong>of</strong> a floodplain terrace. The designengineer shall submit a narrative to <strong>the</strong> <strong>City</strong> Engineer or County Public Works Directorrationalizing <strong>the</strong> selection <strong>of</strong> a Modified Channel, or <strong>the</strong> use <strong>of</strong> hard channel lining for erosionprotection. The following design criteria pertain to Modified Channels:• Modified channels shall be designed to convey <strong>the</strong> appropriate recurrence interval <strong>Design</strong>Flow event as described in Section 5.2.• Freeboard shall be 0.3 meters (1 ft) above <strong>the</strong> design flow. A freeboard <strong>of</strong> 1.0 m (3.3 ft)is required beneath new bridges and utility crossings.• <strong>Design</strong> channel bottom slopes shall be from 0.2 to 0.6 percent.• <strong>Design</strong> side slopes shall be no steeper than 2:1 (two horizontal to one vertical [2H:1V])for rock lined channels, and 2.5H:1V for ear<strong>the</strong>n, grass lined or vegetated channels.Special designs are required for steeper slopes and must be approved by <strong>the</strong> <strong>City</strong> orCounty.• Channel Cross Section may be parabolic or trapezoidal• Alignment- Sharp curves shall not be used. Centerline curves shall not have a radius <strong>of</strong>less than twice <strong>the</strong> design flow top width, and will typically be 3 times <strong>the</strong> averagechannel width, or 10-meters (33-ft.), whichever is greater.• Where a new low-flow channel or channel relocation is required, bottom width shall be 6to 8 times depth <strong>of</strong> flow.• Hydraulic Grade Line- The design hydraulic grade line, or water surface pr<strong>of</strong>ile, shall beshown on all improvement plans for open channels. Supporting calculations andhydraulic model runs should be attached.• Velocity restrictions for channels with varying soil materials and linings are provided inTable 5-1.SLO Creek <strong>Drainage</strong> <strong>Design</strong> <strong>Manual</strong> 46 February 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!