12.07.2015 Views

Drainage Design Manual - the City of San Luis Obispo

Drainage Design Manual - the City of San Luis Obispo

Drainage Design Manual - the City of San Luis Obispo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Step 4 Project Approval and Permitting:Determine if project can be submitted as part <strong>of</strong> <strong>City</strong> or County Annual Work Plan,(AWP) associated with <strong>the</strong> Stream Management and Maintenance Program -IndividualPermit; if not initiate permitting with <strong>the</strong> following:Corps <strong>of</strong> Engineers Sect. 404 PermitRegional Board Water Quality CertificationFish & Game Stream Bed Alteration agreementReview for compliance with <strong>City</strong>/County Policies and RequirementsCEQA review and complianceLocal Grading/Building PermitsStep 5 Construction DrawingsSubmit Construction Drawings for Plan Check review; revise as necessaryStep 6 Construction Inspection & MonitoringInspection by project engineer and <strong>City</strong> or County Building/Public Works InspectorStep 7 Post Construction Maintenance and MonitoringMonitor project for erodibility/stability maintenance needs and conformance withmitigation requirements.Biological inspection/monitoring for permit conditions and mitigation requirements.6.5.2 Detailed <strong>Design</strong> ProceduresStep 1 - Site Evaluation and AnalysisProblem IdentificationA bank repair project design must address <strong>the</strong> fundamental and underlying problems responsiblefor <strong>the</strong> failure, or <strong>the</strong> project will be prone to failure at some time in <strong>the</strong> future. This includesidentification <strong>of</strong> both <strong>the</strong> probable cause <strong>of</strong> failure and <strong>the</strong> mode <strong>of</strong> failure. Stabilization designsthat are imposed as a solution on a site without this understanding could transfer <strong>the</strong> problem to<strong>the</strong> o<strong>the</strong>r side <strong>of</strong> <strong>the</strong> channel, shift it upstream or downstream, or result in failure and/or costlyon-going maintenance. In addition, designs that impinge into <strong>the</strong> channel can cause localbackwater flooding effects. These consequences should be anticipated and evaluated prior toproject design, and <strong>the</strong> design modified to reflect <strong>the</strong>se circumstances, and is a reference forgeomorphic analysis: http://www.fhwa.dot.gov/bridge/hydpub.htmTypically, causative factors are grouped according to whe<strong>the</strong>r <strong>the</strong>y are from: (1) regionalhydraulic forces such as high shear stresses and altered run<strong>of</strong>f patterns, and consequent channelincision; (2) local hydraulic forces such as from a fallen tree trunk diverting flow against <strong>the</strong>bank, or o<strong>the</strong>r problems from sediment or debris accumulation; or (3) geotechnical instabilitiessuch as s<strong>of</strong>t or weak bank soils, and/or prolonged channel bank saturation. Most <strong>of</strong>ten severalSLO Creek <strong>Drainage</strong> <strong>Design</strong> <strong>Manual</strong> 55 February 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!