4-26 VISALIA GENERAL PLAN UPDATE<br />
Table 4-7: Future Intersection LOS (2030)<br />
No. Intersection<br />
Control<br />
Type<br />
AM Peak Hour PM Peak Hour<br />
Delay LOS Delay LOS<br />
14 Mineral King Avenue/Akers Street Signal 40.9 D 40.5 D<br />
15 Noble Avenue/Akers Street Signal 33.8 C 52.5 D<br />
16 Noble Avenue/Watson Street Signal 129 B 9.6 A<br />
17 Riggin Avenue/Demaree Street Signal 29.9 C 24.8 C<br />
18 Riggin Avenue/Dinuba Boulevard Signal 22.2 C 24.4 C<br />
19 Riggin Avenue/Giddings Street1 Signal 19.5 B 23.5 C<br />
20 Riggin Avenue/Shirk Road1 Signal 32.9 C 26.2 C<br />
21 Tulare Avenue/Santa Fe Street1 Signal 26.2 C 25.5 C<br />
22 Visalia Parkway/Akers Street1 Signal 23.7 C 24.4 C<br />
23 Walnut Avenue/Shirk Road1 Signal 20.2 C 18.8 B<br />
24 Whitendale Avenue/Demaree Street Signal 8.2 A 11.8 A<br />
25 Whitendale Avenue/Woodland Drive TWSC 14.6 B 21.9 C<br />
TWSC = Two-Way-Stop Control; AWSC = All-Way-Stop Control; OWSC = One-Way-Stop Control;<br />
<strong>For</strong> Signalized Intersections Average Delay = Average Intersection Delay; <strong>For</strong> TWSC Intersections Average Delay = Worst-Case Intersection<br />
Movement Delay; <strong>For</strong> Signalized Intersections LOS = Average Intersection Level-of-Service; <strong>For</strong> TWSC Intersections LOS = Worst-Case Movement’s<br />
Level-of-Service<br />
1. With planned traffic signal.<br />
2. With planned lane modifications.<br />
Source: Omni-Means, 2012.