General Plan Update Review Committee Draft Elements Part 2 For ...
General Plan Update Review Committee Draft Elements Part 2 For ...
General Plan Update Review Committee Draft Elements Part 2 For ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4-40 VISALIA GENERAL PLAN UPDATE<br />
St. Johns River, Cameron Creek,<br />
Packwood Creek, Mill Creek, Modoc<br />
Ditch, the Santa Fe Railroad rightof-way<br />
and the San Joaquin Railroad<br />
right-of-way;<br />
• Provide Class II bikeways (striped<br />
bike lanes) along selected collector<br />
and arterial streets; and<br />
• Provide Class III bikeways (shareduse<br />
bike routes) along selected local,<br />
collector, and arterial streets.<br />
New bikeway segments should be designed to fit<br />
together with existing bikeways to create a comprehensive,<br />
safe system including scenic routes for<br />
recreational use.<br />
T-P-40 Develop a community-wide trail system along<br />
selected planning area waterways, consistent<br />
with the Waterways and Trails Master <strong>Plan</strong><br />
and <strong>General</strong> <strong>Plan</strong> diagrams.<br />
The system will feature greenway trail corridors<br />
along the St. John’s River, Mill Creek, Packwood<br />
Creek, and Cameron Creek, as well as segments<br />
of Modoc and Persian creeks. The waterway<br />
corridors will provide recreational opportunities,<br />
new links between neighborhoods, parks,<br />
and Downtown, and a new way of experiencing<br />
the City and understanding its natural setting.<br />
Waterway corridors will also provide enhanced<br />
habitat and storm drainage, as described in the<br />
Community Waterways section.<br />
T-P-41 Integrate the bicycle transportation system<br />
into new development and infill redevelopment.<br />
Development shall provide short term<br />
bicycle parking and long term bicycle storage<br />
facilities, such as bicycle racks, stocks,<br />
and rental bicycle lockers. Development also<br />
shall provide safe and convenient bicycle and<br />
pedestrian access to high activity land uses<br />
such as schools, parks, shopping, employment,<br />
and entertainment centers.<br />
T-P-42 Periodically update the City of Visalia Bikeway<br />
<strong>Plan</strong>, as needed.<br />
T-P-43 *Develop and maintain an educational program<br />
to promote bicycle use and safety.<br />
T-P-44 *Increase the safety of those traveling by bicycle<br />
by:<br />
• Sweeping and repairing bicycle paths<br />
and lanes on a regular basis;<br />
• Ensuring that bikeways are signed<br />
and delineated according to Caltrans<br />
or City standards, and that lighting is<br />
provided as needed;<br />
• Providing bicycle paths and lanes on<br />
bridges and overpasses;<br />
• Ensuring that all new and improved<br />
streets have bicycle-safe drainage<br />
grates and are free of hazards such as<br />
uneven pavement or gravel;<br />
• Providing adequate signage and<br />
markings warning vehicular traffic of<br />
the existence of merging or crossing<br />
bicycle traffic where bike lanes and<br />
routes make transitions into or across<br />
roadways.