02.12.2012 Views

General Plan Update Review Committee Draft Elements Part 2 For ...

General Plan Update Review Committee Draft Elements Part 2 For ...

General Plan Update Review Committee Draft Elements Part 2 For ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4-48 VISALIA GENERAL PLAN UPDATE<br />

4.10 REGIONAL COORDINATION<br />

The transportation system of a community is vital to<br />

its prosperity. Efficient circulation is important to the<br />

economic viability and the creation and preservation<br />

of a quality of life and the environment. The transportation<br />

system is also multi-modal, meaning that<br />

it provides numerous alternatives to the automobile;<br />

these other modes include transit, pedestrian facilities,<br />

bicycle facilities, rail facilities, airport facilities,<br />

etc., so that citizens and visitors can access and travel<br />

within the city using a number of transportation<br />

options to reduce vehicle trips and improve air quality.<br />

The City of Visalia works with other cities, the Tulare<br />

County Association of Governments (TCAG), Caltrans<br />

and the federal government to assist in transportation<br />

planning efforts in the County of Tulare.<br />

TCAG and state and federal agencies work with the<br />

cities and communities in Tulare County to plan for<br />

and fund transportation improvements beneficial to<br />

all of its residents.<br />

Objectives<br />

T-O-19 Ensure compatibility between circulation and<br />

transportation systems in Visalia and adjacent<br />

jurisdictions.<br />

T-O-20 Work with Caltrans to provide an efficient<br />

system for regional travel that minimizes<br />

impacts on local streets and arterials.<br />

T-O-21 *Strive to minimize the effects of local travel<br />

on the regional highway system.<br />

Policies<br />

T-P-75 *Work with Caltrans to achieve timely construction<br />

of programmed freeway, State highway,<br />

and interchange improvements.<br />

T-P-76 Work with TCAG, the city of Tulare, and<br />

Caltrans to plan and develop State highway<br />

improvements between Visalia and Tulare for<br />

regional circulation, consistent with Caltrans’<br />

Transportation Concept Reports for individual<br />

state routes.<br />

T-P-77 *Work with TCAG to ensure that the<br />

Regional Transportation <strong>Plan</strong> (RTP) and Sustainable<br />

Communities Strategy are consistent<br />

with Visalia’s Land Use and Transportation<br />

policies.<br />

T-P-78 Work with the San Joaquin Valley Air Pollution<br />

Control District and TCAG to implement<br />

Transportation Control Measures identified<br />

in the RTP and air quality implementation<br />

plans.<br />

T-P-79 *<strong>Update</strong> traffic study requirements, consistent<br />

with Policy T-P-18, to include analysis of<br />

impacts on the regional highway system and<br />

criteria for mitigation, consistent with this<br />

<strong>General</strong> <strong>Plan</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!