Proposed <strong>Transmission</strong> ProjectsZone 2: South East Minnesota• Rochester is the majorload center. RPU owned.• Increased interest inrenewable generation inthis area.• Max Generation: 2422MW• Except in the vicinity ofRochester this area isprimarily rural withminimal load growth• CAPX <strong>20</strong><strong>20</strong> La Crosse345 kV line will addsubstantial capability toserve Rochester• Issues• Wind generationpotential• Aging 69 kVinfrastructure