<strong>20</strong>09 Bridge Study Strategic Vision: Scenario 1High Internal Renewable• Scenario 1-- High Minnesota onlyrenewable development• Normal load growth• Minnesota will continue RES obligation• Surrounding states do not expand abovetheir present minimal RES obligations, ordevelop internally and require no deliveryfrom Minnesota or North and SouthDakota• Statistics• 1,<strong>10</strong>0 miles of 345 kV double circuit• 1<strong>10</strong> miles of 500 kV• Total estimated cost of: ~$4 billion