Proposed <strong>Transmission</strong> ProjectsZone 8: Minnesota Valley Area• Mankato is the primary loadcenter• New Helena substation for theCAPX <strong>20</strong><strong>20</strong> Group 1 projects• Issues- Local load serving- Wind interconnectioninterest• New 345/115/69 kV substationis planned between Wilmarthand Helena substations forload serving purposes. Theproposed in-service date forthis project is <strong>20</strong>12