Fargo Area• The largest loads in this areaare Red River, Cass Countyand Moderow substationsserved by the 115 kV lines inthe area• Several transmissioncontingencies would requireshedding load during peakand off peak conditions tomeet NERC TPL-003standard• The proposed plan is to builda new 5 mile 115 kV line fromMaple River substation toRed River substation, toprovide the redundancyneeded to mitigate anyviolations during Category Ccontingencies