Major Changes from <strong>20</strong><strong>10</strong>• Corridor Update Project Removed from proposedprojects– The need for the Corridor Updateproject has pushed the potential in-service dateout past the current planning horizon due toamounts of generation needed for meeting RESrequirements• <strong>NSP</strong>/<strong>NSP</strong>W reached a new system peak summer<strong>20</strong>11, as did the MISO footprint